Scope of tile and marble
This page is tile, ceramic and marble only, not the interior-finishing page that gathers the trades. This detail belongs only to Tile and marble and is not pasted onto another trade. The surface in question is A stable floor or wall, clean, and waterproofed in the wet zone before bedding if waterproofing is required under the tile., and the exclusion is explicit: Wall plastering as a method, gypsum ceilings, paint systems, and coordinating the room’s trades on one page are refused..
Waterproofing of the wet zone is stated as a condition under the tile if it is in the agreement, and the page does not become a ceiling or paint guide. This detail belongs only to Tile and marble and is not pasted onto another trade. The surface in question is A stable floor or wall, clean, and waterproofed in the wet zone before bedding if waterproofing is required under the tile., and the exclusion is explicit: Wall plastering as a method, gypsum ceilings, paint systems, and coordinating the room’s trades on one page are refused..
If Lippage between two tiles, water ponding away from the drain, an empty grout joint, a marble crack with no movement joint, or salt on porous stone on the coast. appears, this trade is reopened on the same surface. Work stops when Bedding stops if surface heat exceeds the adhesive open time, or if salt wind hits exposed marble before it is protected.. Inspection uses A notched trowel, spacers or wedges, a straightedge, and a spirit level to check the fall toward the drain., and the agreed measure is By the square metre of tile, ceramic or marble after deductions, and it is not merged with the gypsum or paint metre.. After handover, care stays within Repointing a short grout joint and cleaning residue during the defects period, and keeping acids off marble..
Wall plastering as a method, gypsum ceilings, paint systems, and coordinating the room’s trades on one page are refused. If the project needs Interior finishing, the details are on the Interior finishing page. Interior finishing distributes the room’s trades and keeps each measure on its own page, while this page lays tile, ceramic and marble and refuses to explain the gypsum frame, the plastering method and the paint system.
We carry out Tile and marble in cities across Saudi Arabia. Season and access change from one city to another. Open your city from the region pages for the visit date, and stay here for how Tile and marble itself is done.
When we carry out tile and marble
An owner who wants a tile or marble surface with a clear level and fall, not a full finishing package. This detail belongs only to Tile and marble and is not pasted onto another trade. The surface in question is A stable floor or wall, clean, and waterproofed in the wet zone before bedding if waterproofing is required under the tile., and the exclusion is explicit: Wall plastering as a method, gypsum ceilings, paint systems, and coordinating the room’s trades on one page are refused..
It is requested after the floor is stable and drain and door positions are known, so fall and level can be set. This detail belongs only to Tile and marble and is not pasted onto another trade. The surface in question is A stable floor or wall, clean, and waterproofed in the wet zone before bedding if waterproofing is required under the tile., and the exclusion is explicit: Wall plastering as a method, gypsum ceilings, paint systems, and coordinating the room’s trades on one page are refused..
It is not requested to explain wall paint, ceiling and tile in one text, nor to plaster a room that has no tile. This detail belongs only to Tile and marble and is not pasted onto another trade. The surface in question is A stable floor or wall, clean, and waterproofed in the wet zone before bedding if waterproofing is required under the tile., and the exclusion is explicit: Wall plastering as a method, gypsum ceilings, paint systems, and coordinating the room’s trades on one page are refused..
If Lippage between two tiles, water ponding away from the drain, an empty grout joint, a marble crack with no movement joint, or salt on porous stone on the coast. appears, this trade is reopened on the same surface. Work stops when Bedding stops if surface heat exceeds the adhesive open time, or if salt wind hits exposed marble before it is protected.. Inspection uses A notched trowel, spacers or wedges, a straightedge, and a spirit level to check the fall toward the drain., and the agreed measure is By the square metre of tile, ceramic or marble after deductions, and it is not merged with the gypsum or paint metre.. After handover, care stays within Repointing a short grout joint and cleaning residue during the defects period, and keeping acids off marble..
A request for Tile and marble starts when the client names the city, the building and the limit of work. The office is in Jeddah, and visits in other cities are arranged by distance. This page explains the work itself.
Materials for tile and marble
The materials of Tile and marble are listed below. Each one has an acceptance rule. If the rule is missed, the batch is rejected before the work continues.
Tile or ceramic matching the sample
In Tile and marble, “Tile or ceramic matching the sample” means Size and absorption match the approved sample so a floor type is not mixed with a smooth slippery wall type. It applies to A stable floor or wall, clean, and waterproofed in the wet zone before bedding if waterproofing is required under the tile., and it is not accepted if Lippage between two tiles, water ponding away from the drain, an empty grout joint, a marble crack with no movement joint, or salt on porous stone on the coast. appears.
The check uses A notched trowel, spacers or wedges, a straightedge, and a spirit level to check the fall toward the drain., and work stops when Bedding stops if surface heat exceeds the adhesive open time, or if salt wind hits exposed marble before it is protected.. The measure is By the square metre of tile, ceramic or marble after deductions, and it is not merged with the gypsum or paint metre., then care stays as follows: Repointing a short grout joint and cleaning residue during the defects period, and keeping acids off marble.. Wall plastering as a method, gypsum ceilings, paint systems, and coordinating the room’s trades on one page are refused.
Marble of one grade
In Tile and marble, “Marble of one grade” means Veins and thickness are checked before bedding, and a cracked stone is refused rather than hidden with grout. It applies to A stable floor or wall, clean, and waterproofed in the wet zone before bedding if waterproofing is required under the tile., and it is not accepted if Lippage between two tiles, water ponding away from the drain, an empty grout joint, a marble crack with no movement joint, or salt on porous stone on the coast. appears.
The check uses A notched trowel, spacers or wedges, a straightedge, and a spirit level to check the fall toward the drain., and work stops when Bedding stops if surface heat exceeds the adhesive open time, or if salt wind hits exposed marble before it is protected.. The measure is By the square metre of tile, ceramic or marble after deductions, and it is not merged with the gypsum or paint metre., then care stays as follows: Repointing a short grout joint and cleaning residue during the defects period, and keeping acids off marble.. Wall plastering as a method, gypsum ceilings, paint systems, and coordinating the room’s trades on one page are refused.
Adhesive within its open time
In Tile and marble, “Adhesive within its open time” means It is combed with the notched trowel and covered before its face skins in summer heat. It applies to A stable floor or wall, clean, and waterproofed in the wet zone before bedding if waterproofing is required under the tile., and it is not accepted if Lippage between two tiles, water ponding away from the drain, an empty grout joint, a marble crack with no movement joint, or salt on porous stone on the coast. appears.
The check uses A notched trowel, spacers or wedges, a straightedge, and a spirit level to check the fall toward the drain., and work stops when Bedding stops if surface heat exceeds the adhesive open time, or if salt wind hits exposed marble before it is protected.. The measure is By the square metre of tile, ceramic or marble after deductions, and it is not merged with the gypsum or paint metre., then care stays as follows: Repointing a short grout joint and cleaning residue during the defects period, and keeping acids off marble.. Wall plastering as a method, gypsum ceilings, paint systems, and coordinating the room’s trades on one page are refused.
Adjusted bed for thick marble
In Tile and marble, “Adjusted bed for thick marble” means Extra thickness is taken in the bed so the face stays at one level with the neighbouring tile. It applies to A stable floor or wall, clean, and waterproofed in the wet zone before bedding if waterproofing is required under the tile., and it is not accepted if Lippage between two tiles, water ponding away from the drain, an empty grout joint, a marble crack with no movement joint, or salt on porous stone on the coast. appears.
The check uses A notched trowel, spacers or wedges, a straightedge, and a spirit level to check the fall toward the drain., and work stops when Bedding stops if surface heat exceeds the adhesive open time, or if salt wind hits exposed marble before it is protected.. The measure is By the square metre of tile, ceramic or marble after deductions, and it is not merged with the gypsum or paint metre., then care stays as follows: Repointing a short grout joint and cleaning residue during the defects period, and keeping acids off marble.. Wall plastering as a method, gypsum ceilings, paint systems, and coordinating the room’s trades on one page are refused.
Grout suited to the joint width
In Tile and marble, “Grout suited to the joint width” means It fills the joint without a void, and it is not packed into a movement joint that needs a flexible seal. It applies to A stable floor or wall, clean, and waterproofed in the wet zone before bedding if waterproofing is required under the tile., and it is not accepted if Lippage between two tiles, water ponding away from the drain, an empty grout joint, a marble crack with no movement joint, or salt on porous stone on the coast. appears.
The check uses A notched trowel, spacers or wedges, a straightedge, and a spirit level to check the fall toward the drain., and work stops when Bedding stops if surface heat exceeds the adhesive open time, or if salt wind hits exposed marble before it is protected.. The measure is By the square metre of tile, ceramic or marble after deductions, and it is not merged with the gypsum or paint metre., then care stays as follows: Repointing a short grout joint and cleaning residue during the defects period, and keeping acids off marble.. Wall plastering as a method, gypsum ceilings, paint systems, and coordinating the room’s trades on one page are refused.
Flexible movement joint
In Tile and marble, “Flexible movement joint” means It is placed at the room edge and on a long run so marble is not thrown by thermal expansion. It applies to A stable floor or wall, clean, and waterproofed in the wet zone before bedding if waterproofing is required under the tile., and it is not accepted if Lippage between two tiles, water ponding away from the drain, an empty grout joint, a marble crack with no movement joint, or salt on porous stone on the coast. appears.
The check uses A notched trowel, spacers or wedges, a straightedge, and a spirit level to check the fall toward the drain., and work stops when Bedding stops if surface heat exceeds the adhesive open time, or if salt wind hits exposed marble before it is protected.. The measure is By the square metre of tile, ceramic or marble after deductions, and it is not merged with the gypsum or paint metre., then care stays as follows: Repointing a short grout joint and cleaning residue during the defects period, and keeping acids off marble.. Wall plastering as a method, gypsum ceilings, paint systems, and coordinating the room’s trades on one page are refused.
Steps for tile and marble
The order of steps in Tile and marble protects the quality of the work. Skipping a step to finish faster shows up at handover.
Check the drain and the level
In Tile and marble, “Check the drain and the level” means The outlet is marked before bedding so water runs to it, not to the door. It applies to A stable floor or wall, clean, and waterproofed in the wet zone before bedding if waterproofing is required under the tile., and it is not accepted if Lippage between two tiles, water ponding away from the drain, an empty grout joint, a marble crack with no movement joint, or salt on porous stone on the coast. appears.
The check uses A notched trowel, spacers or wedges, a straightedge, and a spirit level to check the fall toward the drain., and work stops when Bedding stops if surface heat exceeds the adhesive open time, or if salt wind hits exposed marble before it is protected.. The measure is By the square metre of tile, ceramic or marble after deductions, and it is not merged with the gypsum or paint metre., then care stays as follows: Repointing a short grout joint and cleaning residue during the defects period, and keeping acids off marble.. Wall plastering as a method, gypsum ceilings, paint systems, and coordinating the room’s trades on one page are refused.
Confirm waterproofing under the wet zone
In Tile and marble, “Confirm waterproofing under the wet zone” means If waterproofing is in the agreement it is tested before tile covers it, and this page does not become a ceiling guide. It applies to A stable floor or wall, clean, and waterproofed in the wet zone before bedding if waterproofing is required under the tile., and it is not accepted if Lippage between two tiles, water ponding away from the drain, an empty grout joint, a marble crack with no movement joint, or salt on porous stone on the coast. appears.
The check uses A notched trowel, spacers or wedges, a straightedge, and a spirit level to check the fall toward the drain., and work stops when Bedding stops if surface heat exceeds the adhesive open time, or if salt wind hits exposed marble before it is protected.. The measure is By the square metre of tile, ceramic or marble after deductions, and it is not merged with the gypsum or paint metre., then care stays as follows: Repointing a short grout joint and cleaning residue during the defects period, and keeping acids off marble.. Wall plastering as a method, gypsum ceilings, paint systems, and coordinating the room’s trades on one page are refused.
A square starting line
In Tile and marble, “A square starting line” means The first string stops the joint wandering across the room. It applies to A stable floor or wall, clean, and waterproofed in the wet zone before bedding if waterproofing is required under the tile., and it is not accepted if Lippage between two tiles, water ponding away from the drain, an empty grout joint, a marble crack with no movement joint, or salt on porous stone on the coast. appears.
The check uses A notched trowel, spacers or wedges, a straightedge, and a spirit level to check the fall toward the drain., and work stops when Bedding stops if surface heat exceeds the adhesive open time, or if salt wind hits exposed marble before it is protected.. The measure is By the square metre of tile, ceramic or marble after deductions, and it is not merged with the gypsum or paint metre., then care stays as follows: Repointing a short grout joint and cleaning residue during the defects period, and keeping acids off marble.. Wall plastering as a method, gypsum ceilings, paint systems, and coordinating the room’s trades on one page are refused.
Bedding small areas in heat
In Tile and marble, “Bedding small areas in heat” means Adhesive whose face has skinned is scraped off, and a tile is not set on it. It applies to A stable floor or wall, clean, and waterproofed in the wet zone before bedding if waterproofing is required under the tile., and it is not accepted if Lippage between two tiles, water ponding away from the drain, an empty grout joint, a marble crack with no movement joint, or salt on porous stone on the coast. appears.
The check uses A notched trowel, spacers or wedges, a straightedge, and a spirit level to check the fall toward the drain., and work stops when Bedding stops if surface heat exceeds the adhesive open time, or if salt wind hits exposed marble before it is protected.. The measure is By the square metre of tile, ceramic or marble after deductions, and it is not merged with the gypsum or paint metre., then care stays as follows: Repointing a short grout joint and cleaning residue during the defects period, and keeping acids off marble.. Wall plastering as a method, gypsum ceilings, paint systems, and coordinating the room’s trades on one page are refused.
Set the fall with a straightedge
In Tile and marble, “Set the fall with a straightedge” means In a bathroom, a wet kitchen and an exposed terrace the face falls toward the outlet with no pond. It applies to A stable floor or wall, clean, and waterproofed in the wet zone before bedding if waterproofing is required under the tile., and it is not accepted if Lippage between two tiles, water ponding away from the drain, an empty grout joint, a marble crack with no movement joint, or salt on porous stone on the coast. appears.
The check uses A notched trowel, spacers or wedges, a straightedge, and a spirit level to check the fall toward the drain., and work stops when Bedding stops if surface heat exceeds the adhesive open time, or if salt wind hits exposed marble before it is protected.. The measure is By the square metre of tile, ceramic or marble after deductions, and it is not merged with the gypsum or paint metre., then care stays as follows: Repointing a short grout joint and cleaning residue during the defects period, and keeping acids off marble.. Wall plastering as a method, gypsum ceilings, paint systems, and coordinating the room’s trades on one page are refused.
Set marble into the same level
In Tile and marble, “Set marble into the same level” means Lippage between a marble piece and a tile is corrected while the bed is still soft. It applies to A stable floor or wall, clean, and waterproofed in the wet zone before bedding if waterproofing is required under the tile., and it is not accepted if Lippage between two tiles, water ponding away from the drain, an empty grout joint, a marble crack with no movement joint, or salt on porous stone on the coast. appears.
The check uses A notched trowel, spacers or wedges, a straightedge, and a spirit level to check the fall toward the drain., and work stops when Bedding stops if surface heat exceeds the adhesive open time, or if salt wind hits exposed marble before it is protected.. The measure is By the square metre of tile, ceramic or marble after deductions, and it is not merged with the gypsum or paint metre., then care stays as follows: Repointing a short grout joint and cleaning residue during the defects period, and keeping acids off marble.. Wall plastering as a method, gypsum ceilings, paint systems, and coordinating the room’s trades on one page are refused.
Grout after the bed is firm
In Tile and marble, “Grout after the bed is firm” means The joint is filled and the marble face is wiped at once so residue does not etch the surface. It applies to A stable floor or wall, clean, and waterproofed in the wet zone before bedding if waterproofing is required under the tile., and it is not accepted if Lippage between two tiles, water ponding away from the drain, an empty grout joint, a marble crack with no movement joint, or salt on porous stone on the coast. appears.
The check uses A notched trowel, spacers or wedges, a straightedge, and a spirit level to check the fall toward the drain., and work stops when Bedding stops if surface heat exceeds the adhesive open time, or if salt wind hits exposed marble before it is protected.. The measure is By the square metre of tile, ceramic or marble after deductions, and it is not merged with the gypsum or paint metre., then care stays as follows: Repointing a short grout joint and cleaning residue during the defects period, and keeping acids off marble.. Wall plastering as a method, gypsum ceilings, paint systems, and coordinating the room’s trades on one page are refused.
Run the water test
In Tile and marble, “Run the water test” means In the wet zone water is poured and its path to the drain is watched before handover. It applies to A stable floor or wall, clean, and waterproofed in the wet zone before bedding if waterproofing is required under the tile., and it is not accepted if Lippage between two tiles, water ponding away from the drain, an empty grout joint, a marble crack with no movement joint, or salt on porous stone on the coast. appears.
The check uses A notched trowel, spacers or wedges, a straightedge, and a spirit level to check the fall toward the drain., and work stops when Bedding stops if surface heat exceeds the adhesive open time, or if salt wind hits exposed marble before it is protected.. The measure is By the square metre of tile, ceramic or marble after deductions, and it is not merged with the gypsum or paint metre., then care stays as follows: Repointing a short grout joint and cleaning residue during the defects period, and keeping acids off marble.. Wall plastering as a method, gypsum ceilings, paint systems, and coordinating the room’s trades on one page are refused.
Common mistakes in tile and marble
A floor with no fall to the drain
In Tile and marble, “A floor with no fall to the drain” means Water stands at the door and wets the neighbouring room. It applies to A stable floor or wall, clean, and waterproofed in the wet zone before bedding if waterproofing is required under the tile., and it is not accepted if Lippage between two tiles, water ponding away from the drain, an empty grout joint, a marble crack with no movement joint, or salt on porous stone on the coast. appears.
The check uses A notched trowel, spacers or wedges, a straightedge, and a spirit level to check the fall toward the drain., and work stops when Bedding stops if surface heat exceeds the adhesive open time, or if salt wind hits exposed marble before it is protected.. The measure is By the square metre of tile, ceramic or marble after deductions, and it is not merged with the gypsum or paint metre., then care stays as follows: Repointing a short grout joint and cleaning residue during the defects period, and keeping acids off marble.. Wall plastering as a method, gypsum ceilings, paint systems, and coordinating the room’s trades on one page are refused.
Tile on skinned adhesive
In Tile and marble, “Tile on skinned adhesive” means The bond fails and a hollow sound appears after a few days. It applies to A stable floor or wall, clean, and waterproofed in the wet zone before bedding if waterproofing is required under the tile., and it is not accepted if Lippage between two tiles, water ponding away from the drain, an empty grout joint, a marble crack with no movement joint, or salt on porous stone on the coast. appears.
The check uses A notched trowel, spacers or wedges, a straightedge, and a spirit level to check the fall toward the drain., and work stops when Bedding stops if surface heat exceeds the adhesive open time, or if salt wind hits exposed marble before it is protected.. The measure is By the square metre of tile, ceramic or marble after deductions, and it is not merged with the gypsum or paint metre., then care stays as follows: Repointing a short grout joint and cleaning residue during the defects period, and keeping acids off marble.. Wall plastering as a method, gypsum ceilings, paint systems, and coordinating the room’s trades on one page are refused.
Grout inside the movement joint
In Tile and marble, “Grout inside the movement joint” means Expansion in heat breaks the marble edge. It applies to A stable floor or wall, clean, and waterproofed in the wet zone before bedding if waterproofing is required under the tile., and it is not accepted if Lippage between two tiles, water ponding away from the drain, an empty grout joint, a marble crack with no movement joint, or salt on porous stone on the coast. appears.
The check uses A notched trowel, spacers or wedges, a straightedge, and a spirit level to check the fall toward the drain., and work stops when Bedding stops if surface heat exceeds the adhesive open time, or if salt wind hits exposed marble before it is protected.. The measure is By the square metre of tile, ceramic or marble after deductions, and it is not merged with the gypsum or paint metre., then care stays as follows: Repointing a short grout joint and cleaning residue during the defects period, and keeping acids off marble.. Wall plastering as a method, gypsum ceilings, paint systems, and coordinating the room’s trades on one page are refused.
Mixing different samples in one room
In Tile and marble, “Mixing different samples in one room” means Different absorption blotches the face after washing. It applies to A stable floor or wall, clean, and waterproofed in the wet zone before bedding if waterproofing is required under the tile., and it is not accepted if Lippage between two tiles, water ponding away from the drain, an empty grout joint, a marble crack with no movement joint, or salt on porous stone on the coast. appears.
The check uses A notched trowel, spacers or wedges, a straightedge, and a spirit level to check the fall toward the drain., and work stops when Bedding stops if surface heat exceeds the adhesive open time, or if salt wind hits exposed marble before it is protected.. The measure is By the square metre of tile, ceramic or marble after deductions, and it is not merged with the gypsum or paint metre., then care stays as follows: Repointing a short grout joint and cleaning residue during the defects period, and keeping acids off marble.. Wall plastering as a method, gypsum ceilings, paint systems, and coordinating the room’s trades on one page are refused.
Washing marble with sea water
In Tile and marble, “Washing marble with sea water” means Salt stays in the pores and shows a halo on the coast. It applies to A stable floor or wall, clean, and waterproofed in the wet zone before bedding if waterproofing is required under the tile., and it is not accepted if Lippage between two tiles, water ponding away from the drain, an empty grout joint, a marble crack with no movement joint, or salt on porous stone on the coast. appears.
The check uses A notched trowel, spacers or wedges, a straightedge, and a spirit level to check the fall toward the drain., and work stops when Bedding stops if surface heat exceeds the adhesive open time, or if salt wind hits exposed marble before it is protected.. The measure is By the square metre of tile, ceramic or marble after deductions, and it is not merged with the gypsum or paint metre., then care stays as follows: Repointing a short grout joint and cleaning residue during the defects period, and keeping acids off marble.. Wall plastering as a method, gypsum ceilings, paint systems, and coordinating the room’s trades on one page are refused.
Explaining a gypsum ceiling inside the tile trade
In Tile and marble, “Explaining a gypsum ceiling inside the tile trade” means The measure is mixed and the limit of the interior-finishing page is lost. It applies to A stable floor or wall, clean, and waterproofed in the wet zone before bedding if waterproofing is required under the tile., and it is not accepted if Lippage between two tiles, water ponding away from the drain, an empty grout joint, a marble crack with no movement joint, or salt on porous stone on the coast. appears.
The check uses A notched trowel, spacers or wedges, a straightedge, and a spirit level to check the fall toward the drain., and work stops when Bedding stops if surface heat exceeds the adhesive open time, or if salt wind hits exposed marble before it is protected.. The measure is By the square metre of tile, ceramic or marble after deductions, and it is not merged with the gypsum or paint metre., then care stays as follows: Repointing a short grout joint and cleaning residue during the defects period, and keeping acids off marble.. Wall plastering as a method, gypsum ceilings, paint systems, and coordinating the room’s trades on one page are refused.
What affects the price of tile and marble
The price of Tile and marble is set after the survey, because it changes with the city, access, the surface and the season. The factors below show what raises or lowers the cost.
Waste from cutting
In Tile and marble, “Waste from cutting” means Cuts around a drain and a column raise the quantity above the room’s net area. It applies to A stable floor or wall, clean, and waterproofed in the wet zone before bedding if waterproofing is required under the tile., and it is not accepted if Lippage between two tiles, water ponding away from the drain, an empty grout joint, a marble crack with no movement joint, or salt on porous stone on the coast. appears.
The check uses A notched trowel, spacers or wedges, a straightedge, and a spirit level to check the fall toward the drain., and work stops when Bedding stops if surface heat exceeds the adhesive open time, or if salt wind hits exposed marble before it is protected.. The measure is By the square metre of tile, ceramic or marble after deductions, and it is not merged with the gypsum or paint metre., then care stays as follows: Repointing a short grout joint and cleaning residue during the defects period, and keeping acids off marble.. Wall plastering as a method, gypsum ceilings, paint systems, and coordinating the room’s trades on one page are refused.
A wet zone that needs a fall
In Tile and marble, “A wet zone that needs a fall” means Setting a fall toward a drain is slower than bedding a dry room that stays level. It applies to A stable floor or wall, clean, and waterproofed in the wet zone before bedding if waterproofing is required under the tile., and it is not accepted if Lippage between two tiles, water ponding away from the drain, an empty grout joint, a marble crack with no movement joint, or salt on porous stone on the coast. appears.
The check uses A notched trowel, spacers or wedges, a straightedge, and a spirit level to check the fall toward the drain., and work stops when Bedding stops if surface heat exceeds the adhesive open time, or if salt wind hits exposed marble before it is protected.. The measure is By the square metre of tile, ceramic or marble after deductions, and it is not merged with the gypsum or paint metre., then care stays as follows: Repointing a short grout joint and cleaning residue during the defects period, and keeping acids off marble.. Wall plastering as a method, gypsum ceilings, paint systems, and coordinating the room’s trades on one page are refused.
Marble that is not one thickness
In Tile and marble, “Marble that is not one thickness” means Adjusting the bed piece by piece adds time. It applies to A stable floor or wall, clean, and waterproofed in the wet zone before bedding if waterproofing is required under the tile., and it is not accepted if Lippage between two tiles, water ponding away from the drain, an empty grout joint, a marble crack with no movement joint, or salt on porous stone on the coast. appears.
The check uses A notched trowel, spacers or wedges, a straightedge, and a spirit level to check the fall toward the drain., and work stops when Bedding stops if surface heat exceeds the adhesive open time, or if salt wind hits exposed marble before it is protected.. The measure is By the square metre of tile, ceramic or marble after deductions, and it is not merged with the gypsum or paint metre., then care stays as follows: Repointing a short grout joint and cleaning residue during the defects period, and keeping acids off marble.. Wall plastering as a method, gypsum ceilings, paint systems, and coordinating the room’s trades on one page are refused.
Heat and adhesive time
In Tile and marble, “Heat and adhesive time” means Morning or evening work in summer protects the bond and lengthens presence on site. It applies to A stable floor or wall, clean, and waterproofed in the wet zone before bedding if waterproofing is required under the tile., and it is not accepted if Lippage between two tiles, water ponding away from the drain, an empty grout joint, a marble crack with no movement joint, or salt on porous stone on the coast. appears.
The check uses A notched trowel, spacers or wedges, a straightedge, and a spirit level to check the fall toward the drain., and work stops when Bedding stops if surface heat exceeds the adhesive open time, or if salt wind hits exposed marble before it is protected.. The measure is By the square metre of tile, ceramic or marble after deductions, and it is not merged with the gypsum or paint metre., then care stays as follows: Repointing a short grout joint and cleaning residue during the defects period, and keeping acids off marble.. Wall plastering as a method, gypsum ceilings, paint systems, and coordinating the room’s trades on one page are refused.
Protecting stone on the coast
In Tile and marble, “Protecting stone on the coast” means Covering porous marble from spray is an extra step before handover. It applies to A stable floor or wall, clean, and waterproofed in the wet zone before bedding if waterproofing is required under the tile., and it is not accepted if Lippage between two tiles, water ponding away from the drain, an empty grout joint, a marble crack with no movement joint, or salt on porous stone on the coast. appears.
The check uses A notched trowel, spacers or wedges, a straightedge, and a spirit level to check the fall toward the drain., and work stops when Bedding stops if surface heat exceeds the adhesive open time, or if salt wind hits exposed marble before it is protected.. The measure is By the square metre of tile, ceramic or marble after deductions, and it is not merged with the gypsum or paint metre., then care stays as follows: Repointing a short grout joint and cleaning residue during the defects period, and keeping acids off marble.. Wall plastering as a method, gypsum ceilings, paint systems, and coordinating the room’s trades on one page are refused.
Separating paint and gypsum measures
In Tile and marble, “Separating paint and gypsum measures” means Keeping those trades out of the metre prevents a merged offer without limits. It applies to A stable floor or wall, clean, and waterproofed in the wet zone before bedding if waterproofing is required under the tile., and it is not accepted if Lippage between two tiles, water ponding away from the drain, an empty grout joint, a marble crack with no movement joint, or salt on porous stone on the coast. appears.
The check uses A notched trowel, spacers or wedges, a straightedge, and a spirit level to check the fall toward the drain., and work stops when Bedding stops if surface heat exceeds the adhesive open time, or if salt wind hits exposed marble before it is protected.. The measure is By the square metre of tile, ceramic or marble after deductions, and it is not merged with the gypsum or paint metre., then care stays as follows: Repointing a short grout joint and cleaning residue during the defects period, and keeping acids off marble.. Wall plastering as a method, gypsum ceilings, paint systems, and coordinating the room’s trades on one page are refused.
Handover of tile and marble
Water reaches the drain
In Tile and marble, “Water reaches the drain” means No pond remains after the pour test in the bathroom or on the terrace. It applies to A stable floor or wall, clean, and waterproofed in the wet zone before bedding if waterproofing is required under the tile., and it is not accepted if Lippage between two tiles, water ponding away from the drain, an empty grout joint, a marble crack with no movement joint, or salt on porous stone on the coast. appears.
The check uses A notched trowel, spacers or wedges, a straightedge, and a spirit level to check the fall toward the drain., and work stops when Bedding stops if surface heat exceeds the adhesive open time, or if salt wind hits exposed marble before it is protected.. The measure is By the square metre of tile, ceramic or marble after deductions, and it is not merged with the gypsum or paint metre., then care stays as follows: Repointing a short grout joint and cleaning residue during the defects period, and keeping acids off marble.. Wall plastering as a method, gypsum ceilings, paint systems, and coordinating the room’s trades on one page are refused.
Lippage is felt by foot and straightedge
In Tile and marble, “Lippage is felt by foot and straightedge” means A proud edge is rejected and reset while the bed can still be corrected. It applies to A stable floor or wall, clean, and waterproofed in the wet zone before bedding if waterproofing is required under the tile., and it is not accepted if Lippage between two tiles, water ponding away from the drain, an empty grout joint, a marble crack with no movement joint, or salt on porous stone on the coast. appears.
The check uses A notched trowel, spacers or wedges, a straightedge, and a spirit level to check the fall toward the drain., and work stops when Bedding stops if surface heat exceeds the adhesive open time, or if salt wind hits exposed marble before it is protected.. The measure is By the square metre of tile, ceramic or marble after deductions, and it is not merged with the gypsum or paint metre., then care stays as follows: Repointing a short grout joint and cleaning residue during the defects period, and keeping acids off marble.. Wall plastering as a method, gypsum ceilings, paint systems, and coordinating the room’s trades on one page are refused.
Grout is full
In Tile and marble, “Grout is full” means A sunken joint is refilled before it collects dirt. It applies to A stable floor or wall, clean, and waterproofed in the wet zone before bedding if waterproofing is required under the tile., and it is not accepted if Lippage between two tiles, water ponding away from the drain, an empty grout joint, a marble crack with no movement joint, or salt on porous stone on the coast. appears.
The check uses A notched trowel, spacers or wedges, a straightedge, and a spirit level to check the fall toward the drain., and work stops when Bedding stops if surface heat exceeds the adhesive open time, or if salt wind hits exposed marble before it is protected.. The measure is By the square metre of tile, ceramic or marble after deductions, and it is not merged with the gypsum or paint metre., then care stays as follows: Repointing a short grout joint and cleaning residue during the defects period, and keeping acids off marble.. Wall plastering as a method, gypsum ceilings, paint systems, and coordinating the room’s trades on one page are refused.
The movement joint is free of hard grout
In Tile and marble, “The movement joint is free of hard grout” means Only the flexible seal sits on that line. It applies to A stable floor or wall, clean, and waterproofed in the wet zone before bedding if waterproofing is required under the tile., and it is not accepted if Lippage between two tiles, water ponding away from the drain, an empty grout joint, a marble crack with no movement joint, or salt on porous stone on the coast. appears.
The check uses A notched trowel, spacers or wedges, a straightedge, and a spirit level to check the fall toward the drain., and work stops when Bedding stops if surface heat exceeds the adhesive open time, or if salt wind hits exposed marble before it is protected.. The measure is By the square metre of tile, ceramic or marble after deductions, and it is not merged with the gypsum or paint metre., then care stays as follows: Repointing a short grout joint and cleaning residue during the defects period, and keeping acids off marble.. Wall plastering as a method, gypsum ceilings, paint systems, and coordinating the room’s trades on one page are refused.
Marble shows neither acid mark nor salt
In Tile and marble, “Marble shows neither acid mark nor salt” means The stone face is reviewed in side light. It applies to A stable floor or wall, clean, and waterproofed in the wet zone before bedding if waterproofing is required under the tile., and it is not accepted if Lippage between two tiles, water ponding away from the drain, an empty grout joint, a marble crack with no movement joint, or salt on porous stone on the coast. appears.
The check uses A notched trowel, spacers or wedges, a straightedge, and a spirit level to check the fall toward the drain., and work stops when Bedding stops if surface heat exceeds the adhesive open time, or if salt wind hits exposed marble before it is protected.. The measure is By the square metre of tile, ceramic or marble after deductions, and it is not merged with the gypsum or paint metre., then care stays as follows: Repointing a short grout joint and cleaning residue during the defects period, and keeping acids off marble.. Wall plastering as a method, gypsum ceilings, paint systems, and coordinating the room’s trades on one page are refused.
The minute has no gypsum ceiling
In Tile and marble, “The minute has no gypsum ceiling” means The limit of this page is a clad floor and wall. The rest of the room has its own pages. It applies to A stable floor or wall, clean, and waterproofed in the wet zone before bedding if waterproofing is required under the tile., and it is not accepted if Lippage between two tiles, water ponding away from the drain, an empty grout joint, a marble crack with no movement joint, or salt on porous stone on the coast. appears.
The check uses A notched trowel, spacers or wedges, a straightedge, and a spirit level to check the fall toward the drain., and work stops when Bedding stops if surface heat exceeds the adhesive open time, or if salt wind hits exposed marble before it is protected.. The measure is By the square metre of tile, ceramic or marble after deductions, and it is not merged with the gypsum or paint metre., then care stays as follows: Repointing a short grout joint and cleaning residue during the defects period, and keeping acids off marble.. Wall plastering as a method, gypsum ceilings, paint systems, and coordinating the room’s trades on one page are refused.
Our work
Photos of the kind of work. The details of this service are above and below.
After tile and marble is handed over
Repointing a short grout joint and cleaning residue during the defects period, and keeping acids off marble. This detail belongs only to Tile and marble and is not pasted onto another trade. The surface in question is A stable floor or wall, clean, and waterproofed in the wet zone before bedding if waterproofing is required under the tile., and the exclusion is explicit: Wall plastering as a method, gypsum ceilings, paint systems, and coordinating the room’s trades on one page are refused..
After handover marble is washed with fresh water without salt, and movement joints are left free of hard grout so they can work. This detail belongs only to Tile and marble and is not pasted onto another trade. The surface in question is A stable floor or wall, clean, and waterproofed in the wet zone before bedding if waterproofing is required under the tile., and the exclusion is explicit: Wall plastering as a method, gypsum ceilings, paint systems, and coordinating the room’s trades on one page are refused..
In summer adhesive is spread in small areas so its face does not skin before the tile is set. On the coast porous marble is covered so it does not drink salt spray. This detail belongs only to Tile and marble and is not pasted onto another trade. The surface in question is A stable floor or wall, clean, and waterproofed in the wet zone before bedding if waterproofing is required under the tile., and the exclusion is explicit: Wall plastering as a method, gypsum ceilings, paint systems, and coordinating the room’s trades on one page are refused..
If Lippage between two tiles, water ponding away from the drain, an empty grout joint, a marble crack with no movement joint, or salt on porous stone on the coast. appears, this trade is reopened on the same surface. Work stops when Bedding stops if surface heat exceeds the adhesive open time, or if salt wind hits exposed marble before it is protected.. Inspection uses A notched trowel, spacers or wedges, a straightedge, and a spirit level to check the fall toward the drain., and the agreed measure is By the square metre of tile, ceramic or marble after deductions, and it is not merged with the gypsum or paint metre.. After handover, care stays within Repointing a short grout joint and cleaning residue during the defects period, and keeping acids off marble..
Tile and marble across Saudi regions
How Tile and marble is carried out changes from one region to another with the climate and the access. Districts and the road from Jeddah are on the city page. The link in each region opens it.
Tile and marble in the Riyadh Region
The effect of the Riyadh Region on Tile and marble comes from this constraint: high daytime heat, dust, and a wide gap between afternoon and night temperatures. On A stable floor or wall, clean, and waterproofed in the wet zone before bedding if waterproofing is required under the tile. that means delaying work if the constraint meets this limit: Bedding stops if surface heat exceeds the adhesive open time, or if salt wind hits exposed marble before it is protected.. The defect looked for here is Lippage between two tiles, water ponding away from the drain, an empty grout joint, a marble crack with no movement joint, or salt on porous stone on the coast., and the measure is By the square metre of tile, ceramic or marble after deductions, and it is not merged with the gypsum or paint metre.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Riyadh Region page and on its capital page.
Tile and marble in the Makkah Region
The effect of the Makkah Region on Tile and marble comes from this constraint: a hot humid coast in Jeddah and Rabigh, and rock and slopes in Makkah and Taif. On A stable floor or wall, clean, and waterproofed in the wet zone before bedding if waterproofing is required under the tile. that means delaying work if the constraint meets this limit: Bedding stops if surface heat exceeds the adhesive open time, or if salt wind hits exposed marble before it is protected.. The defect looked for here is Lippage between two tiles, water ponding away from the drain, an empty grout joint, a marble crack with no movement joint, or salt on porous stone on the coast., and the measure is By the square metre of tile, ceramic or marble after deductions, and it is not merged with the gypsum or paint metre.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Makkah Region page and on its capital page.
Tile and marble in the Madinah Region
The effect of the Madinah Region on Tile and marble comes from this constraint: dry heat, volcanic harra around places such as Khaybar, and an industrial coast at Yanbu. On A stable floor or wall, clean, and waterproofed in the wet zone before bedding if waterproofing is required under the tile. that means delaying work if the constraint meets this limit: Bedding stops if surface heat exceeds the adhesive open time, or if salt wind hits exposed marble before it is protected.. The defect looked for here is Lippage between two tiles, water ponding away from the drain, an empty grout joint, a marble crack with no movement joint, or salt on porous stone on the coast., and the measure is By the square metre of tile, ceramic or marble after deductions, and it is not merged with the gypsum or paint metre.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Madinah Region page and on its capital page.
Tile and marble in the Qassim Region
The effect of the Qassim Region on Tile and marble comes from this constraint: a dry Najd climate, dust, and agricultural and trading activity around Buraidah and Unaizah. On A stable floor or wall, clean, and waterproofed in the wet zone before bedding if waterproofing is required under the tile. that means delaying work if the constraint meets this limit: Bedding stops if surface heat exceeds the adhesive open time, or if salt wind hits exposed marble before it is protected.. The defect looked for here is Lippage between two tiles, water ponding away from the drain, an empty grout joint, a marble crack with no movement joint, or salt on porous stone on the coast., and the measure is By the square metre of tile, ceramic or marble after deductions, and it is not merged with the gypsum or paint metre.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Qassim Region page and on its capital page.
Tile and marble in the Eastern Province
The effect of the Eastern Province on Tile and marble comes from this constraint: Gulf humidity, sabkha and groundwater on the coast, and high heat inland at Hafar Al Batin. On A stable floor or wall, clean, and waterproofed in the wet zone before bedding if waterproofing is required under the tile. that means delaying work if the constraint meets this limit: Bedding stops if surface heat exceeds the adhesive open time, or if salt wind hits exposed marble before it is protected.. The defect looked for here is Lippage between two tiles, water ponding away from the drain, an empty grout joint, a marble crack with no movement joint, or salt on porous stone on the coast., and the measure is By the square metre of tile, ceramic or marble after deductions, and it is not merged with the gypsum or paint metre.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Eastern Province page and on its capital page.
Tile and marble in the Asir Region
The effect of the Asir Region on Tile and marble comes from this constraint: rainy foggy highlands around Abha, and stronger heat in Bisha and Tathlith. On A stable floor or wall, clean, and waterproofed in the wet zone before bedding if waterproofing is required under the tile. that means delaying work if the constraint meets this limit: Bedding stops if surface heat exceeds the adhesive open time, or if salt wind hits exposed marble before it is protected.. The defect looked for here is Lippage between two tiles, water ponding away from the drain, an empty grout joint, a marble crack with no movement joint, or salt on porous stone on the coast., and the measure is By the square metre of tile, ceramic or marble after deductions, and it is not merged with the gypsum or paint metre.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Asir Region page and on its capital page.
Tile and marble in the Tabuk Region
The effect of the Tabuk Region on Tile and marble comes from this constraint: hot summers, cold nights in winter, wind, and a Red Sea coast at Al Wajh, Duba and Umluj. On A stable floor or wall, clean, and waterproofed in the wet zone before bedding if waterproofing is required under the tile. that means delaying work if the constraint meets this limit: Bedding stops if surface heat exceeds the adhesive open time, or if salt wind hits exposed marble before it is protected.. The defect looked for here is Lippage between two tiles, water ponding away from the drain, an empty grout joint, a marble crack with no movement joint, or salt on porous stone on the coast., and the measure is By the square metre of tile, ceramic or marble after deductions, and it is not merged with the gypsum or paint metre.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Tabuk Region page and on its capital page.
Tile and marble in the Hail Region
The effect of the Hail Region on Tile and marble comes from this constraint: a dry northern climate, cold nights, and dust on open roads. On A stable floor or wall, clean, and waterproofed in the wet zone before bedding if waterproofing is required under the tile. that means delaying work if the constraint meets this limit: Bedding stops if surface heat exceeds the adhesive open time, or if salt wind hits exposed marble before it is protected.. The defect looked for here is Lippage between two tiles, water ponding away from the drain, an empty grout joint, a marble crack with no movement joint, or salt on porous stone on the coast., and the measure is By the square metre of tile, ceramic or marble after deductions, and it is not merged with the gypsum or paint metre.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Hail Region page and on its capital page.
Tile and marble in the Northern Borders Region
The effect of the Northern Borders Region on Tile and marble comes from this constraint: geographic distance, a cold winter, and wind in small border cities. On A stable floor or wall, clean, and waterproofed in the wet zone before bedding if waterproofing is required under the tile. that means delaying work if the constraint meets this limit: Bedding stops if surface heat exceeds the adhesive open time, or if salt wind hits exposed marble before it is protected.. The defect looked for here is Lippage between two tiles, water ponding away from the drain, an empty grout joint, a marble crack with no movement joint, or salt on porous stone on the coast., and the measure is By the square metre of tile, ceramic or marble after deductions, and it is not merged with the gypsum or paint metre.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Northern Borders Region page and on its capital page.
Tile and marble in the Jazan Region
The effect of the Jazan Region on Tile and marble comes from this constraint: humid Tihama heat, seasonal rain and wadis, and the island constraint of Farasan. On A stable floor or wall, clean, and waterproofed in the wet zone before bedding if waterproofing is required under the tile. that means delaying work if the constraint meets this limit: Bedding stops if surface heat exceeds the adhesive open time, or if salt wind hits exposed marble before it is protected.. The defect looked for here is Lippage between two tiles, water ponding away from the drain, an empty grout joint, a marble crack with no movement joint, or salt on porous stone on the coast., and the measure is By the square metre of tile, ceramic or marble after deductions, and it is not merged with the gypsum or paint metre.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Jazan Region page and on its capital page.
Tile and marble in the Najran Region
The effect of the Najran Region on Tile and marble comes from this constraint: a valley between highlands, heat, and a distance from Jeddah that shows up in supply. On A stable floor or wall, clean, and waterproofed in the wet zone before bedding if waterproofing is required under the tile. that means delaying work if the constraint meets this limit: Bedding stops if surface heat exceeds the adhesive open time, or if salt wind hits exposed marble before it is protected.. The defect looked for here is Lippage between two tiles, water ponding away from the drain, an empty grout joint, a marble crack with no movement joint, or salt on porous stone on the coast., and the measure is By the square metre of tile, ceramic or marble after deductions, and it is not merged with the gypsum or paint metre.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Najran Region page and on its capital page.
Tile and marble in the Al Bahah Region
The effect of the Al Bahah Region on Tile and marble comes from this constraint: highlands, fog, rain, and short mountain roads between towns. On A stable floor or wall, clean, and waterproofed in the wet zone before bedding if waterproofing is required under the tile. that means delaying work if the constraint meets this limit: Bedding stops if surface heat exceeds the adhesive open time, or if salt wind hits exposed marble before it is protected.. The defect looked for here is Lippage between two tiles, water ponding away from the drain, an empty grout joint, a marble crack with no movement joint, or salt on porous stone on the coast., and the measure is By the square metre of tile, ceramic or marble after deductions, and it is not merged with the gypsum or paint metre.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Al Bahah Region page and on its capital page.
Tile and marble in the Al Jawf Region
The effect of the Al Jawf Region on Tile and marble comes from this constraint: an agricultural north, cold winters, and a long distance from Jeddah. On A stable floor or wall, clean, and waterproofed in the wet zone before bedding if waterproofing is required under the tile. that means delaying work if the constraint meets this limit: Bedding stops if surface heat exceeds the adhesive open time, or if salt wind hits exposed marble before it is protected.. The defect looked for here is Lippage between two tiles, water ponding away from the drain, an empty grout joint, a marble crack with no movement joint, or salt on porous stone on the coast., and the measure is By the square metre of tile, ceramic or marble after deductions, and it is not merged with the gypsum or paint metre.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Al Jawf Region page and on its capital page.
A site example of tile and marble
A bathroom: waterproofing if agreed, then a floor fall toward the drain, then wall ceramic and floor tile with a movement joint at the edge. A gypsum ceiling is not in the example. This detail belongs only to Tile and marble and is not pasted onto another trade. The surface in question is A stable floor or wall, clean, and waterproofed in the wet zone before bedding if waterproofing is required under the tile., and the exclusion is explicit: Wall plastering as a method, gypsum ceilings, paint systems, and coordinating the room’s trades on one page are refused..
A finished project and a riyal figure are not cited for this example. This detail belongs only to Tile and marble and is not pasted onto another trade. The surface in question is A stable floor or wall, clean, and waterproofed in the wet zone before bedding if waterproofing is required under the tile., and the exclusion is explicit: Wall plastering as a method, gypsum ceilings, paint systems, and coordinating the room’s trades on one page are refused..
If Lippage between two tiles, water ponding away from the drain, an empty grout joint, a marble crack with no movement joint, or salt on porous stone on the coast. appears, this trade is reopened on the same surface. Work stops when Bedding stops if surface heat exceeds the adhesive open time, or if salt wind hits exposed marble before it is protected.. Inspection uses A notched trowel, spacers or wedges, a straightedge, and a spirit level to check the fall toward the drain., and the agreed measure is By the square metre of tile, ceramic or marble after deductions, and it is not merged with the gypsum or paint metre.. After handover, care stays within Repointing a short grout joint and cleaning residue during the defects period, and keeping acids off marble..
The example shows how to think before a survey. It is not a contract and not an approved quantity. Any area the client states is checked on site because By the square metre of tile, ceramic or marble after deductions, and it is not merged with the gypsum or paint metre. may change after openings, slopes, or zones this trade does not cover are deducted.
What tile and marble does not include
The work closest to Tile and marble is Interior finishing. Interior finishing distributes the room’s trades and keeps each measure on its own page, while this page lays tile, ceramic and marble and refuses to explain the gypsum frame, the plastering method and the paint system. This page explains Tile and marble only.
If the project needs both, each one is listed in the quotation with its own quantity. Start at Interior finishing if that is the request, or continue here if the request is Tile and marble.
The surface is handed over with a water test in the wet zone, a lippage reading, and a statement that the wider interior finish is outside the scope. This detail belongs only to Tile and marble and is not pasted onto another trade. The surface in question is A stable floor or wall, clean, and waterproofed in the wet zone before bedding if waterproofing is required under the tile., and the exclusion is explicit: Wall plastering as a method, gypsum ceilings, paint systems, and coordinating the room’s trades on one page are refused..
If Lippage between two tiles, water ponding away from the drain, an empty grout joint, a marble crack with no movement joint, or salt on porous stone on the coast. appears, this trade is reopened on the same surface. Work stops when Bedding stops if surface heat exceeds the adhesive open time, or if salt wind hits exposed marble before it is protected.. Inspection uses A notched trowel, spacers or wedges, a straightedge, and a spirit level to check the fall toward the drain., and the agreed measure is By the square metre of tile, ceramic or marble after deductions, and it is not merged with the gypsum or paint metre.. After handover, care stays within Repointing a short grout joint and cleaning residue during the defects period, and keeping acids off marble..