Scope of concrete structure

Concrete structure here is foundations, columns and slabs only. A block wall is the masonry page, and plaster is not this trade. This detail belongs only to Concrete structure and is not pasted onto another trade. The surface in question is The founding soil and then column and slab formwork, not a block course and not a plaster coat., and the exclusion is explicit: The page refuses to teach block and brick wall building, and it refuses to teach plaster or any finish on the concrete..

Concrete grade and reinforcement are taken from the element drawing. Soil strength is not invented if the borehole is missing. This detail belongs only to Concrete structure and is not pasted onto another trade. The surface in question is The founding soil and then column and slab formwork, not a block course and not a plaster coat., and the exclusion is explicit: The page refuses to teach block and brick wall building, and it refuses to teach plaster or any finish on the concrete..

If Steel with no cover showing on the pour face, honeycombing in a column, a cold joint in a slab, or a roof left uncured that dried in the wind. appears, this trade is reopened on the same surface. Work stops when The pour stops if wind-dry weather or rain on fresh concrete removes the chance of water curing, and concrete is not poured onto a joint fouled with dust.. Inspection uses Cover spacers, a poker vibrator, a column plumb line, and a wetting cover for the slab., and the agreed measure is By concrete foundations, columns and slabs from the drawing, not by the metre of block wall and not by the metre of plaster.. After handover, care stays within A defects watch on visible honeycombing and shrinkage cracks in the concrete, not repairs to wall render..

The page refuses to teach block and brick wall building, and it refuses to teach plaster or any finish on the concrete. If the project needs Masonry, the details are on the Masonry page. Masonry explains block and brick walls between the elements, while this page explains concrete foundations, columns and slabs and refuses to teach wall building.

We carry out Concrete structure in cities across Saudi Arabia. Season and access change from one city to another. Open your city from the region pages for the visit date, and stay here for how Concrete structure itself is done.

When we carry out concrete structure

An owner or supervisor who wants the concrete frame only, foundations, columns and slabs, and leaves the walls to the masonry trade. This detail belongs only to Concrete structure and is not pasted onto another trade. The surface in question is The founding soil and then column and slab formwork, not a block course and not a plaster coat., and the exclusion is explicit: The page refuses to teach block and brick wall building, and it refuses to teach plaster or any finish on the concrete..

It is requested when the load-bearing frame, a concrete slab or bases are built, before a wall course starts. This detail belongs only to Concrete structure and is not pasted onto another trade. The surface in question is The founding soil and then column and slab formwork, not a block course and not a plaster coat., and the exclusion is explicit: The page refuses to teach block and brick wall building, and it refuses to teach plaster or any finish on the concrete..

If the work is block walls between columns already standing, the page is masonry, not the frame. This detail belongs only to Concrete structure and is not pasted onto another trade. The surface in question is The founding soil and then column and slab formwork, not a block course and not a plaster coat., and the exclusion is explicit: The page refuses to teach block and brick wall building, and it refuses to teach plaster or any finish on the concrete..

If Steel with no cover showing on the pour face, honeycombing in a column, a cold joint in a slab, or a roof left uncured that dried in the wind. appears, this trade is reopened on the same surface. Work stops when The pour stops if wind-dry weather or rain on fresh concrete removes the chance of water curing, and concrete is not poured onto a joint fouled with dust.. Inspection uses Cover spacers, a poker vibrator, a column plumb line, and a wetting cover for the slab., and the agreed measure is By concrete foundations, columns and slabs from the drawing, not by the metre of block wall and not by the metre of plaster.. After handover, care stays within A defects watch on visible honeycombing and shrinkage cracks in the concrete, not repairs to wall render..

A request for Concrete structure starts when the client names the city, the building and the limit of work. The office is in Jeddah, and visits in other cities are arranged by distance. This page explains the work itself.

Materials for concrete structure

The materials of Concrete structure are listed below. Each one has an acceptance rule. If the rule is missed, the batch is rejected before the work continues.

Cover spacers

In Concrete structure, “Cover spacers” means They are fixed to the steel before the form is closed so the bar distance to the concrete face stays as drawn. It applies to The founding soil and then column and slab formwork, not a block course and not a plaster coat., and it is not accepted if Steel with no cover showing on the pour face, honeycombing in a column, a cold joint in a slab, or a roof left uncured that dried in the wind. appears.

The check uses Cover spacers, a poker vibrator, a column plumb line, and a wetting cover for the slab., and work stops when The pour stops if wind-dry weather or rain on fresh concrete removes the chance of water curing, and concrete is not poured onto a joint fouled with dust.. The measure is By concrete foundations, columns and slabs from the drawing, not by the metre of block wall and not by the metre of plaster., then care stays as follows: A defects watch on visible honeycombing and shrinkage cracks in the concrete, not repairs to wall render.. The page refuses to teach block and brick wall building, and it refuses to teach plaster or any finish on the concrete.

A poker vibrator

In Concrete structure, “A poker vibrator” means It is lowered into the column and slab to drive out air. It is not used to drag concrete sideways over a long distance. It applies to The founding soil and then column and slab formwork, not a block course and not a plaster coat., and it is not accepted if Steel with no cover showing on the pour face, honeycombing in a column, a cold joint in a slab, or a roof left uncured that dried in the wind. appears.

The check uses Cover spacers, a poker vibrator, a column plumb line, and a wetting cover for the slab., and work stops when The pour stops if wind-dry weather or rain on fresh concrete removes the chance of water curing, and concrete is not poured onto a joint fouled with dust.. The measure is By concrete foundations, columns and slabs from the drawing, not by the metre of block wall and not by the metre of plaster., then care stays as follows: A defects watch on visible honeycombing and shrinkage cracks in the concrete, not repairs to wall render.. The page refuses to teach block and brick wall building, and it refuses to teach plaster or any finish on the concrete.

Curing water and its cover

In Concrete structure, “Curing water and its cover” means The surface is wetted and covered after the sheen goes, so wind does not pull water from the top layer. It applies to The founding soil and then column and slab formwork, not a block course and not a plaster coat., and it is not accepted if Steel with no cover showing on the pour face, honeycombing in a column, a cold joint in a slab, or a roof left uncured that dried in the wind. appears.

The check uses Cover spacers, a poker vibrator, a column plumb line, and a wetting cover for the slab., and work stops when The pour stops if wind-dry weather or rain on fresh concrete removes the chance of water curing, and concrete is not poured onto a joint fouled with dust.. The measure is By concrete foundations, columns and slabs from the drawing, not by the metre of block wall and not by the metre of plaster., then care stays as follows: A defects watch on visible honeycombing and shrinkage cracks in the concrete, not repairs to wall render.. The page refuses to teach block and brick wall building, and it refuses to teach plaster or any finish on the concrete.

A clean construction joint

In Concrete structure, “A clean construction joint” means It is roughened and cleaned of dust before concreting continues, so a smooth plane does not remain between two layers. It applies to The founding soil and then column and slab formwork, not a block course and not a plaster coat., and it is not accepted if Steel with no cover showing on the pour face, honeycombing in a column, a cold joint in a slab, or a roof left uncured that dried in the wind. appears.

The check uses Cover spacers, a poker vibrator, a column plumb line, and a wetting cover for the slab., and work stops when The pour stops if wind-dry weather or rain on fresh concrete removes the chance of water curing, and concrete is not poured onto a joint fouled with dust.. The measure is By concrete foundations, columns and slabs from the drawing, not by the metre of block wall and not by the metre of plaster., then care stays as follows: A defects watch on visible honeycombing and shrinkage cracks in the concrete, not repairs to wall render.. The page refuses to teach block and brick wall building, and it refuses to teach plaster or any finish on the concrete.

Tight column formwork

In Concrete structure, “Tight column formwork” means The joints are closed so paste does not leak and honeycombing does not show at the corners. It applies to The founding soil and then column and slab formwork, not a block course and not a plaster coat., and it is not accepted if Steel with no cover showing on the pour face, honeycombing in a column, a cold joint in a slab, or a roof left uncured that dried in the wind. appears.

The check uses Cover spacers, a poker vibrator, a column plumb line, and a wetting cover for the slab., and work stops when The pour stops if wind-dry weather or rain on fresh concrete removes the chance of water curing, and concrete is not poured onto a joint fouled with dust.. The measure is By concrete foundations, columns and slabs from the drawing, not by the metre of block wall and not by the metre of plaster., then care stays as follows: A defects watch on visible honeycombing and shrinkage cracks in the concrete, not repairs to wall render.. The page refuses to teach block and brick wall building, and it refuses to teach plaster or any finish on the concrete.

A borehole or a hold on the foundation

In Concrete structure, “A borehole or a hold on the foundation” means If the borehole is missing, strength is not copied from a nearby job, and the base is marked not yet approved. It applies to The founding soil and then column and slab formwork, not a block course and not a plaster coat., and it is not accepted if Steel with no cover showing on the pour face, honeycombing in a column, a cold joint in a slab, or a roof left uncured that dried in the wind. appears.

The check uses Cover spacers, a poker vibrator, a column plumb line, and a wetting cover for the slab., and work stops when The pour stops if wind-dry weather or rain on fresh concrete removes the chance of water curing, and concrete is not poured onto a joint fouled with dust.. The measure is By concrete foundations, columns and slabs from the drawing, not by the metre of block wall and not by the metre of plaster., then care stays as follows: A defects watch on visible honeycombing and shrinkage cracks in the concrete, not repairs to wall render.. The page refuses to teach block and brick wall building, and it refuses to teach plaster or any finish on the concrete.

Steps for concrete structure

The order of steps in Concrete structure protects the quality of the work. Skipping a step to finish faster shows up at handover.

Read the element drawing

In Concrete structure, “Read the element drawing” means Sizes, grade and steel are taken from the base, column or slab sheet, not from memory. It applies to The founding soil and then column and slab formwork, not a block course and not a plaster coat., and it is not accepted if Steel with no cover showing on the pour face, honeycombing in a column, a cold joint in a slab, or a roof left uncured that dried in the wind. appears.

The check uses Cover spacers, a poker vibrator, a column plumb line, and a wetting cover for the slab., and work stops when The pour stops if wind-dry weather or rain on fresh concrete removes the chance of water curing, and concrete is not poured onto a joint fouled with dust.. The measure is By concrete foundations, columns and slabs from the drawing, not by the metre of block wall and not by the metre of plaster., then care stays as follows: A defects watch on visible honeycombing and shrinkage cracks in the concrete, not repairs to wall render.. The page refuses to teach block and brick wall building, and it refuses to teach plaster or any finish on the concrete.

Check the cover

In Concrete structure, “Check the cover” means Spacers are counted on bottom and side faces, and steel touching the timber is rejected. It applies to The founding soil and then column and slab formwork, not a block course and not a plaster coat., and it is not accepted if Steel with no cover showing on the pour face, honeycombing in a column, a cold joint in a slab, or a roof left uncured that dried in the wind. appears.

The check uses Cover spacers, a poker vibrator, a column plumb line, and a wetting cover for the slab., and work stops when The pour stops if wind-dry weather or rain on fresh concrete removes the chance of water curing, and concrete is not poured onto a joint fouled with dust.. The measure is By concrete foundations, columns and slabs from the drawing, not by the metre of block wall and not by the metre of plaster., then care stays as follows: A defects watch on visible honeycombing and shrinkage cracks in the concrete, not repairs to wall render.. The page refuses to teach block and brick wall building, and it refuses to teach plaster or any finish on the concrete.

Pour the column and compact it

In Concrete structure, “Pour the column and compact it” means Lifts are vibrated until paste shows at the form without segregating the aggregate. It applies to The founding soil and then column and slab formwork, not a block course and not a plaster coat., and it is not accepted if Steel with no cover showing on the pour face, honeycombing in a column, a cold joint in a slab, or a roof left uncured that dried in the wind. appears.

The check uses Cover spacers, a poker vibrator, a column plumb line, and a wetting cover for the slab., and work stops when The pour stops if wind-dry weather or rain on fresh concrete removes the chance of water curing, and concrete is not poured onto a joint fouled with dust.. The measure is By concrete foundations, columns and slabs from the drawing, not by the metre of block wall and not by the metre of plaster., then care stays as follows: A defects watch on visible honeycombing and shrinkage cracks in the concrete, not repairs to wall render.. The page refuses to teach block and brick wall building, and it refuses to teach plaster or any finish on the concrete.

Fix slab steel and its openings

In Concrete structure, “Fix slab steel and its openings” means A stair or light-well opening is formed before the pour. It is not cut from the hardened slab. It applies to The founding soil and then column and slab formwork, not a block course and not a plaster coat., and it is not accepted if Steel with no cover showing on the pour face, honeycombing in a column, a cold joint in a slab, or a roof left uncured that dried in the wind. appears.

The check uses Cover spacers, a poker vibrator, a column plumb line, and a wetting cover for the slab., and work stops when The pour stops if wind-dry weather or rain on fresh concrete removes the chance of water curing, and concrete is not poured onto a joint fouled with dust.. The measure is By concrete foundations, columns and slabs from the drawing, not by the metre of block wall and not by the metre of plaster., then care stays as follows: A defects watch on visible honeycombing and shrinkage cracks in the concrete, not repairs to wall render.. The page refuses to teach block and brick wall building, and it refuses to teach plaster or any finish on the concrete.

Pour the slab without a dirty joint

In Concrete structure, “Pour the slab without a dirty joint” means If the pour stops, the joint is cleaned before the layer dries and is covered with dust. It applies to The founding soil and then column and slab formwork, not a block course and not a plaster coat., and it is not accepted if Steel with no cover showing on the pour face, honeycombing in a column, a cold joint in a slab, or a roof left uncured that dried in the wind. appears.

The check uses Cover spacers, a poker vibrator, a column plumb line, and a wetting cover for the slab., and work stops when The pour stops if wind-dry weather or rain on fresh concrete removes the chance of water curing, and concrete is not poured onto a joint fouled with dust.. The measure is By concrete foundations, columns and slabs from the drawing, not by the metre of block wall and not by the metre of plaster., then care stays as follows: A defects watch on visible honeycombing and shrinkage cracks in the concrete, not repairs to wall render.. The page refuses to teach block and brick wall building, and it refuses to teach plaster or any finish on the concrete.

Start curing

In Concrete structure, “Start curing” means After bleed water disappears the slab is covered and wetted, and the rate is increased in wind and heat. It applies to The founding soil and then column and slab formwork, not a block course and not a plaster coat., and it is not accepted if Steel with no cover showing on the pour face, honeycombing in a column, a cold joint in a slab, or a roof left uncured that dried in the wind. appears.

The check uses Cover spacers, a poker vibrator, a column plumb line, and a wetting cover for the slab., and work stops when The pour stops if wind-dry weather or rain on fresh concrete removes the chance of water curing, and concrete is not poured onto a joint fouled with dust.. The measure is By concrete foundations, columns and slabs from the drawing, not by the metre of block wall and not by the metre of plaster., then care stays as follows: A defects watch on visible honeycombing and shrinkage cracks in the concrete, not repairs to wall render.. The page refuses to teach block and brick wall building, and it refuses to teach plaster or any finish on the concrete.

Strike with leave for that element

In Concrete structure, “Strike with leave for that element” means Column and slab are not opened on a copied timetable. The supervisor looks at this pour. It applies to The founding soil and then column and slab formwork, not a block course and not a plaster coat., and it is not accepted if Steel with no cover showing on the pour face, honeycombing in a column, a cold joint in a slab, or a roof left uncured that dried in the wind. appears.

The check uses Cover spacers, a poker vibrator, a column plumb line, and a wetting cover for the slab., and work stops when The pour stops if wind-dry weather or rain on fresh concrete removes the chance of water curing, and concrete is not poured onto a joint fouled with dust.. The measure is By concrete foundations, columns and slabs from the drawing, not by the metre of block wall and not by the metre of plaster., then care stays as follows: A defects watch on visible honeycombing and shrinkage cracks in the concrete, not repairs to wall render.. The page refuses to teach block and brick wall building, and it refuses to teach plaster or any finish on the concrete.

Hand over the frame before blockwork

In Concrete structure, “Hand over the frame before blockwork” means Walls and plaster do not enter the frame minute. It applies to The founding soil and then column and slab formwork, not a block course and not a plaster coat., and it is not accepted if Steel with no cover showing on the pour face, honeycombing in a column, a cold joint in a slab, or a roof left uncured that dried in the wind. appears.

The check uses Cover spacers, a poker vibrator, a column plumb line, and a wetting cover for the slab., and work stops when The pour stops if wind-dry weather or rain on fresh concrete removes the chance of water curing, and concrete is not poured onto a joint fouled with dust.. The measure is By concrete foundations, columns and slabs from the drawing, not by the metre of block wall and not by the metre of plaster., then care stays as follows: A defects watch on visible honeycombing and shrinkage cracks in the concrete, not repairs to wall render.. The page refuses to teach block and brick wall building, and it refuses to teach plaster or any finish on the concrete.

Common mistakes in concrete structure

Pouring with steel against the form

In Concrete structure, “Pouring with steel against the form” means Cover is lost and bars show after striking on an exposed face. It applies to The founding soil and then column and slab formwork, not a block course and not a plaster coat., and it is not accepted if Steel with no cover showing on the pour face, honeycombing in a column, a cold joint in a slab, or a roof left uncured that dried in the wind. appears.

The check uses Cover spacers, a poker vibrator, a column plumb line, and a wetting cover for the slab., and work stops when The pour stops if wind-dry weather or rain on fresh concrete removes the chance of water curing, and concrete is not poured onto a joint fouled with dust.. The measure is By concrete foundations, columns and slabs from the drawing, not by the metre of block wall and not by the metre of plaster., then care stays as follows: A defects watch on visible honeycombing and shrinkage cracks in the concrete, not repairs to wall render.. The page refuses to teach block and brick wall building, and it refuses to teach plaster or any finish on the concrete.

Poor compaction at the foot of the column

In Concrete structure, “Poor compaction at the foot of the column” means Honeycombing gathers where the poker is hard to see. It applies to The founding soil and then column and slab formwork, not a block course and not a plaster coat., and it is not accepted if Steel with no cover showing on the pour face, honeycombing in a column, a cold joint in a slab, or a roof left uncured that dried in the wind. appears.

The check uses Cover spacers, a poker vibrator, a column plumb line, and a wetting cover for the slab., and work stops when The pour stops if wind-dry weather or rain on fresh concrete removes the chance of water curing, and concrete is not poured onto a joint fouled with dust.. The measure is By concrete foundations, columns and slabs from the drawing, not by the metre of block wall and not by the metre of plaster., then care stays as follows: A defects watch on visible honeycombing and shrinkage cracks in the concrete, not repairs to wall render.. The page refuses to teach block and brick wall building, and it refuses to teach plaster or any finish on the concrete.

A smooth dusty construction joint

In Concrete structure, “A smooth dusty construction joint” means The two layers do not bond and separate easily when loaded. It applies to The founding soil and then column and slab formwork, not a block course and not a plaster coat., and it is not accepted if Steel with no cover showing on the pour face, honeycombing in a column, a cold joint in a slab, or a roof left uncured that dried in the wind. appears.

The check uses Cover spacers, a poker vibrator, a column plumb line, and a wetting cover for the slab., and work stops when The pour stops if wind-dry weather or rain on fresh concrete removes the chance of water curing, and concrete is not poured onto a joint fouled with dust.. The measure is By concrete foundations, columns and slabs from the drawing, not by the metre of block wall and not by the metre of plaster., then care stays as follows: A defects watch on visible honeycombing and shrinkage cracks in the concrete, not repairs to wall render.. The page refuses to teach block and brick wall building, and it refuses to teach plaster or any finish on the concrete.

Leaving the slab bare to the wind

In Concrete structure, “Leaving the slab bare to the wind” means Hairline cracks appear on the same day on the coast and in central-region heat. It applies to The founding soil and then column and slab formwork, not a block course and not a plaster coat., and it is not accepted if Steel with no cover showing on the pour face, honeycombing in a column, a cold joint in a slab, or a roof left uncured that dried in the wind. appears.

The check uses Cover spacers, a poker vibrator, a column plumb line, and a wetting cover for the slab., and work stops when The pour stops if wind-dry weather or rain on fresh concrete removes the chance of water curing, and concrete is not poured onto a joint fouled with dust.. The measure is By concrete foundations, columns and slabs from the drawing, not by the metre of block wall and not by the metre of plaster., then care stays as follows: A defects watch on visible honeycombing and shrinkage cracks in the concrete, not repairs to wall render.. The page refuses to teach block and brick wall building, and it refuses to teach plaster or any finish on the concrete.

Cutting an opening after hardening

In Concrete structure, “Cutting an opening after hardening” means Steel that should have turned around the opening is cut. It applies to The founding soil and then column and slab formwork, not a block course and not a plaster coat., and it is not accepted if Steel with no cover showing on the pour face, honeycombing in a column, a cold joint in a slab, or a roof left uncured that dried in the wind. appears.

The check uses Cover spacers, a poker vibrator, a column plumb line, and a wetting cover for the slab., and work stops when The pour stops if wind-dry weather or rain on fresh concrete removes the chance of water curing, and concrete is not poured onto a joint fouled with dust.. The measure is By concrete foundations, columns and slabs from the drawing, not by the metre of block wall and not by the metre of plaster., then care stays as follows: A defects watch on visible honeycombing and shrinkage cracks in the concrete, not repairs to wall render.. The page refuses to teach block and brick wall building, and it refuses to teach plaster or any finish on the concrete.

Building block before the frame is handed over

In Concrete structure, “Building block before the frame is handed over” means The wall hides honeycombing in a column that is not yet closed. It applies to The founding soil and then column and slab formwork, not a block course and not a plaster coat., and it is not accepted if Steel with no cover showing on the pour face, honeycombing in a column, a cold joint in a slab, or a roof left uncured that dried in the wind. appears.

The check uses Cover spacers, a poker vibrator, a column plumb line, and a wetting cover for the slab., and work stops when The pour stops if wind-dry weather or rain on fresh concrete removes the chance of water curing, and concrete is not poured onto a joint fouled with dust.. The measure is By concrete foundations, columns and slabs from the drawing, not by the metre of block wall and not by the metre of plaster., then care stays as follows: A defects watch on visible honeycombing and shrinkage cracks in the concrete, not repairs to wall render.. The page refuses to teach block and brick wall building, and it refuses to teach plaster or any finish on the concrete.

What affects the price of concrete structure

The price of Concrete structure is set after the survey, because it changes with the city, access, the surface and the season. The factors below show what raises or lowers the cost.

Number of columns and slabs

In Concrete structure, “Number of columns and slabs” means Each extra slab repeats formwork, compaction and curing. It applies to The founding soil and then column and slab formwork, not a block course and not a plaster coat., and it is not accepted if Steel with no cover showing on the pour face, honeycombing in a column, a cold joint in a slab, or a roof left uncured that dried in the wind. appears.

The check uses Cover spacers, a poker vibrator, a column plumb line, and a wetting cover for the slab., and work stops when The pour stops if wind-dry weather or rain on fresh concrete removes the chance of water curing, and concrete is not poured onto a joint fouled with dust.. The measure is By concrete foundations, columns and slabs from the drawing, not by the metre of block wall and not by the metre of plaster., then care stays as follows: A defects watch on visible honeycombing and shrinkage cracks in the concrete, not repairs to wall render.. The page refuses to teach block and brick wall building, and it refuses to teach plaster or any finish on the concrete.

The need for a borehole

In Concrete structure, “The need for a borehole” means A missing soil report holds approval of the base and is not replaced by a guess. It applies to The founding soil and then column and slab formwork, not a block course and not a plaster coat., and it is not accepted if Steel with no cover showing on the pour face, honeycombing in a column, a cold joint in a slab, or a roof left uncured that dried in the wind. appears.

The check uses Cover spacers, a poker vibrator, a column plumb line, and a wetting cover for the slab., and work stops when The pour stops if wind-dry weather or rain on fresh concrete removes the chance of water curing, and concrete is not poured onto a joint fouled with dust.. The measure is By concrete foundations, columns and slabs from the drawing, not by the metre of block wall and not by the metre of plaster., then care stays as follows: A defects watch on visible honeycombing and shrinkage cracks in the concrete, not repairs to wall render.. The page refuses to teach block and brick wall building, and it refuses to teach plaster or any finish on the concrete.

Weather that forces longer curing

In Concrete structure, “Weather that forces longer curing” means Wind and heat add water and covering and do not change the definition of the trade. It applies to The founding soil and then column and slab formwork, not a block course and not a plaster coat., and it is not accepted if Steel with no cover showing on the pour face, honeycombing in a column, a cold joint in a slab, or a roof left uncured that dried in the wind. appears.

The check uses Cover spacers, a poker vibrator, a column plumb line, and a wetting cover for the slab., and work stops when The pour stops if wind-dry weather or rain on fresh concrete removes the chance of water curing, and concrete is not poured onto a joint fouled with dust.. The measure is By concrete foundations, columns and slabs from the drawing, not by the metre of block wall and not by the metre of plaster., then care stays as follows: A defects watch on visible honeycombing and shrinkage cracks in the concrete, not repairs to wall render.. The page refuses to teach block and brick wall building, and it refuses to teach plaster or any finish on the concrete.

Mixer access to the formwork

In Concrete structure, “Mixer access to the formwork” means A long hand shift raises pour time and weakens continuous compaction. It applies to The founding soil and then column and slab formwork, not a block course and not a plaster coat., and it is not accepted if Steel with no cover showing on the pour face, honeycombing in a column, a cold joint in a slab, or a roof left uncured that dried in the wind. appears.

The check uses Cover spacers, a poker vibrator, a column plumb line, and a wetting cover for the slab., and work stops when The pour stops if wind-dry weather or rain on fresh concrete removes the chance of water curing, and concrete is not poured onto a joint fouled with dust.. The measure is By concrete foundations, columns and slabs from the drawing, not by the metre of block wall and not by the metre of plaster., then care stays as follows: A defects watch on visible honeycombing and shrinkage cracks in the concrete, not repairs to wall render.. The page refuses to teach block and brick wall building, and it refuses to teach plaster or any finish on the concrete.

Distance of the site from Jeddah

In Concrete structure, “Distance of the site from Jeddah” means The visit leaves from the Al Hamdaniyah office. A distant city arranges a longer attendance. It applies to The founding soil and then column and slab formwork, not a block course and not a plaster coat., and it is not accepted if Steel with no cover showing on the pour face, honeycombing in a column, a cold joint in a slab, or a roof left uncured that dried in the wind. appears.

The check uses Cover spacers, a poker vibrator, a column plumb line, and a wetting cover for the slab., and work stops when The pour stops if wind-dry weather or rain on fresh concrete removes the chance of water curing, and concrete is not poured onto a joint fouled with dust.. The measure is By concrete foundations, columns and slabs from the drawing, not by the metre of block wall and not by the metre of plaster., then care stays as follows: A defects watch on visible honeycombing and shrinkage cracks in the concrete, not repairs to wall render.. The page refuses to teach block and brick wall building, and it refuses to teach plaster or any finish on the concrete.

Many openings in the slab

In Concrete structure, “Many openings in the slab” means Each light well or stair adds formwork shaping before the pour. It applies to The founding soil and then column and slab formwork, not a block course and not a plaster coat., and it is not accepted if Steel with no cover showing on the pour face, honeycombing in a column, a cold joint in a slab, or a roof left uncured that dried in the wind. appears.

The check uses Cover spacers, a poker vibrator, a column plumb line, and a wetting cover for the slab., and work stops when The pour stops if wind-dry weather or rain on fresh concrete removes the chance of water curing, and concrete is not poured onto a joint fouled with dust.. The measure is By concrete foundations, columns and slabs from the drawing, not by the metre of block wall and not by the metre of plaster., then care stays as follows: A defects watch on visible honeycombing and shrinkage cracks in the concrete, not repairs to wall render.. The page refuses to teach block and brick wall building, and it refuses to teach plaster or any finish on the concrete.

Handover of concrete structure

Spacers are on the face before the pour

In Concrete structure, “Spacers are on the face before the pour” means No bar touches the timber. It applies to The founding soil and then column and slab formwork, not a block course and not a plaster coat., and it is not accepted if Steel with no cover showing on the pour face, honeycombing in a column, a cold joint in a slab, or a roof left uncured that dried in the wind. appears.

The check uses Cover spacers, a poker vibrator, a column plumb line, and a wetting cover for the slab., and work stops when The pour stops if wind-dry weather or rain on fresh concrete removes the chance of water curing, and concrete is not poured onto a joint fouled with dust.. The measure is By concrete foundations, columns and slabs from the drawing, not by the metre of block wall and not by the metre of plaster., then care stays as follows: A defects watch on visible honeycombing and shrinkage cracks in the concrete, not repairs to wall render.. The page refuses to teach block and brick wall building, and it refuses to teach plaster or any finish on the concrete.

The column is plumb after striking

In Concrete structure, “The column is plumb after striking” means The measure is taken on more than one face. It applies to The founding soil and then column and slab formwork, not a block course and not a plaster coat., and it is not accepted if Steel with no cover showing on the pour face, honeycombing in a column, a cold joint in a slab, or a roof left uncured that dried in the wind. appears.

The check uses Cover spacers, a poker vibrator, a column plumb line, and a wetting cover for the slab., and work stops when The pour stops if wind-dry weather or rain on fresh concrete removes the chance of water curing, and concrete is not poured onto a joint fouled with dust.. The measure is By concrete foundations, columns and slabs from the drawing, not by the metre of block wall and not by the metre of plaster., then care stays as follows: A defects watch on visible honeycombing and shrinkage cracks in the concrete, not repairs to wall render.. The page refuses to teach block and brick wall building, and it refuses to teach plaster or any finish on the concrete.

No visible honeycombing in the corners

In Concrete structure, “No visible honeycombing in the corners” means If it shows, it is recorded before any wall hides it. It applies to The founding soil and then column and slab formwork, not a block course and not a plaster coat., and it is not accepted if Steel with no cover showing on the pour face, honeycombing in a column, a cold joint in a slab, or a roof left uncured that dried in the wind. appears.

The check uses Cover spacers, a poker vibrator, a column plumb line, and a wetting cover for the slab., and work stops when The pour stops if wind-dry weather or rain on fresh concrete removes the chance of water curing, and concrete is not poured onto a joint fouled with dust.. The measure is By concrete foundations, columns and slabs from the drawing, not by the metre of block wall and not by the metre of plaster., then care stays as follows: A defects watch on visible honeycombing and shrinkage cracks in the concrete, not repairs to wall render.. The page refuses to teach block and brick wall building, and it refuses to teach plaster or any finish on the concrete.

Curing started on pour day

In Concrete structure, “Curing started on pour day” means Cover and water are present after bleeding disappears. It applies to The founding soil and then column and slab formwork, not a block course and not a plaster coat., and it is not accepted if Steel with no cover showing on the pour face, honeycombing in a column, a cold joint in a slab, or a roof left uncured that dried in the wind. appears.

The check uses Cover spacers, a poker vibrator, a column plumb line, and a wetting cover for the slab., and work stops when The pour stops if wind-dry weather or rain on fresh concrete removes the chance of water curing, and concrete is not poured onto a joint fouled with dust.. The measure is By concrete foundations, columns and slabs from the drawing, not by the metre of block wall and not by the metre of plaster., then care stays as follows: A defects watch on visible honeycombing and shrinkage cracks in the concrete, not repairs to wall render.. The page refuses to teach block and brick wall building, and it refuses to teach plaster or any finish on the concrete.

Openings are formed, not cut

In Concrete structure, “Openings are formed, not cut” means Opening edges keep the steel as drawn. It applies to The founding soil and then column and slab formwork, not a block course and not a plaster coat., and it is not accepted if Steel with no cover showing on the pour face, honeycombing in a column, a cold joint in a slab, or a roof left uncured that dried in the wind. appears.

The check uses Cover spacers, a poker vibrator, a column plumb line, and a wetting cover for the slab., and work stops when The pour stops if wind-dry weather or rain on fresh concrete removes the chance of water curing, and concrete is not poured onto a joint fouled with dust.. The measure is By concrete foundations, columns and slabs from the drawing, not by the metre of block wall and not by the metre of plaster., then care stays as follows: A defects watch on visible honeycombing and shrinkage cracks in the concrete, not repairs to wall render.. The page refuses to teach block and brick wall building, and it refuses to teach plaster or any finish on the concrete.

Block quantity is outside the minute

In Concrete structure, “Block quantity is outside the minute” means Walls were not merged into the frame bill. It applies to The founding soil and then column and slab formwork, not a block course and not a plaster coat., and it is not accepted if Steel with no cover showing on the pour face, honeycombing in a column, a cold joint in a slab, or a roof left uncured that dried in the wind. appears.

The check uses Cover spacers, a poker vibrator, a column plumb line, and a wetting cover for the slab., and work stops when The pour stops if wind-dry weather or rain on fresh concrete removes the chance of water curing, and concrete is not poured onto a joint fouled with dust.. The measure is By concrete foundations, columns and slabs from the drawing, not by the metre of block wall and not by the metre of plaster., then care stays as follows: A defects watch on visible honeycombing and shrinkage cracks in the concrete, not repairs to wall render.. The page refuses to teach block and brick wall building, and it refuses to teach plaster or any finish on the concrete.

Our work

Photos of the kind of work. The details of this service are above and below.

Entrance maintenance and renovation
Entrance maintenance and renovation
Courtyard maintenance and renovation
Courtyard maintenance and renovation
Outdoor floor renewal
Outdoor floor renewal
School yard development
School yard development
Gardens and facilities
Gardens and facilities
Path landscaping
Path landscaping
Parking yard renewal
Parking yard renewal
Sports field preparation
Sports field preparation

After concrete structure is handed over

A defects watch on visible honeycombing and shrinkage cracks in the concrete, not repairs to wall render. This detail belongs only to Concrete structure and is not pasted onto another trade. The surface in question is The founding soil and then column and slab formwork, not a block course and not a plaster coat., and the exclusion is explicit: The page refuses to teach block and brick wall building, and it refuses to teach plaster or any finish on the concrete..

After striking, the column face and the slab soffit are checked for honeycombing, and wetting of fresh elements continues until the supervisor accepts it. This detail belongs only to Concrete structure and is not pasted onto another trade. The surface in question is The founding soil and then column and slab formwork, not a block course and not a plaster coat., and the exclusion is explicit: The page refuses to teach block and brick wall building, and it refuses to teach plaster or any finish on the concrete..

In Jeddah and the Eastern Province wind dries the slab surface, so it is covered and wetted. In Riyadh in summer an evening pour is preferred, with water continued through the night. This detail belongs only to Concrete structure and is not pasted onto another trade. The surface in question is The founding soil and then column and slab formwork, not a block course and not a plaster coat., and the exclusion is explicit: The page refuses to teach block and brick wall building, and it refuses to teach plaster or any finish on the concrete..

If Steel with no cover showing on the pour face, honeycombing in a column, a cold joint in a slab, or a roof left uncured that dried in the wind. appears, this trade is reopened on the same surface. Work stops when The pour stops if wind-dry weather or rain on fresh concrete removes the chance of water curing, and concrete is not poured onto a joint fouled with dust.. Inspection uses Cover spacers, a poker vibrator, a column plumb line, and a wetting cover for the slab., and the agreed measure is By concrete foundations, columns and slabs from the drawing, not by the metre of block wall and not by the metre of plaster.. After handover, care stays within A defects watch on visible honeycombing and shrinkage cracks in the concrete, not repairs to wall render..

Concrete structure across Saudi regions

How Concrete structure is carried out changes from one region to another with the climate and the access. Districts and the road from Jeddah are on the city page. The link in each region opens it.

Concrete structure in the Riyadh Region

The effect of the Riyadh Region on Concrete structure comes from this constraint: high daytime heat, dust, and a wide gap between afternoon and night temperatures. On The founding soil and then column and slab formwork, not a block course and not a plaster coat. that means delaying work if the constraint meets this limit: The pour stops if wind-dry weather or rain on fresh concrete removes the chance of water curing, and concrete is not poured onto a joint fouled with dust.. The defect looked for here is Steel with no cover showing on the pour face, honeycombing in a column, a cold joint in a slab, or a roof left uncured that dried in the wind., and the measure is By concrete foundations, columns and slabs from the drawing, not by the metre of block wall and not by the metre of plaster.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Riyadh Region page and on its capital page.

Concrete structure in the Makkah Region

The effect of the Makkah Region on Concrete structure comes from this constraint: a hot humid coast in Jeddah and Rabigh, and rock and slopes in Makkah and Taif. On The founding soil and then column and slab formwork, not a block course and not a plaster coat. that means delaying work if the constraint meets this limit: The pour stops if wind-dry weather or rain on fresh concrete removes the chance of water curing, and concrete is not poured onto a joint fouled with dust.. The defect looked for here is Steel with no cover showing on the pour face, honeycombing in a column, a cold joint in a slab, or a roof left uncured that dried in the wind., and the measure is By concrete foundations, columns and slabs from the drawing, not by the metre of block wall and not by the metre of plaster.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Makkah Region page and on its capital page.

Concrete structure in the Madinah Region

The effect of the Madinah Region on Concrete structure comes from this constraint: dry heat, volcanic harra around places such as Khaybar, and an industrial coast at Yanbu. On The founding soil and then column and slab formwork, not a block course and not a plaster coat. that means delaying work if the constraint meets this limit: The pour stops if wind-dry weather or rain on fresh concrete removes the chance of water curing, and concrete is not poured onto a joint fouled with dust.. The defect looked for here is Steel with no cover showing on the pour face, honeycombing in a column, a cold joint in a slab, or a roof left uncured that dried in the wind., and the measure is By concrete foundations, columns and slabs from the drawing, not by the metre of block wall and not by the metre of plaster.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Madinah Region page and on its capital page.

Concrete structure in the Qassim Region

The effect of the Qassim Region on Concrete structure comes from this constraint: a dry Najd climate, dust, and agricultural and trading activity around Buraidah and Unaizah. On The founding soil and then column and slab formwork, not a block course and not a plaster coat. that means delaying work if the constraint meets this limit: The pour stops if wind-dry weather or rain on fresh concrete removes the chance of water curing, and concrete is not poured onto a joint fouled with dust.. The defect looked for here is Steel with no cover showing on the pour face, honeycombing in a column, a cold joint in a slab, or a roof left uncured that dried in the wind., and the measure is By concrete foundations, columns and slabs from the drawing, not by the metre of block wall and not by the metre of plaster.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Qassim Region page and on its capital page.

Concrete structure in the Eastern Province

The effect of the Eastern Province on Concrete structure comes from this constraint: Gulf humidity, sabkha and groundwater on the coast, and high heat inland at Hafar Al Batin. On The founding soil and then column and slab formwork, not a block course and not a plaster coat. that means delaying work if the constraint meets this limit: The pour stops if wind-dry weather or rain on fresh concrete removes the chance of water curing, and concrete is not poured onto a joint fouled with dust.. The defect looked for here is Steel with no cover showing on the pour face, honeycombing in a column, a cold joint in a slab, or a roof left uncured that dried in the wind., and the measure is By concrete foundations, columns and slabs from the drawing, not by the metre of block wall and not by the metre of plaster.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Eastern Province page and on its capital page.

Concrete structure in the Asir Region

The effect of the Asir Region on Concrete structure comes from this constraint: rainy foggy highlands around Abha, and stronger heat in Bisha and Tathlith. On The founding soil and then column and slab formwork, not a block course and not a plaster coat. that means delaying work if the constraint meets this limit: The pour stops if wind-dry weather or rain on fresh concrete removes the chance of water curing, and concrete is not poured onto a joint fouled with dust.. The defect looked for here is Steel with no cover showing on the pour face, honeycombing in a column, a cold joint in a slab, or a roof left uncured that dried in the wind., and the measure is By concrete foundations, columns and slabs from the drawing, not by the metre of block wall and not by the metre of plaster.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Asir Region page and on its capital page.

Concrete structure in the Tabuk Region

The effect of the Tabuk Region on Concrete structure comes from this constraint: hot summers, cold nights in winter, wind, and a Red Sea coast at Al Wajh, Duba and Umluj. On The founding soil and then column and slab formwork, not a block course and not a plaster coat. that means delaying work if the constraint meets this limit: The pour stops if wind-dry weather or rain on fresh concrete removes the chance of water curing, and concrete is not poured onto a joint fouled with dust.. The defect looked for here is Steel with no cover showing on the pour face, honeycombing in a column, a cold joint in a slab, or a roof left uncured that dried in the wind., and the measure is By concrete foundations, columns and slabs from the drawing, not by the metre of block wall and not by the metre of plaster.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Tabuk Region page and on its capital page.

Concrete structure in the Hail Region

The effect of the Hail Region on Concrete structure comes from this constraint: a dry northern climate, cold nights, and dust on open roads. On The founding soil and then column and slab formwork, not a block course and not a plaster coat. that means delaying work if the constraint meets this limit: The pour stops if wind-dry weather or rain on fresh concrete removes the chance of water curing, and concrete is not poured onto a joint fouled with dust.. The defect looked for here is Steel with no cover showing on the pour face, honeycombing in a column, a cold joint in a slab, or a roof left uncured that dried in the wind., and the measure is By concrete foundations, columns and slabs from the drawing, not by the metre of block wall and not by the metre of plaster.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Hail Region page and on its capital page.

Concrete structure in the Northern Borders Region

The effect of the Northern Borders Region on Concrete structure comes from this constraint: geographic distance, a cold winter, and wind in small border cities. On The founding soil and then column and slab formwork, not a block course and not a plaster coat. that means delaying work if the constraint meets this limit: The pour stops if wind-dry weather or rain on fresh concrete removes the chance of water curing, and concrete is not poured onto a joint fouled with dust.. The defect looked for here is Steel with no cover showing on the pour face, honeycombing in a column, a cold joint in a slab, or a roof left uncured that dried in the wind., and the measure is By concrete foundations, columns and slabs from the drawing, not by the metre of block wall and not by the metre of plaster.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Northern Borders Region page and on its capital page.

Concrete structure in the Jazan Region

The effect of the Jazan Region on Concrete structure comes from this constraint: humid Tihama heat, seasonal rain and wadis, and the island constraint of Farasan. On The founding soil and then column and slab formwork, not a block course and not a plaster coat. that means delaying work if the constraint meets this limit: The pour stops if wind-dry weather or rain on fresh concrete removes the chance of water curing, and concrete is not poured onto a joint fouled with dust.. The defect looked for here is Steel with no cover showing on the pour face, honeycombing in a column, a cold joint in a slab, or a roof left uncured that dried in the wind., and the measure is By concrete foundations, columns and slabs from the drawing, not by the metre of block wall and not by the metre of plaster.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Jazan Region page and on its capital page.

Concrete structure in the Najran Region

The effect of the Najran Region on Concrete structure comes from this constraint: a valley between highlands, heat, and a distance from Jeddah that shows up in supply. On The founding soil and then column and slab formwork, not a block course and not a plaster coat. that means delaying work if the constraint meets this limit: The pour stops if wind-dry weather or rain on fresh concrete removes the chance of water curing, and concrete is not poured onto a joint fouled with dust.. The defect looked for here is Steel with no cover showing on the pour face, honeycombing in a column, a cold joint in a slab, or a roof left uncured that dried in the wind., and the measure is By concrete foundations, columns and slabs from the drawing, not by the metre of block wall and not by the metre of plaster.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Najran Region page and on its capital page.

Concrete structure in the Al Bahah Region

The effect of the Al Bahah Region on Concrete structure comes from this constraint: highlands, fog, rain, and short mountain roads between towns. On The founding soil and then column and slab formwork, not a block course and not a plaster coat. that means delaying work if the constraint meets this limit: The pour stops if wind-dry weather or rain on fresh concrete removes the chance of water curing, and concrete is not poured onto a joint fouled with dust.. The defect looked for here is Steel with no cover showing on the pour face, honeycombing in a column, a cold joint in a slab, or a roof left uncured that dried in the wind., and the measure is By concrete foundations, columns and slabs from the drawing, not by the metre of block wall and not by the metre of plaster.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Al Bahah Region page and on its capital page.

Concrete structure in the Al Jawf Region

The effect of the Al Jawf Region on Concrete structure comes from this constraint: an agricultural north, cold winters, and a long distance from Jeddah. On The founding soil and then column and slab formwork, not a block course and not a plaster coat. that means delaying work if the constraint meets this limit: The pour stops if wind-dry weather or rain on fresh concrete removes the chance of water curing, and concrete is not poured onto a joint fouled with dust.. The defect looked for here is Steel with no cover showing on the pour face, honeycombing in a column, a cold joint in a slab, or a roof left uncured that dried in the wind., and the measure is By concrete foundations, columns and slabs from the drawing, not by the metre of block wall and not by the metre of plaster.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Al Jawf Region page and on its capital page.

A site example of concrete structure

Bases, columns and one floor slab: the borehole is checked or requested, spacers are fixed, the column is compacted with the poker, the slab is cured with water and a cover, and blockwork is not built in this example. This detail belongs only to Concrete structure and is not pasted onto another trade. The surface in question is The founding soil and then column and slab formwork, not a block course and not a plaster coat., and the exclusion is explicit: The page refuses to teach block and brick wall building, and it refuses to teach plaster or any finish on the concrete..

Wall courses and a plaster coat are not counted inside this slab quantity. This detail belongs only to Concrete structure and is not pasted onto another trade. The surface in question is The founding soil and then column and slab formwork, not a block course and not a plaster coat., and the exclusion is explicit: The page refuses to teach block and brick wall building, and it refuses to teach plaster or any finish on the concrete..

If Steel with no cover showing on the pour face, honeycombing in a column, a cold joint in a slab, or a roof left uncured that dried in the wind. appears, this trade is reopened on the same surface. Work stops when The pour stops if wind-dry weather or rain on fresh concrete removes the chance of water curing, and concrete is not poured onto a joint fouled with dust.. Inspection uses Cover spacers, a poker vibrator, a column plumb line, and a wetting cover for the slab., and the agreed measure is By concrete foundations, columns and slabs from the drawing, not by the metre of block wall and not by the metre of plaster.. After handover, care stays within A defects watch on visible honeycombing and shrinkage cracks in the concrete, not repairs to wall render..

The example shows how to think before a survey. It is not a contract and not an approved quantity. Any area the client states is checked on site because By concrete foundations, columns and slabs from the drawing, not by the metre of block wall and not by the metre of plaster. may change after openings, slopes, or zones this trade does not cover are deducted.

What concrete structure does not include

The work closest to Concrete structure is Masonry. Masonry explains block and brick walls between the elements, while this page explains concrete foundations, columns and slabs and refuses to teach wall building. This page explains Concrete structure only.

If the project needs both, each one is listed in the quotation with its own quantity. Start at Masonry if that is the request, or continue here if the request is Concrete structure.

The frame is handed over with plumb columns, cover that was checked before the pour, no visible honeycombing, and a slab still under curing or closed with curing the supervisor has completed. This detail belongs only to Concrete structure and is not pasted onto another trade. The surface in question is The founding soil and then column and slab formwork, not a block course and not a plaster coat., and the exclusion is explicit: The page refuses to teach block and brick wall building, and it refuses to teach plaster or any finish on the concrete..

If Steel with no cover showing on the pour face, honeycombing in a column, a cold joint in a slab, or a roof left uncured that dried in the wind. appears, this trade is reopened on the same surface. Work stops when The pour stops if wind-dry weather or rain on fresh concrete removes the chance of water curing, and concrete is not poured onto a joint fouled with dust.. Inspection uses Cover spacers, a poker vibrator, a column plumb line, and a wetting cover for the slab., and the agreed measure is By concrete foundations, columns and slabs from the drawing, not by the metre of block wall and not by the metre of plaster.. After handover, care stays within A defects watch on visible honeycombing and shrinkage cracks in the concrete, not repairs to wall render..

Common questions about concrete structure

Concrete structure here is foundations, columns and slabs only. A block wall is the masonry page, and plaster is not this trade. Concrete grade and reinforcement are taken from the element drawing. Soil strength is not invented if the borehole is missing.
It is requested when the load-bearing frame, a concrete slab or bases are built, before a wall course starts. If the work is block walls between columns already standing, the page is masonry, not the frame.
Materials used for Concrete structure include: Cover spacers, A poker vibrator, Curing water and its cover, A clean construction joint, Tight column formwork. They are fixed to the steel before the form is closed so the bar distance to the concrete face stays as drawn.
Concrete structure follows this order: Read the element drawing, Check the cover, Pour the column and compact it, Fix slab steel and its openings, Pour the slab without a dirty joint. Skipping a step shows up at handover.
Mistakes we refuse in Concrete structure: Pouring with steel against the form, Poor compaction at the foot of the column, A smooth dusty construction joint, Leaving the slab bare to the wind, Cutting an opening after hardening. Cover is lost and bars show after striking on an exposed face.
The price of Concrete structure is set after the survey. It changes with: Number of columns and slabs, The need for a borehole, Weather that forces longer curing, Mixer access to the formwork, Distance of the site from Jeddah. The measure is By concrete foundations, columns and slabs from the drawing, not by the metre of block wall and not by the metre of plaster.
At handover of Concrete structure we check: Spacers are on the face before the pour, The column is plumb after striking, No visible honeycombing in the corners, Curing started on pour day, Openings are formed, not cut. No bar touches the timber.
A defects watch on visible honeycombing and shrinkage cracks in the concrete, not repairs to wall render. After striking, the column face and the slab soffit are checked for honeycombing, and wetting of fresh elements continues until the supervisor accepts it.
In Jeddah and the Eastern Province wind dries the slab surface, so it is covered and wetted. In Riyadh in summer an evening pour is preferred, with water continued through the night. The visit date follows the city’s heat and the distance from the Jeddah office in Al Hamdaniyah.
Bases, columns and one floor slab: the borehole is checked or requested, spacers are fixed, the column is compacted with the poker, the slab is cured with water and a cover, and blockwork is not built in this example. Wall courses and a plaster coat are not counted inside this slab quantity.
The page refuses to teach block and brick wall building, and it refuses to teach plaster or any finish on the concrete. If the request is Masonry, the details are on its page, because Masonry explains block and brick walls between the elements, while this page explains concrete foundations, columns and slabs and refuses to teach wall building.
No. Walls are on the masonry page. This page is foundations, columns and slabs.
After bleed water disappears the surface is covered and wetted. Wind in Jeddah and Riyadh heat call for faster covering of the edges.
Strength is not invented. A borehole is requested, or the base stays unapproved in the minute.
No. Striking is by the supervisor's leave on this pour after the element is seen, with no copied clause number.
Mayyas Alarab Contracting from its office in Al Hamdaniyah, Jeddah, then the visit is scheduled to the project city.