Scope of masonry

Masonry is walls only. Pouring the base, column and slab is the concrete-structure page, and plaster is a later page of its own. This detail belongs only to Masonry and is not pasted onto another trade. The surface in question is A clean floor or an existing grade beam and columns and a slab already in place, with the wall built between them, not a column form that is still open., and the exclusion is explicit: The page refuses to teach concrete foundations, columns and slabs, and it refuses to teach plaster over the wall..

The opening is left to its size, and a concrete lintel, if needed, is requested from the frame trade. It is not explained here as column pouring. This detail belongs only to Masonry and is not pasted onto another trade. The surface in question is A clean floor or an existing grade beam and columns and a slab already in place, with the wall built between them, not a column form that is still open., and the exclusion is explicit: The page refuses to teach concrete foundations, columns and slabs, and it refuses to teach plaster over the wall..

If A leaning wall, a first course with no damp check at the floor, mortar that burned in the heat and let go, or a wall meeting a column with no ties. appears, this trade is reopened on the same surface. Work stops when Building stops if wind dries the mortar before it sets or if rain wets a fresh course, and new walls are shaded in the summer afternoon.. Inspection uses A course line, a spirit level, tie pieces for the column, and light water to wet the block in the heat., and the agreed measure is By the square metre of block or brick wall after openings are deducted, not by the metre of column and slab concrete.. After handover, care stays within A defects watch on the crack where the wall meets the column and on mortar that has fallen, not repairs to honeycombing in the frame..

The page refuses to teach concrete foundations, columns and slabs, and it refuses to teach plaster over the wall. If the project needs Concrete structure, the details are on the Concrete structure page. Concrete structure explains pouring foundations, columns and slabs, while this page explains block and brick walls only and refuses to teach the concrete frame.

We carry out Masonry in cities across Saudi Arabia. Season and access change from one city to another. Open your city from the region pages for the visit date, and stay here for how Masonry itself is done.

When we carry out masonry

Someone who wants block or brick walls after the column and slab are already standing, not someone who wants the frame poured. This detail belongs only to Masonry and is not pasted onto another trade. The surface in question is A clean floor or an existing grade beam and columns and a slab already in place, with the wall built between them, not a column form that is still open., and the exclusion is explicit: The page refuses to teach concrete foundations, columns and slabs, and it refuses to teach plaster over the wall..

It is requested after columns and slabs have been accepted, when the spaces are ready to be closed with walls. This detail belongs only to Masonry and is not pasted onto another trade. The surface in question is A clean floor or an existing grade beam and columns and a slab already in place, with the wall built between them, not a column form that is still open., and the exclusion is explicit: The page refuses to teach concrete foundations, columns and slabs, and it refuses to teach plaster over the wall..

If the column is not yet poured, the work is concrete structure. If the request is to render the wall, the page is not masonry. This detail belongs only to Masonry and is not pasted onto another trade. The surface in question is A clean floor or an existing grade beam and columns and a slab already in place, with the wall built between them, not a column form that is still open., and the exclusion is explicit: The page refuses to teach concrete foundations, columns and slabs, and it refuses to teach plaster over the wall..

If A leaning wall, a first course with no damp check at the floor, mortar that burned in the heat and let go, or a wall meeting a column with no ties. appears, this trade is reopened on the same surface. Work stops when Building stops if wind dries the mortar before it sets or if rain wets a fresh course, and new walls are shaded in the summer afternoon.. Inspection uses A course line, a spirit level, tie pieces for the column, and light water to wet the block in the heat., and the agreed measure is By the square metre of block or brick wall after openings are deducted, not by the metre of column and slab concrete.. After handover, care stays within A defects watch on the crack where the wall meets the column and on mortar that has fallen, not repairs to honeycombing in the frame..

A request for Masonry starts when the client names the city, the building and the limit of work. The office is in Jeddah, and visits in other cities are arranged by distance. This page explains the work itself.

Materials for masonry

The materials of Masonry are listed below. Each one has an acceptance rule. If the rule is missed, the batch is rejected before the work continues.

Wall block or brick

In Masonry, “Wall block or brick” means It closes the space between columns after the frame is stable. It is not used in place of column concrete. It applies to A clean floor or an existing grade beam and columns and a slab already in place, with the wall built between them, not a column form that is still open., and it is not accepted if A leaning wall, a first course with no damp check at the floor, mortar that burned in the heat and let go, or a wall meeting a column with no ties. appears.

The check uses A course line, a spirit level, tie pieces for the column, and light water to wet the block in the heat., and work stops when Building stops if wind dries the mortar before it sets or if rain wets a fresh course, and new walls are shaded in the summer afternoon.. The measure is By the square metre of block or brick wall after openings are deducted, not by the metre of column and slab concrete., then care stays as follows: A defects watch on the crack where the wall meets the column and on mortar that has fallen, not repairs to honeycombing in the frame.. The page refuses to teach concrete foundations, columns and slabs, and it refuses to teach plaster over the wall.

Bedding mortar that is kept damp

In Masonry, “Bedding mortar that is kept damp” means It is spread on a wetted course in the heat so the unit does not suck the mortar water and let go. It applies to A clean floor or an existing grade beam and columns and a slab already in place, with the wall built between them, not a column form that is still open., and it is not accepted if A leaning wall, a first course with no damp check at the floor, mortar that burned in the heat and let go, or a wall meeting a column with no ties. appears.

The check uses A course line, a spirit level, tie pieces for the column, and light water to wet the block in the heat., and work stops when Building stops if wind dries the mortar before it sets or if rain wets a fresh course, and new walls are shaded in the summer afternoon.. The measure is By the square metre of block or brick wall after openings are deducted, not by the metre of column and slab concrete., then care stays as follows: A defects watch on the crack where the wall meets the column and on mortar that has fallen, not repairs to honeycombing in the frame.. The page refuses to teach concrete foundations, columns and slabs, and it refuses to teach plaster over the wall.

Ties to the column

In Masonry, “Ties to the column” means Tie pieces are spaced up the height so the wall does not stay detached from the frame under small loads and thermal movement. It applies to A clean floor or an existing grade beam and columns and a slab already in place, with the wall built between them, not a column form that is still open., and it is not accepted if A leaning wall, a first course with no damp check at the floor, mortar that burned in the heat and let go, or a wall meeting a column with no ties. appears.

The check uses A course line, a spirit level, tie pieces for the column, and light water to wet the block in the heat., and work stops when Building stops if wind dries the mortar before it sets or if rain wets a fresh course, and new walls are shaded in the summer afternoon.. The measure is By the square metre of block or brick wall after openings are deducted, not by the metre of column and slab concrete., then care stays as follows: A defects watch on the crack where the wall meets the column and on mortar that has fallen, not repairs to honeycombing in the frame.. The page refuses to teach concrete foundations, columns and slabs, and it refuses to teach plaster over the wall.

Isolation of the first course

In Masonry, “Isolation of the first course” means A damp check is laid under the wall on the floor so moisture does not rise into the block. It applies to A clean floor or an existing grade beam and columns and a slab already in place, with the wall built between them, not a column form that is still open., and it is not accepted if A leaning wall, a first course with no damp check at the floor, mortar that burned in the heat and let go, or a wall meeting a column with no ties. appears.

The check uses A course line, a spirit level, tie pieces for the column, and light water to wet the block in the heat., and work stops when Building stops if wind dries the mortar before it sets or if rain wets a fresh course, and new walls are shaded in the summer afternoon.. The measure is By the square metre of block or brick wall after openings are deducted, not by the metre of column and slab concrete., then care stays as follows: A defects watch on the crack where the wall meets the column and on mortar that has fallen, not repairs to honeycombing in the frame.. The page refuses to teach concrete foundations, columns and slabs, and it refuses to teach plaster over the wall.

A plumb line

In Masonry, “A plumb line” means It is held to the wall face every few courses so the top does not drift from the bottom. It applies to A clean floor or an existing grade beam and columns and a slab already in place, with the wall built between them, not a column form that is still open., and it is not accepted if A leaning wall, a first course with no damp check at the floor, mortar that burned in the heat and let go, or a wall meeting a column with no ties. appears.

The check uses A course line, a spirit level, tie pieces for the column, and light water to wet the block in the heat., and work stops when Building stops if wind dries the mortar before it sets or if rain wets a fresh course, and new walls are shaded in the summer afternoon.. The measure is By the square metre of block or brick wall after openings are deducted, not by the metre of column and slab concrete., then care stays as follows: A defects watch on the crack where the wall meets the column and on mortar that has fallen, not repairs to honeycombing in the frame.. The page refuses to teach concrete foundations, columns and slabs, and it refuses to teach plaster over the wall.

A lintel requested from the frame

In Masonry, “A lintel requested from the frame” means The door opening is left, and the concrete element above it is done in the frame trade, not as a mix explained here. It applies to A clean floor or an existing grade beam and columns and a slab already in place, with the wall built between them, not a column form that is still open., and it is not accepted if A leaning wall, a first course with no damp check at the floor, mortar that burned in the heat and let go, or a wall meeting a column with no ties. appears.

The check uses A course line, a spirit level, tie pieces for the column, and light water to wet the block in the heat., and work stops when Building stops if wind dries the mortar before it sets or if rain wets a fresh course, and new walls are shaded in the summer afternoon.. The measure is By the square metre of block or brick wall after openings are deducted, not by the metre of column and slab concrete., then care stays as follows: A defects watch on the crack where the wall meets the column and on mortar that has fallen, not repairs to honeycombing in the frame.. The page refuses to teach concrete foundations, columns and slabs, and it refuses to teach plaster over the wall.

Steps for masonry

The order of steps in Masonry protects the quality of the work. Skipping a step to finish faster shows up at handover.

Accept the wall line

In Masonry, “Accept the wall line” means The grid is strung on a clean floor after it is confirmed that the column and slab are not part of this trade. It applies to A clean floor or an existing grade beam and columns and a slab already in place, with the wall built between them, not a column form that is still open., and it is not accepted if A leaning wall, a first course with no damp check at the floor, mortar that burned in the heat and let go, or a wall meeting a column with no ties. appears.

The check uses A course line, a spirit level, tie pieces for the column, and light water to wet the block in the heat., and work stops when Building stops if wind dries the mortar before it sets or if rain wets a fresh course, and new walls are shaded in the summer afternoon.. The measure is By the square metre of block or brick wall after openings are deducted, not by the metre of column and slab concrete., then care stays as follows: A defects watch on the crack where the wall meets the column and on mortar that has fallen, not repairs to honeycombing in the frame.. The page refuses to teach concrete foundations, columns and slabs, and it refuses to teach plaster over the wall.

Lay the damp check

In Masonry, “Lay the damp check” means The first course does not sit on damp concrete without a break that stops rising water. It applies to A clean floor or an existing grade beam and columns and a slab already in place, with the wall built between them, not a column form that is still open., and it is not accepted if A leaning wall, a first course with no damp check at the floor, mortar that burned in the heat and let go, or a wall meeting a column with no ties. appears.

The check uses A course line, a spirit level, tie pieces for the column, and light water to wet the block in the heat., and work stops when Building stops if wind dries the mortar before it sets or if rain wets a fresh course, and new walls are shaded in the summer afternoon.. The measure is By the square metre of block or brick wall after openings are deducted, not by the metre of column and slab concrete., then care stays as follows: A defects watch on the crack where the wall meets the column and on mortar that has fallen, not repairs to honeycombing in the frame.. The page refuses to teach concrete foundations, columns and slabs, and it refuses to teach plaster over the wall.

Wet the units in the heat

In Masonry, “Wet the units in the heat” means Dry block is dampened before mortar so it does not burn it, without a soak that fills the cores with standing water. It applies to A clean floor or an existing grade beam and columns and a slab already in place, with the wall built between them, not a column form that is still open., and it is not accepted if A leaning wall, a first course with no damp check at the floor, mortar that burned in the heat and let go, or a wall meeting a column with no ties. appears.

The check uses A course line, a spirit level, tie pieces for the column, and light water to wet the block in the heat., and work stops when Building stops if wind dries the mortar before it sets or if rain wets a fresh course, and new walls are shaded in the summer afternoon.. The measure is By the square metre of block or brick wall after openings are deducted, not by the metre of column and slab concrete., then care stays as follows: A defects watch on the crack where the wall meets the column and on mortar that has fallen, not repairs to honeycombing in the frame.. The page refuses to teach concrete foundations, columns and slabs, and it refuses to teach plaster over the wall.

Build courses to the line

In Masonry, “Build courses to the line” means Each course is checked level and plumb before the mortar dries. It applies to A clean floor or an existing grade beam and columns and a slab already in place, with the wall built between them, not a column form that is still open., and it is not accepted if A leaning wall, a first course with no damp check at the floor, mortar that burned in the heat and let go, or a wall meeting a column with no ties. appears.

The check uses A course line, a spirit level, tie pieces for the column, and light water to wet the block in the heat., and work stops when Building stops if wind dries the mortar before it sets or if rain wets a fresh course, and new walls are shaded in the summer afternoon.. The measure is By the square metre of block or brick wall after openings are deducted, not by the metre of column and slab concrete., then care stays as follows: A defects watch on the crack where the wall meets the column and on mortar that has fallen, not repairs to honeycombing in the frame.. The page refuses to teach concrete foundations, columns and slabs, and it refuses to teach plaster over the wall.

Fix the ties

In Masonry, “Fix the ties” means The tie is set at the column as the wall rises, not after the wall is finished. It applies to A clean floor or an existing grade beam and columns and a slab already in place, with the wall built between them, not a column form that is still open., and it is not accepted if A leaning wall, a first course with no damp check at the floor, mortar that burned in the heat and let go, or a wall meeting a column with no ties. appears.

The check uses A course line, a spirit level, tie pieces for the column, and light water to wet the block in the heat., and work stops when Building stops if wind dries the mortar before it sets or if rain wets a fresh course, and new walls are shaded in the summer afternoon.. The measure is By the square metre of block or brick wall after openings are deducted, not by the metre of column and slab concrete., then care stays as follows: A defects watch on the crack where the wall meets the column and on mortar that has fallen, not repairs to honeycombing in the frame.. The page refuses to teach concrete foundations, columns and slabs, and it refuses to teach plaster over the wall.

Leave openings to size

In Masonry, “Leave openings to size” means Door and window are measured while building. The wall is not broken after the mortar has set. It applies to A clean floor or an existing grade beam and columns and a slab already in place, with the wall built between them, not a column form that is still open., and it is not accepted if A leaning wall, a first course with no damp check at the floor, mortar that burned in the heat and let go, or a wall meeting a column with no ties. appears.

The check uses A course line, a spirit level, tie pieces for the column, and light water to wet the block in the heat., and work stops when Building stops if wind dries the mortar before it sets or if rain wets a fresh course, and new walls are shaded in the summer afternoon.. The measure is By the square metre of block or brick wall after openings are deducted, not by the metre of column and slab concrete., then care stays as follows: A defects watch on the crack where the wall meets the column and on mortar that has fallen, not repairs to honeycombing in the frame.. The page refuses to teach concrete foundations, columns and slabs, and it refuses to teach plaster over the wall.

Shade the new wall

In Masonry, “Shade the new wall” means At midday the mortar is shielded from direct sun and wind so it does not evaporate from the face. It applies to A clean floor or an existing grade beam and columns and a slab already in place, with the wall built between them, not a column form that is still open., and it is not accepted if A leaning wall, a first course with no damp check at the floor, mortar that burned in the heat and let go, or a wall meeting a column with no ties. appears.

The check uses A course line, a spirit level, tie pieces for the column, and light water to wet the block in the heat., and work stops when Building stops if wind dries the mortar before it sets or if rain wets a fresh course, and new walls are shaded in the summer afternoon.. The measure is By the square metre of block or brick wall after openings are deducted, not by the metre of column and slab concrete., then care stays as follows: A defects watch on the crack where the wall meets the column and on mortar that has fallen, not repairs to honeycombing in the frame.. The page refuses to teach concrete foundations, columns and slabs, and it refuses to teach plaster over the wall.

Hand over the wall without plaster

In Masonry, “Hand over the wall without plaster” means The minute closes masonry. The render coat stays on its own page. It applies to A clean floor or an existing grade beam and columns and a slab already in place, with the wall built between them, not a column form that is still open., and it is not accepted if A leaning wall, a first course with no damp check at the floor, mortar that burned in the heat and let go, or a wall meeting a column with no ties. appears.

The check uses A course line, a spirit level, tie pieces for the column, and light water to wet the block in the heat., and work stops when Building stops if wind dries the mortar before it sets or if rain wets a fresh course, and new walls are shaded in the summer afternoon.. The measure is By the square metre of block or brick wall after openings are deducted, not by the metre of column and slab concrete., then care stays as follows: A defects watch on the crack where the wall meets the column and on mortar that has fallen, not repairs to honeycombing in the frame.. The page refuses to teach concrete foundations, columns and slabs, and it refuses to teach plaster over the wall.

Common mistakes in masonry

Building the wall before the column is poured

In Masonry, “Building the wall before the column is poured” means Block takes the place of a concrete element that was not built. It applies to A clean floor or an existing grade beam and columns and a slab already in place, with the wall built between them, not a column form that is still open., and it is not accepted if A leaning wall, a first course with no damp check at the floor, mortar that burned in the heat and let go, or a wall meeting a column with no ties. appears.

The check uses A course line, a spirit level, tie pieces for the column, and light water to wet the block in the heat., and work stops when Building stops if wind dries the mortar before it sets or if rain wets a fresh course, and new walls are shaded in the summer afternoon.. The measure is By the square metre of block or brick wall after openings are deducted, not by the metre of column and slab concrete., then care stays as follows: A defects watch on the crack where the wall meets the column and on mortar that has fallen, not repairs to honeycombing in the frame.. The page refuses to teach concrete foundations, columns and slabs, and it refuses to teach plaster over the wall.

A dry course in the heat of the day

In Masonry, “A dry course in the heat of the day” means The mortar whitens and loses its bond before evening. It applies to A clean floor or an existing grade beam and columns and a slab already in place, with the wall built between them, not a column form that is still open., and it is not accepted if A leaning wall, a first course with no damp check at the floor, mortar that burned in the heat and let go, or a wall meeting a column with no ties. appears.

The check uses A course line, a spirit level, tie pieces for the column, and light water to wet the block in the heat., and work stops when Building stops if wind dries the mortar before it sets or if rain wets a fresh course, and new walls are shaded in the summer afternoon.. The measure is By the square metre of block or brick wall after openings are deducted, not by the metre of column and slab concrete., then care stays as follows: A defects watch on the crack where the wall meets the column and on mortar that has fallen, not repairs to honeycombing in the frame.. The page refuses to teach concrete foundations, columns and slabs, and it refuses to teach plaster over the wall.

A wall with no ties

In Masonry, “A wall with no ties” means A crack opens at the column edge with thermal movement. It applies to A clean floor or an existing grade beam and columns and a slab already in place, with the wall built between them, not a column form that is still open., and it is not accepted if A leaning wall, a first course with no damp check at the floor, mortar that burned in the heat and let go, or a wall meeting a column with no ties. appears.

The check uses A course line, a spirit level, tie pieces for the column, and light water to wet the block in the heat., and work stops when Building stops if wind dries the mortar before it sets or if rain wets a fresh course, and new walls are shaded in the summer afternoon.. The measure is By the square metre of block or brick wall after openings are deducted, not by the metre of column and slab concrete., then care stays as follows: A defects watch on the crack where the wall meets the column and on mortar that has fallen, not repairs to honeycombing in the frame.. The page refuses to teach concrete foundations, columns and slabs, and it refuses to teach plaster over the wall.

Skipping the check under the wall

In Masonry, “Skipping the check under the wall” means Damp rises and shows on the bottom of the block before any finish. It applies to A clean floor or an existing grade beam and columns and a slab already in place, with the wall built between them, not a column form that is still open., and it is not accepted if A leaning wall, a first course with no damp check at the floor, mortar that burned in the heat and let go, or a wall meeting a column with no ties. appears.

The check uses A course line, a spirit level, tie pieces for the column, and light water to wet the block in the heat., and work stops when Building stops if wind dries the mortar before it sets or if rain wets a fresh course, and new walls are shaded in the summer afternoon.. The measure is By the square metre of block or brick wall after openings are deducted, not by the metre of column and slab concrete., then care stays as follows: A defects watch on the crack where the wall meets the column and on mortar that has fallen, not repairs to honeycombing in the frame.. The page refuses to teach concrete foundations, columns and slabs, and it refuses to teach plaster over the wall.

Breaking an opening after the courses are done

In Masonry, “Breaking an opening after the courses are done” means Broken edges and loosened mortar around the door. It applies to A clean floor or an existing grade beam and columns and a slab already in place, with the wall built between them, not a column form that is still open., and it is not accepted if A leaning wall, a first course with no damp check at the floor, mortar that burned in the heat and let go, or a wall meeting a column with no ties. appears.

The check uses A course line, a spirit level, tie pieces for the column, and light water to wet the block in the heat., and work stops when Building stops if wind dries the mortar before it sets or if rain wets a fresh course, and new walls are shaded in the summer afternoon.. The measure is By the square metre of block or brick wall after openings are deducted, not by the metre of column and slab concrete., then care stays as follows: A defects watch on the crack where the wall meets the column and on mortar that has fallen, not repairs to honeycombing in the frame.. The page refuses to teach concrete foundations, columns and slabs, and it refuses to teach plaster over the wall.

Counting the column inside the wall metre

In Masonry, “Counting the column inside the wall metre” means Frame concrete enters the masonry quantity. It applies to A clean floor or an existing grade beam and columns and a slab already in place, with the wall built between them, not a column form that is still open., and it is not accepted if A leaning wall, a first course with no damp check at the floor, mortar that burned in the heat and let go, or a wall meeting a column with no ties. appears.

The check uses A course line, a spirit level, tie pieces for the column, and light water to wet the block in the heat., and work stops when Building stops if wind dries the mortar before it sets or if rain wets a fresh course, and new walls are shaded in the summer afternoon.. The measure is By the square metre of block or brick wall after openings are deducted, not by the metre of column and slab concrete., then care stays as follows: A defects watch on the crack where the wall meets the column and on mortar that has fallen, not repairs to honeycombing in the frame.. The page refuses to teach concrete foundations, columns and slabs, and it refuses to teach plaster over the wall.

What affects the price of masonry

The price of Masonry is set after the survey, because it changes with the city, access, the surface and the season. The factors below show what raises or lowers the cost.

Wall area after openings

In Masonry, “Wall area after openings” means The opening is deducted, and its edges add time for level and line. It applies to A clean floor or an existing grade beam and columns and a slab already in place, with the wall built between them, not a column form that is still open., and it is not accepted if A leaning wall, a first course with no damp check at the floor, mortar that burned in the heat and let go, or a wall meeting a column with no ties. appears.

The check uses A course line, a spirit level, tie pieces for the column, and light water to wet the block in the heat., and work stops when Building stops if wind dries the mortar before it sets or if rain wets a fresh course, and new walls are shaded in the summer afternoon.. The measure is By the square metre of block or brick wall after openings are deducted, not by the metre of column and slab concrete., then care stays as follows: A defects watch on the crack where the wall meets the column and on mortar that has fallen, not repairs to honeycombing in the frame.. The page refuses to teach concrete foundations, columns and slabs, and it refuses to teach plaster over the wall.

Wall height

In Masonry, “Wall height” means High courses need access scaffold and a longer plumb line. It applies to A clean floor or an existing grade beam and columns and a slab already in place, with the wall built between them, not a column form that is still open., and it is not accepted if A leaning wall, a first course with no damp check at the floor, mortar that burned in the heat and let go, or a wall meeting a column with no ties. appears.

The check uses A course line, a spirit level, tie pieces for the column, and light water to wet the block in the heat., and work stops when Building stops if wind dries the mortar before it sets or if rain wets a fresh course, and new walls are shaded in the summer afternoon.. The measure is By the square metre of block or brick wall after openings are deducted, not by the metre of column and slab concrete., then care stays as follows: A defects watch on the crack where the wall meets the column and on mortar that has fallen, not repairs to honeycombing in the frame.. The page refuses to teach concrete foundations, columns and slabs, and it refuses to teach plaster over the wall.

Heat that forces wetting and shade

In Masonry, “Heat that forces wetting and shade” means Water and shade add care of the mortar and do not change the unit of measure. It applies to A clean floor or an existing grade beam and columns and a slab already in place, with the wall built between them, not a column form that is still open., and it is not accepted if A leaning wall, a first course with no damp check at the floor, mortar that burned in the heat and let go, or a wall meeting a column with no ties. appears.

The check uses A course line, a spirit level, tie pieces for the column, and light water to wet the block in the heat., and work stops when Building stops if wind dries the mortar before it sets or if rain wets a fresh course, and new walls are shaded in the summer afternoon.. The measure is By the square metre of block or brick wall after openings are deducted, not by the metre of column and slab concrete., then care stays as follows: A defects watch on the crack where the wall meets the column and on mortar that has fallen, not repairs to honeycombing in the frame.. The page refuses to teach concrete foundations, columns and slabs, and it refuses to teach plaster over the wall.

Many meetings with columns

In Masonry, “Many meetings with columns” means Each column needs ties spaced up the height. It applies to A clean floor or an existing grade beam and columns and a slab already in place, with the wall built between them, not a column form that is still open., and it is not accepted if A leaning wall, a first course with no damp check at the floor, mortar that burned in the heat and let go, or a wall meeting a column with no ties. appears.

The check uses A course line, a spirit level, tie pieces for the column, and light water to wet the block in the heat., and work stops when Building stops if wind dries the mortar before it sets or if rain wets a fresh course, and new walls are shaded in the summer afternoon.. The measure is By the square metre of block or brick wall after openings are deducted, not by the metre of column and slab concrete., then care stays as follows: A defects watch on the crack where the wall meets the column and on mortar that has fallen, not repairs to honeycombing in the frame.. The page refuses to teach concrete foundations, columns and slabs, and it refuses to teach plaster over the wall.

Distance of the site from the Jeddah office

In Masonry, “Distance of the site from the Jeddah office” means A wall survey is scheduled from Al Hamdaniyah, not from a branch that is not there. It applies to A clean floor or an existing grade beam and columns and a slab already in place, with the wall built between them, not a column form that is still open., and it is not accepted if A leaning wall, a first course with no damp check at the floor, mortar that burned in the heat and let go, or a wall meeting a column with no ties. appears.

The check uses A course line, a spirit level, tie pieces for the column, and light water to wet the block in the heat., and work stops when Building stops if wind dries the mortar before it sets or if rain wets a fresh course, and new walls are shaded in the summer afternoon.. The measure is By the square metre of block or brick wall after openings are deducted, not by the metre of column and slab concrete., then care stays as follows: A defects watch on the crack where the wall meets the column and on mortar that has fallen, not repairs to honeycombing in the frame.. The page refuses to teach concrete foundations, columns and slabs, and it refuses to teach plaster over the wall.

Block delivery in a narrow passage

In Masonry, “Block delivery in a narrow passage” means Hand shifting from the street to the room raises time compared with unloading beside the wall. It applies to A clean floor or an existing grade beam and columns and a slab already in place, with the wall built between them, not a column form that is still open., and it is not accepted if A leaning wall, a first course with no damp check at the floor, mortar that burned in the heat and let go, or a wall meeting a column with no ties. appears.

The check uses A course line, a spirit level, tie pieces for the column, and light water to wet the block in the heat., and work stops when Building stops if wind dries the mortar before it sets or if rain wets a fresh course, and new walls are shaded in the summer afternoon.. The measure is By the square metre of block or brick wall after openings are deducted, not by the metre of column and slab concrete., then care stays as follows: A defects watch on the crack where the wall meets the column and on mortar that has fallen, not repairs to honeycombing in the frame.. The page refuses to teach concrete foundations, columns and slabs, and it refuses to teach plaster over the wall.

Handover of masonry

The wall is on the line

In Masonry, “The wall is on the line” means The top of the wall does not drift from the bottom. It applies to A clean floor or an existing grade beam and columns and a slab already in place, with the wall built between them, not a column form that is still open., and it is not accepted if A leaning wall, a first course with no damp check at the floor, mortar that burned in the heat and let go, or a wall meeting a column with no ties. appears.

The check uses A course line, a spirit level, tie pieces for the column, and light water to wet the block in the heat., and work stops when Building stops if wind dries the mortar before it sets or if rain wets a fresh course, and new walls are shaded in the summer afternoon.. The measure is By the square metre of block or brick wall after openings are deducted, not by the metre of column and slab concrete., then care stays as follows: A defects watch on the crack where the wall meets the column and on mortar that has fallen, not repairs to honeycombing in the frame.. The page refuses to teach concrete foundations, columns and slabs, and it refuses to teach plaster over the wall.

The first course is isolated

In Masonry, “The first course is isolated” means The damp check is present under the wall. It applies to A clean floor or an existing grade beam and columns and a slab already in place, with the wall built between them, not a column form that is still open., and it is not accepted if A leaning wall, a first course with no damp check at the floor, mortar that burned in the heat and let go, or a wall meeting a column with no ties. appears.

The check uses A course line, a spirit level, tie pieces for the column, and light water to wet the block in the heat., and work stops when Building stops if wind dries the mortar before it sets or if rain wets a fresh course, and new walls are shaded in the summer afternoon.. The measure is By the square metre of block or brick wall after openings are deducted, not by the metre of column and slab concrete., then care stays as follows: A defects watch on the crack where the wall meets the column and on mortar that has fallen, not repairs to honeycombing in the frame.. The page refuses to teach concrete foundations, columns and slabs, and it refuses to teach plaster over the wall.

Ties are spaced at the column

In Masonry, “Ties are spaced at the column” means The ties are not a single row at the bottom only. It applies to A clean floor or an existing grade beam and columns and a slab already in place, with the wall built between them, not a column form that is still open., and it is not accepted if A leaning wall, a first course with no damp check at the floor, mortar that burned in the heat and let go, or a wall meeting a column with no ties. appears.

The check uses A course line, a spirit level, tie pieces for the column, and light water to wet the block in the heat., and work stops when Building stops if wind dries the mortar before it sets or if rain wets a fresh course, and new walls are shaded in the summer afternoon.. The measure is By the square metre of block or brick wall after openings are deducted, not by the metre of column and slab concrete., then care stays as follows: A defects watch on the crack where the wall meets the column and on mortar that has fallen, not repairs to honeycombing in the frame.. The page refuses to teach concrete foundations, columns and slabs, and it refuses to teach plaster over the wall.

The mortar has not burned

In Masonry, “The mortar has not burned” means The face is not whitening and crumbling on a hot building day. It applies to A clean floor or an existing grade beam and columns and a slab already in place, with the wall built between them, not a column form that is still open., and it is not accepted if A leaning wall, a first course with no damp check at the floor, mortar that burned in the heat and let go, or a wall meeting a column with no ties. appears.

The check uses A course line, a spirit level, tie pieces for the column, and light water to wet the block in the heat., and work stops when Building stops if wind dries the mortar before it sets or if rain wets a fresh course, and new walls are shaded in the summer afternoon.. The measure is By the square metre of block or brick wall after openings are deducted, not by the metre of column and slab concrete., then care stays as follows: A defects watch on the crack where the wall meets the column and on mortar that has fallen, not repairs to honeycombing in the frame.. The page refuses to teach concrete foundations, columns and slabs, and it refuses to teach plaster over the wall.

The opening is to size before set

In Masonry, “The opening is to size before set” means There is no later breaking around the door. It applies to A clean floor or an existing grade beam and columns and a slab already in place, with the wall built between them, not a column form that is still open., and it is not accepted if A leaning wall, a first course with no damp check at the floor, mortar that burned in the heat and let go, or a wall meeting a column with no ties. appears.

The check uses A course line, a spirit level, tie pieces for the column, and light water to wet the block in the heat., and work stops when Building stops if wind dries the mortar before it sets or if rain wets a fresh course, and new walls are shaded in the summer afternoon.. The measure is By the square metre of block or brick wall after openings are deducted, not by the metre of column and slab concrete., then care stays as follows: A defects watch on the crack where the wall meets the column and on mortar that has fallen, not repairs to honeycombing in the frame.. The page refuses to teach concrete foundations, columns and slabs, and it refuses to teach plaster over the wall.

Columns are outside the quantity

In Masonry, “Columns are outside the quantity” means The wall metre does not include frame concrete. It applies to A clean floor or an existing grade beam and columns and a slab already in place, with the wall built between them, not a column form that is still open., and it is not accepted if A leaning wall, a first course with no damp check at the floor, mortar that burned in the heat and let go, or a wall meeting a column with no ties. appears.

The check uses A course line, a spirit level, tie pieces for the column, and light water to wet the block in the heat., and work stops when Building stops if wind dries the mortar before it sets or if rain wets a fresh course, and new walls are shaded in the summer afternoon.. The measure is By the square metre of block or brick wall after openings are deducted, not by the metre of column and slab concrete., then care stays as follows: A defects watch on the crack where the wall meets the column and on mortar that has fallen, not repairs to honeycombing in the frame.. The page refuses to teach concrete foundations, columns and slabs, and it refuses to teach plaster over the wall.

Our work

Photos of the kind of work. The details of this service are above and below.

Entrance maintenance and renovation
Entrance maintenance and renovation
Courtyard maintenance and renovation
Courtyard maintenance and renovation
Outdoor floor renewal
Outdoor floor renewal
School yard development
School yard development
Gardens and facilities
Gardens and facilities
Path landscaping
Path landscaping
Parking yard renewal
Parking yard renewal
Sports field preparation
Sports field preparation

After masonry is handed over

A defects watch on the crack where the wall meets the column and on mortar that has fallen, not repairs to honeycombing in the frame. This detail belongs only to Masonry and is not pasted onto another trade. The surface in question is A clean floor or an existing grade beam and columns and a slab already in place, with the wall built between them, not a column form that is still open., and the exclusion is explicit: The page refuses to teach concrete foundations, columns and slabs, and it refuses to teach plaster over the wall..

After building, plumb and the ties at columns are checked, and fresh mortar is wetted on a hot day so it does not burn. Plaster is not started from this page. This detail belongs only to Masonry and is not pasted onto another trade. The surface in question is A clean floor or an existing grade beam and columns and a slab already in place, with the wall built between them, not a column form that is still open., and the exclusion is explicit: The page refuses to teach concrete foundations, columns and slabs, and it refuses to teach plaster over the wall..

Summer in Jeddah and Riyadh dries face mortar quickly, so block is wetted before bedding and the wall is shaded. Rain on a fresh course stops work until the surface dries. This detail belongs only to Masonry and is not pasted onto another trade. The surface in question is A clean floor or an existing grade beam and columns and a slab already in place, with the wall built between them, not a column form that is still open., and the exclusion is explicit: The page refuses to teach concrete foundations, columns and slabs, and it refuses to teach plaster over the wall..

If A leaning wall, a first course with no damp check at the floor, mortar that burned in the heat and let go, or a wall meeting a column with no ties. appears, this trade is reopened on the same surface. Work stops when Building stops if wind dries the mortar before it sets or if rain wets a fresh course, and new walls are shaded in the summer afternoon.. Inspection uses A course line, a spirit level, tie pieces for the column, and light water to wet the block in the heat., and the agreed measure is By the square metre of block or brick wall after openings are deducted, not by the metre of column and slab concrete.. After handover, care stays within A defects watch on the crack where the wall meets the column and on mortar that has fallen, not repairs to honeycombing in the frame..

Masonry across Saudi regions

How Masonry is carried out changes from one region to another with the climate and the access. Districts and the road from Jeddah are on the city page. The link in each region opens it.

Masonry in the Riyadh Region

The effect of the Riyadh Region on Masonry comes from this constraint: high daytime heat, dust, and a wide gap between afternoon and night temperatures. On A clean floor or an existing grade beam and columns and a slab already in place, with the wall built between them, not a column form that is still open. that means delaying work if the constraint meets this limit: Building stops if wind dries the mortar before it sets or if rain wets a fresh course, and new walls are shaded in the summer afternoon.. The defect looked for here is A leaning wall, a first course with no damp check at the floor, mortar that burned in the heat and let go, or a wall meeting a column with no ties., and the measure is By the square metre of block or brick wall after openings are deducted, not by the metre of column and slab concrete.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Riyadh Region page and on its capital page.

Masonry in the Makkah Region

The effect of the Makkah Region on Masonry comes from this constraint: a hot humid coast in Jeddah and Rabigh, and rock and slopes in Makkah and Taif. On A clean floor or an existing grade beam and columns and a slab already in place, with the wall built between them, not a column form that is still open. that means delaying work if the constraint meets this limit: Building stops if wind dries the mortar before it sets or if rain wets a fresh course, and new walls are shaded in the summer afternoon.. The defect looked for here is A leaning wall, a first course with no damp check at the floor, mortar that burned in the heat and let go, or a wall meeting a column with no ties., and the measure is By the square metre of block or brick wall after openings are deducted, not by the metre of column and slab concrete.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Makkah Region page and on its capital page.

Masonry in the Madinah Region

The effect of the Madinah Region on Masonry comes from this constraint: dry heat, volcanic harra around places such as Khaybar, and an industrial coast at Yanbu. On A clean floor or an existing grade beam and columns and a slab already in place, with the wall built between them, not a column form that is still open. that means delaying work if the constraint meets this limit: Building stops if wind dries the mortar before it sets or if rain wets a fresh course, and new walls are shaded in the summer afternoon.. The defect looked for here is A leaning wall, a first course with no damp check at the floor, mortar that burned in the heat and let go, or a wall meeting a column with no ties., and the measure is By the square metre of block or brick wall after openings are deducted, not by the metre of column and slab concrete.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Madinah Region page and on its capital page.

Masonry in the Qassim Region

The effect of the Qassim Region on Masonry comes from this constraint: a dry Najd climate, dust, and agricultural and trading activity around Buraidah and Unaizah. On A clean floor or an existing grade beam and columns and a slab already in place, with the wall built between them, not a column form that is still open. that means delaying work if the constraint meets this limit: Building stops if wind dries the mortar before it sets or if rain wets a fresh course, and new walls are shaded in the summer afternoon.. The defect looked for here is A leaning wall, a first course with no damp check at the floor, mortar that burned in the heat and let go, or a wall meeting a column with no ties., and the measure is By the square metre of block or brick wall after openings are deducted, not by the metre of column and slab concrete.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Qassim Region page and on its capital page.

Masonry in the Eastern Province

The effect of the Eastern Province on Masonry comes from this constraint: Gulf humidity, sabkha and groundwater on the coast, and high heat inland at Hafar Al Batin. On A clean floor or an existing grade beam and columns and a slab already in place, with the wall built between them, not a column form that is still open. that means delaying work if the constraint meets this limit: Building stops if wind dries the mortar before it sets or if rain wets a fresh course, and new walls are shaded in the summer afternoon.. The defect looked for here is A leaning wall, a first course with no damp check at the floor, mortar that burned in the heat and let go, or a wall meeting a column with no ties., and the measure is By the square metre of block or brick wall after openings are deducted, not by the metre of column and slab concrete.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Eastern Province page and on its capital page.

Masonry in the Asir Region

The effect of the Asir Region on Masonry comes from this constraint: rainy foggy highlands around Abha, and stronger heat in Bisha and Tathlith. On A clean floor or an existing grade beam and columns and a slab already in place, with the wall built between them, not a column form that is still open. that means delaying work if the constraint meets this limit: Building stops if wind dries the mortar before it sets or if rain wets a fresh course, and new walls are shaded in the summer afternoon.. The defect looked for here is A leaning wall, a first course with no damp check at the floor, mortar that burned in the heat and let go, or a wall meeting a column with no ties., and the measure is By the square metre of block or brick wall after openings are deducted, not by the metre of column and slab concrete.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Asir Region page and on its capital page.

Masonry in the Tabuk Region

The effect of the Tabuk Region on Masonry comes from this constraint: hot summers, cold nights in winter, wind, and a Red Sea coast at Al Wajh, Duba and Umluj. On A clean floor or an existing grade beam and columns and a slab already in place, with the wall built between them, not a column form that is still open. that means delaying work if the constraint meets this limit: Building stops if wind dries the mortar before it sets or if rain wets a fresh course, and new walls are shaded in the summer afternoon.. The defect looked for here is A leaning wall, a first course with no damp check at the floor, mortar that burned in the heat and let go, or a wall meeting a column with no ties., and the measure is By the square metre of block or brick wall after openings are deducted, not by the metre of column and slab concrete.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Tabuk Region page and on its capital page.

Masonry in the Hail Region

The effect of the Hail Region on Masonry comes from this constraint: a dry northern climate, cold nights, and dust on open roads. On A clean floor or an existing grade beam and columns and a slab already in place, with the wall built between them, not a column form that is still open. that means delaying work if the constraint meets this limit: Building stops if wind dries the mortar before it sets or if rain wets a fresh course, and new walls are shaded in the summer afternoon.. The defect looked for here is A leaning wall, a first course with no damp check at the floor, mortar that burned in the heat and let go, or a wall meeting a column with no ties., and the measure is By the square metre of block or brick wall after openings are deducted, not by the metre of column and slab concrete.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Hail Region page and on its capital page.

Masonry in the Northern Borders Region

The effect of the Northern Borders Region on Masonry comes from this constraint: geographic distance, a cold winter, and wind in small border cities. On A clean floor or an existing grade beam and columns and a slab already in place, with the wall built between them, not a column form that is still open. that means delaying work if the constraint meets this limit: Building stops if wind dries the mortar before it sets or if rain wets a fresh course, and new walls are shaded in the summer afternoon.. The defect looked for here is A leaning wall, a first course with no damp check at the floor, mortar that burned in the heat and let go, or a wall meeting a column with no ties., and the measure is By the square metre of block or brick wall after openings are deducted, not by the metre of column and slab concrete.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Northern Borders Region page and on its capital page.

Masonry in the Jazan Region

The effect of the Jazan Region on Masonry comes from this constraint: humid Tihama heat, seasonal rain and wadis, and the island constraint of Farasan. On A clean floor or an existing grade beam and columns and a slab already in place, with the wall built between them, not a column form that is still open. that means delaying work if the constraint meets this limit: Building stops if wind dries the mortar before it sets or if rain wets a fresh course, and new walls are shaded in the summer afternoon.. The defect looked for here is A leaning wall, a first course with no damp check at the floor, mortar that burned in the heat and let go, or a wall meeting a column with no ties., and the measure is By the square metre of block or brick wall after openings are deducted, not by the metre of column and slab concrete.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Jazan Region page and on its capital page.

Masonry in the Najran Region

The effect of the Najran Region on Masonry comes from this constraint: a valley between highlands, heat, and a distance from Jeddah that shows up in supply. On A clean floor or an existing grade beam and columns and a slab already in place, with the wall built between them, not a column form that is still open. that means delaying work if the constraint meets this limit: Building stops if wind dries the mortar before it sets or if rain wets a fresh course, and new walls are shaded in the summer afternoon.. The defect looked for here is A leaning wall, a first course with no damp check at the floor, mortar that burned in the heat and let go, or a wall meeting a column with no ties., and the measure is By the square metre of block or brick wall after openings are deducted, not by the metre of column and slab concrete.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Najran Region page and on its capital page.

Masonry in the Al Bahah Region

The effect of the Al Bahah Region on Masonry comes from this constraint: highlands, fog, rain, and short mountain roads between towns. On A clean floor or an existing grade beam and columns and a slab already in place, with the wall built between them, not a column form that is still open. that means delaying work if the constraint meets this limit: Building stops if wind dries the mortar before it sets or if rain wets a fresh course, and new walls are shaded in the summer afternoon.. The defect looked for here is A leaning wall, a first course with no damp check at the floor, mortar that burned in the heat and let go, or a wall meeting a column with no ties., and the measure is By the square metre of block or brick wall after openings are deducted, not by the metre of column and slab concrete.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Al Bahah Region page and on its capital page.

Masonry in the Al Jawf Region

The effect of the Al Jawf Region on Masonry comes from this constraint: an agricultural north, cold winters, and a long distance from Jeddah. On A clean floor or an existing grade beam and columns and a slab already in place, with the wall built between them, not a column form that is still open. that means delaying work if the constraint meets this limit: Building stops if wind dries the mortar before it sets or if rain wets a fresh course, and new walls are shaded in the summer afternoon.. The defect looked for here is A leaning wall, a first course with no damp check at the floor, mortar that burned in the heat and let go, or a wall meeting a column with no ties., and the measure is By the square metre of block or brick wall after openings are deducted, not by the metre of column and slab concrete.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Al Jawf Region page and on its capital page.

A site example of masonry

Block walls for rooms after the slab is struck: the area is cleaned, the first course is isolated from ground damp, the wall is tied to the column, and the door opening is deducted from the square metre. This detail belongs only to Masonry and is not pasted onto another trade. The surface in question is A clean floor or an existing grade beam and columns and a slab already in place, with the wall built between them, not a column form that is still open., and the exclusion is explicit: The page refuses to teach concrete foundations, columns and slabs, and it refuses to teach plaster over the wall..

The supporting column and the room slab are not counted inside this wall quantity. This detail belongs only to Masonry and is not pasted onto another trade. The surface in question is A clean floor or an existing grade beam and columns and a slab already in place, with the wall built between them, not a column form that is still open., and the exclusion is explicit: The page refuses to teach concrete foundations, columns and slabs, and it refuses to teach plaster over the wall..

If A leaning wall, a first course with no damp check at the floor, mortar that burned in the heat and let go, or a wall meeting a column with no ties. appears, this trade is reopened on the same surface. Work stops when Building stops if wind dries the mortar before it sets or if rain wets a fresh course, and new walls are shaded in the summer afternoon.. Inspection uses A course line, a spirit level, tie pieces for the column, and light water to wet the block in the heat., and the agreed measure is By the square metre of block or brick wall after openings are deducted, not by the metre of column and slab concrete.. After handover, care stays within A defects watch on the crack where the wall meets the column and on mortar that has fallen, not repairs to honeycombing in the frame..

The example shows how to think before a survey. It is not a contract and not an approved quantity. Any area the client states is checked on site because By the square metre of block or brick wall after openings are deducted, not by the metre of column and slab concrete. may change after openings, slopes, or zones this trade does not cover are deducted.

What masonry does not include

The work closest to Masonry is Concrete structure. Concrete structure explains pouring foundations, columns and slabs, while this page explains block and brick walls only and refuses to teach the concrete frame. This page explains Masonry only.

If the project needs both, each one is listed in the quotation with its own quantity. Start at Concrete structure if that is the request, or continue here if the request is Masonry.

The wall is handed over plumb, with ties spaced at the columns, a first course isolated from the ground, openings at the required size, and mortar that was not left dry on a hot day. This detail belongs only to Masonry and is not pasted onto another trade. The surface in question is A clean floor or an existing grade beam and columns and a slab already in place, with the wall built between them, not a column form that is still open., and the exclusion is explicit: The page refuses to teach concrete foundations, columns and slabs, and it refuses to teach plaster over the wall..

If A leaning wall, a first course with no damp check at the floor, mortar that burned in the heat and let go, or a wall meeting a column with no ties. appears, this trade is reopened on the same surface. Work stops when Building stops if wind dries the mortar before it sets or if rain wets a fresh course, and new walls are shaded in the summer afternoon.. Inspection uses A course line, a spirit level, tie pieces for the column, and light water to wet the block in the heat., and the agreed measure is By the square metre of block or brick wall after openings are deducted, not by the metre of column and slab concrete.. After handover, care stays within A defects watch on the crack where the wall meets the column and on mortar that has fallen, not repairs to honeycombing in the frame..

Common questions about masonry

Masonry is walls only. Pouring the base, column and slab is the concrete-structure page, and plaster is a later page of its own. The opening is left to its size, and a concrete lintel, if needed, is requested from the frame trade. It is not explained here as column pouring.
It is requested after columns and slabs have been accepted, when the spaces are ready to be closed with walls. If the column is not yet poured, the work is concrete structure. If the request is to render the wall, the page is not masonry.
Materials used for Masonry include: Wall block or brick, Bedding mortar that is kept damp, Ties to the column, Isolation of the first course, A plumb line. It closes the space between columns after the frame is stable. It is not used in place of column concrete.
Masonry follows this order: Accept the wall line, Lay the damp check, Wet the units in the heat, Build courses to the line, Fix the ties. Skipping a step shows up at handover.
Mistakes we refuse in Masonry: Building the wall before the column is poured, A dry course in the heat of the day, A wall with no ties, Skipping the check under the wall, Breaking an opening after the courses are done. Block takes the place of a concrete element that was not built.
The price of Masonry is set after the survey. It changes with: Wall area after openings, Wall height, Heat that forces wetting and shade, Many meetings with columns, Distance of the site from the Jeddah office. The measure is By the square metre of block or brick wall after openings are deducted, not by the metre of column and slab concrete.
At handover of Masonry we check: The wall is on the line, The first course is isolated, Ties are spaced at the column, The mortar has not burned, The opening is to size before set. The top of the wall does not drift from the bottom.
A defects watch on the crack where the wall meets the column and on mortar that has fallen, not repairs to honeycombing in the frame. After building, plumb and the ties at columns are checked, and fresh mortar is wetted on a hot day so it does not burn. Plaster is not started from this page.
Summer in Jeddah and Riyadh dries face mortar quickly, so block is wetted before bedding and the wall is shaded. Rain on a fresh course stops work until the surface dries. The visit date follows the city’s heat and the distance from the Jeddah office in Al Hamdaniyah.
Block walls for rooms after the slab is struck: the area is cleaned, the first course is isolated from ground damp, the wall is tied to the column, and the door opening is deducted from the square metre. The supporting column and the room slab are not counted inside this wall quantity.
The page refuses to teach concrete foundations, columns and slabs, and it refuses to teach plaster over the wall. If the request is Concrete structure, the details are on its page, because Concrete structure explains pouring foundations, columns and slabs, while this page explains block and brick walls only and refuses to teach the concrete frame.
No. Columns, slabs and foundations are on the concrete-structure page. This page is the block or brick wall.
In Saudi heat a dry unit sucks water from the mortar and the bond fails. A light dampening before bedding keeps the bond, without a soak that fills the block.
No. The page stops at the standing wall. Render has its own page and its method is not explained here.
By the square metre after openings are deducted. A concrete column is not inside that metre.
From the Mayyas Alarab Contracting office in Al Hamdaniyah, Jeddah, scheduled to the city of the wall.