Scope of facades

This page is for stone and cladding facade systems and the elevation finish, not for paint only and not for coordinating external works. This detail belongs only to Facades and is not pasted onto another trade. The surface in question is A frame or load-bearing wall able to take the fixing, and a vertical reference line for the elevation., and the exclusion is explicit: Paint on its own is refused, the exterior coordination page is refused, and internal wall plaster and interlock are refused..

If the request is a colour coat on external plaster with no cladding, the page is painting. This detail belongs only to Facades and is not pasted onto another trade. The surface in question is A frame or load-bearing wall able to take the fixing, and a vertical reference line for the elevation., and the exclusion is explicit: Paint on its own is refused, the exterior coordination page is refused, and internal wall plaster and interlock are refused..

If A leaning panel, a fixing without salt protection on the coast, a closed movement joint, or water entering at the head of the elevation with no way out. appears, this trade is reopened on the same surface. Work stops when Fixing stops if the wind carries salt onto a bare anchor, or if metal has expanded in heat before a movement joint is left.. Inspection uses A plumb line, a fixing layout, a joint gauge, and a torque wrench where the fixing system requires it., and the agreed measure is By the square metre of elevation cladding or stone, not by a paint metre and not by yard coordination.. After handover, care stays within Resetting a loose fixing and opening a movement joint that was blocked by mistake during the defects period, and washing salt off the stone with fresh water..

Paint on its own is refused, the exterior coordination page is refused, and internal wall plaster and interlock are refused. If the project needs Exterior finishing, the details are on the Exterior finishing page. Exterior finishing is a coordination page for works outside the building, while this page builds only the elevation cladding and stone system, and refuses to become paint-only work or a schedule of yards and entrances.

We carry out Facades in cities across Saudi Arabia. Season and access change from one city to another. Open your city from the region pages for the visit date, and stay here for how Facades itself is done.

When we carry out facades

An owner who wants to close an elevation with a cladding or stone system that has fixings and movement, not a roller colour on plaster. This detail belongs only to Facades and is not pasted onto another trade. The surface in question is A frame or load-bearing wall able to take the fixing, and a vertical reference line for the elevation., and the exclusion is explicit: Paint on its own is refused, the exterior coordination page is refused, and internal wall plaster and interlock are refused..

It is requested when the elevation system, its fixings and its movement joints are defined before the facade is closed. This detail belongs only to Facades and is not pasted onto another trade. The surface in question is A frame or load-bearing wall able to take the fixing, and a vertical reference line for the elevation., and the exclusion is explicit: Paint on its own is refused, the exterior coordination page is refused, and internal wall plaster and interlock are refused..

It is not a substitute for the exterior-finishing page that arranges several works outside the building, nor for a sidewalk or a vehicle entrance. This detail belongs only to Facades and is not pasted onto another trade. The surface in question is A frame or load-bearing wall able to take the fixing, and a vertical reference line for the elevation., and the exclusion is explicit: Paint on its own is refused, the exterior coordination page is refused, and internal wall plaster and interlock are refused..

If A leaning panel, a fixing without salt protection on the coast, a closed movement joint, or water entering at the head of the elevation with no way out. appears, this trade is reopened on the same surface. Work stops when Fixing stops if the wind carries salt onto a bare anchor, or if metal has expanded in heat before a movement joint is left.. Inspection uses A plumb line, a fixing layout, a joint gauge, and a torque wrench where the fixing system requires it., and the agreed measure is By the square metre of elevation cladding or stone, not by a paint metre and not by yard coordination.. After handover, care stays within Resetting a loose fixing and opening a movement joint that was blocked by mistake during the defects period, and washing salt off the stone with fresh water..

A request for Facades starts when the client names the city, the building and the limit of work. The office is in Jeddah, and visits in other cities are arranged by distance. This page explains the work itself.

Materials for facades

The materials of Facades are listed below. Each one has an acceptance rule. If the rule is missed, the batch is rejected before the work continues.

Facade stone of approved thickness

In Facades, “Facade stone of approved thickness” means Thickness and the back face match the fixing system so a thin panel is not pierced by an anchor it was not made for. It applies to A frame or load-bearing wall able to take the fixing, and a vertical reference line for the elevation., and it is not accepted if A leaning panel, a fixing without salt protection on the coast, a closed movement joint, or water entering at the head of the elevation with no way out. appears.

The check uses A plumb line, a fixing layout, a joint gauge, and a torque wrench where the fixing system requires it., and work stops when Fixing stops if the wind carries salt onto a bare anchor, or if metal has expanded in heat before a movement joint is left.. The measure is By the square metre of elevation cladding or stone, not by a paint metre and not by yard coordination., then care stays as follows: Resetting a loose fixing and opening a movement joint that was blocked by mistake during the defects period, and washing salt off the stone with fresh water.. Paint on its own is refused, the exterior coordination page is refused, and internal wall plaster and interlock are refused.

Salt-protected fixing

In Facades, “Salt-protected fixing” means On the coast a bare fixing that rusts behind the stone and then stains the face is refused. It applies to A frame or load-bearing wall able to take the fixing, and a vertical reference line for the elevation., and it is not accepted if A leaning panel, a fixing without salt protection on the coast, a closed movement joint, or water entering at the head of the elevation with no way out. appears.

The check uses A plumb line, a fixing layout, a joint gauge, and a torque wrench where the fixing system requires it., and work stops when Fixing stops if the wind carries salt onto a bare anchor, or if metal has expanded in heat before a movement joint is left.. The measure is By the square metre of elevation cladding or stone, not by a paint metre and not by yard coordination., then care stays as follows: Resetting a loose fixing and opening a movement joint that was blocked by mistake during the defects period, and washing salt off the stone with fresh water.. Paint on its own is refused, the exterior coordination page is refused, and internal wall plaster and interlock are refused.

Secondary frame for panels

In Facades, “Secondary frame for panels” means It carries load back to the building and leaves a gap behind the cladding for water to leave. It applies to A frame or load-bearing wall able to take the fixing, and a vertical reference line for the elevation., and it is not accepted if A leaning panel, a fixing without salt protection on the coast, a closed movement joint, or water entering at the head of the elevation with no way out. appears.

The check uses A plumb line, a fixing layout, a joint gauge, and a torque wrench where the fixing system requires it., and work stops when Fixing stops if the wind carries salt onto a bare anchor, or if metal has expanded in heat before a movement joint is left.. The measure is By the square metre of elevation cladding or stone, not by a paint metre and not by yard coordination., then care stays as follows: Resetting a loose fixing and opening a movement joint that was blocked by mistake during the defects period, and washing salt off the stone with fresh water.. Paint on its own is refused, the exterior coordination page is refused, and internal wall plaster and interlock are refused.

Set movement joint

In Facades, “Set movement joint” means Its width stays open for a flexible seal so the elevation can expand in summer heat. It applies to A frame or load-bearing wall able to take the fixing, and a vertical reference line for the elevation., and it is not accepted if A leaning panel, a fixing without salt protection on the coast, a closed movement joint, or water entering at the head of the elevation with no way out. appears.

The check uses A plumb line, a fixing layout, a joint gauge, and a torque wrench where the fixing system requires it., and work stops when Fixing stops if the wind carries salt onto a bare anchor, or if metal has expanded in heat before a movement joint is left.. The measure is By the square metre of elevation cladding or stone, not by a paint metre and not by yard coordination., then care stays as follows: Resetting a loose fixing and opening a movement joint that was blocked by mistake during the defects period, and washing salt off the stone with fresh water.. Paint on its own is refused, the exterior coordination page is refused, and internal wall plaster and interlock are refused.

Head flashing

In Facades, “Head flashing” means It sends water from the top of the elevation to the outside of the stone face, not into the cavity. It applies to A frame or load-bearing wall able to take the fixing, and a vertical reference line for the elevation., and it is not accepted if A leaning panel, a fixing without salt protection on the coast, a closed movement joint, or water entering at the head of the elevation with no way out. appears.

The check uses A plumb line, a fixing layout, a joint gauge, and a torque wrench where the fixing system requires it., and work stops when Fixing stops if the wind carries salt onto a bare anchor, or if metal has expanded in heat before a movement joint is left.. The measure is By the square metre of elevation cladding or stone, not by a paint metre and not by yard coordination., then care stays as follows: Resetting a loose fixing and opening a movement joint that was blocked by mistake during the defects period, and washing salt off the stone with fresh water.. Paint on its own is refused, the exterior coordination page is refused, and internal wall plaster and interlock are refused.

Edge angle and return

In Facades, “Edge angle and return” means It closes the panel edge at an opening and a corner so a sharp limit is not left unfixed. It applies to A frame or load-bearing wall able to take the fixing, and a vertical reference line for the elevation., and it is not accepted if A leaning panel, a fixing without salt protection on the coast, a closed movement joint, or water entering at the head of the elevation with no way out. appears.

The check uses A plumb line, a fixing layout, a joint gauge, and a torque wrench where the fixing system requires it., and work stops when Fixing stops if the wind carries salt onto a bare anchor, or if metal has expanded in heat before a movement joint is left.. The measure is By the square metre of elevation cladding or stone, not by a paint metre and not by yard coordination., then care stays as follows: Resetting a loose fixing and opening a movement joint that was blocked by mistake during the defects period, and washing salt off the stone with fresh water.. Paint on its own is refused, the exterior coordination page is refused, and internal wall plaster and interlock are refused.

Steps for facades

The order of steps in Facades protects the quality of the work. Skipping a step to finish faster shows up at handover.

Set the plumb reference

In Facades, “Set the plumb reference” means One line from the top of the elevation to the bottom stops lean accumulating floor by floor. It applies to A frame or load-bearing wall able to take the fixing, and a vertical reference line for the elevation., and it is not accepted if A leaning panel, a fixing without salt protection on the coast, a closed movement joint, or water entering at the head of the elevation with no way out. appears.

The check uses A plumb line, a fixing layout, a joint gauge, and a torque wrench where the fixing system requires it., and work stops when Fixing stops if the wind carries salt onto a bare anchor, or if metal has expanded in heat before a movement joint is left.. The measure is By the square metre of elevation cladding or stone, not by a paint metre and not by yard coordination., then care stays as follows: Resetting a loose fixing and opening a movement joint that was blocked by mistake during the defects period, and washing salt off the stone with fresh water.. Paint on its own is refused, the exterior coordination page is refused, and internal wall plaster and interlock are refused.

Set out the fixings

In Facades, “Set out the fixings” means The spacing matches the panel load, and the fixing is set in a capable member, not in plaster. It applies to A frame or load-bearing wall able to take the fixing, and a vertical reference line for the elevation., and it is not accepted if A leaning panel, a fixing without salt protection on the coast, a closed movement joint, or water entering at the head of the elevation with no way out. appears.

The check uses A plumb line, a fixing layout, a joint gauge, and a torque wrench where the fixing system requires it., and work stops when Fixing stops if the wind carries salt onto a bare anchor, or if metal has expanded in heat before a movement joint is left.. The measure is By the square metre of elevation cladding or stone, not by a paint metre and not by yard coordination., then care stays as follows: Resetting a loose fixing and opening a movement joint that was blocked by mistake during the defects period, and washing salt off the stone with fresh water.. Paint on its own is refused, the exterior coordination page is refused, and internal wall plaster and interlock are refused.

Protect the coastal fixing

In Facades, “Protect the coastal fixing” means The isolator or suitable metal is checked before stone closes over it. It applies to A frame or load-bearing wall able to take the fixing, and a vertical reference line for the elevation., and it is not accepted if A leaning panel, a fixing without salt protection on the coast, a closed movement joint, or water entering at the head of the elevation with no way out. appears.

The check uses A plumb line, a fixing layout, a joint gauge, and a torque wrench where the fixing system requires it., and work stops when Fixing stops if the wind carries salt onto a bare anchor, or if metal has expanded in heat before a movement joint is left.. The measure is By the square metre of elevation cladding or stone, not by a paint metre and not by yard coordination., then care stays as follows: Resetting a loose fixing and opening a movement joint that was blocked by mistake during the defects period, and washing salt off the stone with fresh water.. Paint on its own is refused, the exterior coordination page is refused, and internal wall plaster and interlock are refused.

Set the first course to level

In Facades, “Set the first course to level” means An error here climbs with the rest of the elevation. It applies to A frame or load-bearing wall able to take the fixing, and a vertical reference line for the elevation., and it is not accepted if A leaning panel, a fixing without salt protection on the coast, a closed movement joint, or water entering at the head of the elevation with no way out. appears.

The check uses A plumb line, a fixing layout, a joint gauge, and a torque wrench where the fixing system requires it., and work stops when Fixing stops if the wind carries salt onto a bare anchor, or if metal has expanded in heat before a movement joint is left.. The measure is By the square metre of elevation cladding or stone, not by a paint metre and not by yard coordination., then care stays as follows: Resetting a loose fixing and opening a movement joint that was blocked by mistake during the defects period, and washing salt off the stone with fresh water.. Paint on its own is refused, the exterior coordination page is refused, and internal wall plaster and interlock are refused.

Keep the cavity behind the cladding

In Facades, “Keep the cavity behind the cladding” means Water that enters a joint must find a way out at the bottom. It applies to A frame or load-bearing wall able to take the fixing, and a vertical reference line for the elevation., and it is not accepted if A leaning panel, a fixing without salt protection on the coast, a closed movement joint, or water entering at the head of the elevation with no way out. appears.

The check uses A plumb line, a fixing layout, a joint gauge, and a torque wrench where the fixing system requires it., and work stops when Fixing stops if the wind carries salt onto a bare anchor, or if metal has expanded in heat before a movement joint is left.. The measure is By the square metre of elevation cladding or stone, not by a paint metre and not by yard coordination., then care stays as follows: Resetting a loose fixing and opening a movement joint that was blocked by mistake during the defects period, and washing salt off the stone with fresh water.. Paint on its own is refused, the exterior coordination page is refused, and internal wall plaster and interlock are refused.

Leave the movement joint

In Facades, “Leave the movement joint” means A long corner is not closed with hard mortar that ties the panel to the building as one mass. It applies to A frame or load-bearing wall able to take the fixing, and a vertical reference line for the elevation., and it is not accepted if A leaning panel, a fixing without salt protection on the coast, a closed movement joint, or water entering at the head of the elevation with no way out. appears.

The check uses A plumb line, a fixing layout, a joint gauge, and a torque wrench where the fixing system requires it., and work stops when Fixing stops if the wind carries salt onto a bare anchor, or if metal has expanded in heat before a movement joint is left.. The measure is By the square metre of elevation cladding or stone, not by a paint metre and not by yard coordination., then care stays as follows: Resetting a loose fixing and opening a movement joint that was blocked by mistake during the defects period, and washing salt off the stone with fresh water.. Paint on its own is refused, the exterior coordination page is refused, and internal wall plaster and interlock are refused.

Close edges and openings

In Facades, “Close edges and openings” means The window return is fixed so salt air does not enter behind the edge. It applies to A frame or load-bearing wall able to take the fixing, and a vertical reference line for the elevation., and it is not accepted if A leaning panel, a fixing without salt protection on the coast, a closed movement joint, or water entering at the head of the elevation with no way out. appears.

The check uses A plumb line, a fixing layout, a joint gauge, and a torque wrench where the fixing system requires it., and work stops when Fixing stops if the wind carries salt onto a bare anchor, or if metal has expanded in heat before a movement joint is left.. The measure is By the square metre of elevation cladding or stone, not by a paint metre and not by yard coordination., then care stays as follows: Resetting a loose fixing and opening a movement joint that was blocked by mistake during the defects period, and washing salt off the stone with fresh water.. Paint on its own is refused, the exterior coordination page is refused, and internal wall plaster and interlock are refused.

Wash and final check

In Facades, “Wash and final check” means Dust and salt are washed with fresh water, and the plumb is checked before the minute. It applies to A frame or load-bearing wall able to take the fixing, and a vertical reference line for the elevation., and it is not accepted if A leaning panel, a fixing without salt protection on the coast, a closed movement joint, or water entering at the head of the elevation with no way out. appears.

The check uses A plumb line, a fixing layout, a joint gauge, and a torque wrench where the fixing system requires it., and work stops when Fixing stops if the wind carries salt onto a bare anchor, or if metal has expanded in heat before a movement joint is left.. The measure is By the square metre of elevation cladding or stone, not by a paint metre and not by yard coordination., then care stays as follows: Resetting a loose fixing and opening a movement joint that was blocked by mistake during the defects period, and washing salt off the stone with fresh water.. Paint on its own is refused, the exterior coordination page is refused, and internal wall plaster and interlock are refused.

Common mistakes in facades

Painting the elevation instead of cladding it

In Facades, “Painting the elevation instead of cladding it” means That request belongs on the painting page, and mixing it here cancels the definition of the elevation. It applies to A frame or load-bearing wall able to take the fixing, and a vertical reference line for the elevation., and it is not accepted if A leaning panel, a fixing without salt protection on the coast, a closed movement joint, or water entering at the head of the elevation with no way out. appears.

The check uses A plumb line, a fixing layout, a joint gauge, and a torque wrench where the fixing system requires it., and work stops when Fixing stops if the wind carries salt onto a bare anchor, or if metal has expanded in heat before a movement joint is left.. The measure is By the square metre of elevation cladding or stone, not by a paint metre and not by yard coordination., then care stays as follows: Resetting a loose fixing and opening a movement joint that was blocked by mistake during the defects period, and washing salt off the stone with fresh water.. Paint on its own is refused, the exterior coordination page is refused, and internal wall plaster and interlock are refused.

A bare fixing in Jeddah

In Facades, “A bare fixing in Jeddah” means Rust runs on the stone after a humid season. It applies to A frame or load-bearing wall able to take the fixing, and a vertical reference line for the elevation., and it is not accepted if A leaning panel, a fixing without salt protection on the coast, a closed movement joint, or water entering at the head of the elevation with no way out. appears.

The check uses A plumb line, a fixing layout, a joint gauge, and a torque wrench where the fixing system requires it., and work stops when Fixing stops if the wind carries salt onto a bare anchor, or if metal has expanded in heat before a movement joint is left.. The measure is By the square metre of elevation cladding or stone, not by a paint metre and not by yard coordination., then care stays as follows: Resetting a loose fixing and opening a movement joint that was blocked by mistake during the defects period, and washing salt off the stone with fresh water.. Paint on its own is refused, the exterior coordination page is refused, and internal wall plaster and interlock are refused.

Packing the joint with cement

In Facades, “Packing the joint with cement” means Heat pushes the panel, so the edge breaks or the fixing bends. It applies to A frame or load-bearing wall able to take the fixing, and a vertical reference line for the elevation., and it is not accepted if A leaning panel, a fixing without salt protection on the coast, a closed movement joint, or water entering at the head of the elevation with no way out. appears.

The check uses A plumb line, a fixing layout, a joint gauge, and a torque wrench where the fixing system requires it., and work stops when Fixing stops if the wind carries salt onto a bare anchor, or if metal has expanded in heat before a movement joint is left.. The measure is By the square metre of elevation cladding or stone, not by a paint metre and not by yard coordination., then care stays as follows: Resetting a loose fixing and opening a movement joint that was blocked by mistake during the defects period, and washing salt off the stone with fresh water.. Paint on its own is refused, the exterior coordination page is refused, and internal wall plaster and interlock are refused.

Blocking the cavity

In Facades, “Blocking the cavity” means Water is trapped behind the stone and then shows as a stain at the bottom. It applies to A frame or load-bearing wall able to take the fixing, and a vertical reference line for the elevation., and it is not accepted if A leaning panel, a fixing without salt protection on the coast, a closed movement joint, or water entering at the head of the elevation with no way out. appears.

The check uses A plumb line, a fixing layout, a joint gauge, and a torque wrench where the fixing system requires it., and work stops when Fixing stops if the wind carries salt onto a bare anchor, or if metal has expanded in heat before a movement joint is left.. The measure is By the square metre of elevation cladding or stone, not by a paint metre and not by yard coordination., then care stays as follows: Resetting a loose fixing and opening a movement joint that was blocked by mistake during the defects period, and washing salt off the stone with fresh water.. Paint on its own is refused, the exterior coordination page is refused, and internal wall plaster and interlock are refused.

A different plumb on every floor

In Facades, “A different plumb on every floor” means The elevation breaks visually at the slab. It applies to A frame or load-bearing wall able to take the fixing, and a vertical reference line for the elevation., and it is not accepted if A leaning panel, a fixing without salt protection on the coast, a closed movement joint, or water entering at the head of the elevation with no way out. appears.

The check uses A plumb line, a fixing layout, a joint gauge, and a torque wrench where the fixing system requires it., and work stops when Fixing stops if the wind carries salt onto a bare anchor, or if metal has expanded in heat before a movement joint is left.. The measure is By the square metre of elevation cladding or stone, not by a paint metre and not by yard coordination., then care stays as follows: Resetting a loose fixing and opening a movement joint that was blocked by mistake during the defects period, and washing salt off the stone with fresh water.. Paint on its own is refused, the exterior coordination page is refused, and internal wall plaster and interlock are refused.

Turning the page into an external schedule

In Facades, “Turning the page into an external schedule” means The yard, the entrance and the sidewalk have their own pages, and coordination belongs to exterior finishing. It applies to A frame or load-bearing wall able to take the fixing, and a vertical reference line for the elevation., and it is not accepted if A leaning panel, a fixing without salt protection on the coast, a closed movement joint, or water entering at the head of the elevation with no way out. appears.

The check uses A plumb line, a fixing layout, a joint gauge, and a torque wrench where the fixing system requires it., and work stops when Fixing stops if the wind carries salt onto a bare anchor, or if metal has expanded in heat before a movement joint is left.. The measure is By the square metre of elevation cladding or stone, not by a paint metre and not by yard coordination., then care stays as follows: Resetting a loose fixing and opening a movement joint that was blocked by mistake during the defects period, and washing salt off the stone with fresh water.. Paint on its own is refused, the exterior coordination page is refused, and internal wall plaster and interlock are refused.

What affects the price of facades

The price of Facades is set after the survey, because it changes with the city, access, the surface and the season. The factors below show what raises or lowers the cost.

Mechanical or adhesive fixing

In Facades, “Mechanical or adhesive fixing” means Anchors and drilling differ from sticking a light panel, and that is a method difference, not a published price. It applies to A frame or load-bearing wall able to take the fixing, and a vertical reference line for the elevation., and it is not accepted if A leaning panel, a fixing without salt protection on the coast, a closed movement joint, or water entering at the head of the elevation with no way out. appears.

The check uses A plumb line, a fixing layout, a joint gauge, and a torque wrench where the fixing system requires it., and work stops when Fixing stops if the wind carries salt onto a bare anchor, or if metal has expanded in heat before a movement joint is left.. The measure is By the square metre of elevation cladding or stone, not by a paint metre and not by yard coordination., then care stays as follows: Resetting a loose fixing and opening a movement joint that was blocked by mistake during the defects period, and washing salt off the stone with fresh water.. Paint on its own is refused, the exterior coordination page is refused, and internal wall plaster and interlock are refused.

Height of the elevation

In Facades, “Height of the elevation” means Safe access lengthens the time per course, not the definition of the stone. It applies to A frame or load-bearing wall able to take the fixing, and a vertical reference line for the elevation., and it is not accepted if A leaning panel, a fixing without salt protection on the coast, a closed movement joint, or water entering at the head of the elevation with no way out. appears.

The check uses A plumb line, a fixing layout, a joint gauge, and a torque wrench where the fixing system requires it., and work stops when Fixing stops if the wind carries salt onto a bare anchor, or if metal has expanded in heat before a movement joint is left.. The measure is By the square metre of elevation cladding or stone, not by a paint metre and not by yard coordination., then care stays as follows: Resetting a loose fixing and opening a movement joint that was blocked by mistake during the defects period, and washing salt off the stone with fresh water.. Paint on its own is refused, the exterior coordination page is refused, and internal wall plaster and interlock are refused.

Salt protection

In Facades, “Salt protection” means Suitable metal and isolation on the coast add a step before closing. It applies to A frame or load-bearing wall able to take the fixing, and a vertical reference line for the elevation., and it is not accepted if A leaning panel, a fixing without salt protection on the coast, a closed movement joint, or water entering at the head of the elevation with no way out. appears.

The check uses A plumb line, a fixing layout, a joint gauge, and a torque wrench where the fixing system requires it., and work stops when Fixing stops if the wind carries salt onto a bare anchor, or if metal has expanded in heat before a movement joint is left.. The measure is By the square metre of elevation cladding or stone, not by a paint metre and not by yard coordination., then care stays as follows: Resetting a loose fixing and opening a movement joint that was blocked by mistake during the defects period, and washing salt off the stone with fresh water.. Paint on its own is refused, the exterior coordination page is refused, and internal wall plaster and interlock are refused.

Number of openings and returns

In Facades, “Number of openings and returns” means Each window is an extra edge and a cut. It applies to A frame or load-bearing wall able to take the fixing, and a vertical reference line for the elevation., and it is not accepted if A leaning panel, a fixing without salt protection on the coast, a closed movement joint, or water entering at the head of the elevation with no way out. appears.

The check uses A plumb line, a fixing layout, a joint gauge, and a torque wrench where the fixing system requires it., and work stops when Fixing stops if the wind carries salt onto a bare anchor, or if metal has expanded in heat before a movement joint is left.. The measure is By the square metre of elevation cladding or stone, not by a paint metre and not by yard coordination., then care stays as follows: Resetting a loose fixing and opening a movement joint that was blocked by mistake during the defects period, and washing salt off the stone with fresh water.. Paint on its own is refused, the exterior coordination page is refused, and internal wall plaster and interlock are refused.

Checking the joint in heat

In Facades, “Checking the joint in heat” means A midday review in summer may reset the joint width. It applies to A frame or load-bearing wall able to take the fixing, and a vertical reference line for the elevation., and it is not accepted if A leaning panel, a fixing without salt protection on the coast, a closed movement joint, or water entering at the head of the elevation with no way out. appears.

The check uses A plumb line, a fixing layout, a joint gauge, and a torque wrench where the fixing system requires it., and work stops when Fixing stops if the wind carries salt onto a bare anchor, or if metal has expanded in heat before a movement joint is left.. The measure is By the square metre of elevation cladding or stone, not by a paint metre and not by yard coordination., then care stays as follows: Resetting a loose fixing and opening a movement joint that was blocked by mistake during the defects period, and washing salt off the stone with fresh water.. Paint on its own is refused, the exterior coordination page is refused, and internal wall plaster and interlock are refused.

Keeping paint out of the measure

In Facades, “Keeping paint out of the measure” means A colour coat, if requested, is measured on its own page so it does not dissolve into the cladding metre. It applies to A frame or load-bearing wall able to take the fixing, and a vertical reference line for the elevation., and it is not accepted if A leaning panel, a fixing without salt protection on the coast, a closed movement joint, or water entering at the head of the elevation with no way out. appears.

The check uses A plumb line, a fixing layout, a joint gauge, and a torque wrench where the fixing system requires it., and work stops when Fixing stops if the wind carries salt onto a bare anchor, or if metal has expanded in heat before a movement joint is left.. The measure is By the square metre of elevation cladding or stone, not by a paint metre and not by yard coordination., then care stays as follows: Resetting a loose fixing and opening a movement joint that was blocked by mistake during the defects period, and washing salt off the stone with fresh water.. Paint on its own is refused, the exterior coordination page is refused, and internal wall plaster and interlock are refused.

Handover of facades

One plumb for the elevation

In Facades, “One plumb for the elevation” means The line does not drift between top and bottom. It applies to A frame or load-bearing wall able to take the fixing, and a vertical reference line for the elevation., and it is not accepted if A leaning panel, a fixing without salt protection on the coast, a closed movement joint, or water entering at the head of the elevation with no way out. appears.

The check uses A plumb line, a fixing layout, a joint gauge, and a torque wrench where the fixing system requires it., and work stops when Fixing stops if the wind carries salt onto a bare anchor, or if metal has expanded in heat before a movement joint is left.. The measure is By the square metre of elevation cladding or stone, not by a paint metre and not by yard coordination., then care stays as follows: Resetting a loose fixing and opening a movement joint that was blocked by mistake during the defects period, and washing salt off the stone with fresh water.. Paint on its own is refused, the exterior coordination page is refused, and internal wall plaster and interlock are refused.

The fixing is in a supporting member

In Facades, “The fixing is in a supporting member” means The panel does not rely on a plaster coat as its support. It applies to A frame or load-bearing wall able to take the fixing, and a vertical reference line for the elevation., and it is not accepted if A leaning panel, a fixing without salt protection on the coast, a closed movement joint, or water entering at the head of the elevation with no way out. appears.

The check uses A plumb line, a fixing layout, a joint gauge, and a torque wrench where the fixing system requires it., and work stops when Fixing stops if the wind carries salt onto a bare anchor, or if metal has expanded in heat before a movement joint is left.. The measure is By the square metre of elevation cladding or stone, not by a paint metre and not by yard coordination., then care stays as follows: Resetting a loose fixing and opening a movement joint that was blocked by mistake during the defects period, and washing salt off the stone with fresh water.. Paint on its own is refused, the exterior coordination page is refused, and internal wall plaster and interlock are refused.

The movement joint is open and flexible

In Facades, “The movement joint is open and flexible” means Its width is visible and its material is not hard mortar. It applies to A frame or load-bearing wall able to take the fixing, and a vertical reference line for the elevation., and it is not accepted if A leaning panel, a fixing without salt protection on the coast, a closed movement joint, or water entering at the head of the elevation with no way out. appears.

The check uses A plumb line, a fixing layout, a joint gauge, and a torque wrench where the fixing system requires it., and work stops when Fixing stops if the wind carries salt onto a bare anchor, or if metal has expanded in heat before a movement joint is left.. The measure is By the square metre of elevation cladding or stone, not by a paint metre and not by yard coordination., then care stays as follows: Resetting a loose fixing and opening a movement joint that was blocked by mistake during the defects period, and washing salt off the stone with fresh water.. Paint on its own is refused, the exterior coordination page is refused, and internal wall plaster and interlock are refused.

The bottom of the cavity drains

In Facades, “The bottom of the cavity drains” means Test water does not stay behind the first course. It applies to A frame or load-bearing wall able to take the fixing, and a vertical reference line for the elevation., and it is not accepted if A leaning panel, a fixing without salt protection on the coast, a closed movement joint, or water entering at the head of the elevation with no way out. appears.

The check uses A plumb line, a fixing layout, a joint gauge, and a torque wrench where the fixing system requires it., and work stops when Fixing stops if the wind carries salt onto a bare anchor, or if metal has expanded in heat before a movement joint is left.. The measure is By the square metre of elevation cladding or stone, not by a paint metre and not by yard coordination., then care stays as follows: Resetting a loose fixing and opening a movement joint that was blocked by mistake during the defects period, and washing salt off the stone with fresh water.. Paint on its own is refused, the exterior coordination page is refused, and internal wall plaster and interlock are refused.

No visible rust on the coast

In Facades, “No visible rust on the coast” means The fixing tip is checked after installation and before the final wash. It applies to A frame or load-bearing wall able to take the fixing, and a vertical reference line for the elevation., and it is not accepted if A leaning panel, a fixing without salt protection on the coast, a closed movement joint, or water entering at the head of the elevation with no way out. appears.

The check uses A plumb line, a fixing layout, a joint gauge, and a torque wrench where the fixing system requires it., and work stops when Fixing stops if the wind carries salt onto a bare anchor, or if metal has expanded in heat before a movement joint is left.. The measure is By the square metre of elevation cladding or stone, not by a paint metre and not by yard coordination., then care stays as follows: Resetting a loose fixing and opening a movement joint that was blocked by mistake during the defects period, and washing salt off the stone with fresh water.. Paint on its own is refused, the exterior coordination page is refused, and internal wall plaster and interlock are refused.

The minute is not an exterior coordination schedule

In Facades, “The minute is not an exterior coordination schedule” means The entrance, the yard and the sidewalk are absent from the facade sheet. It applies to A frame or load-bearing wall able to take the fixing, and a vertical reference line for the elevation., and it is not accepted if A leaning panel, a fixing without salt protection on the coast, a closed movement joint, or water entering at the head of the elevation with no way out. appears.

The check uses A plumb line, a fixing layout, a joint gauge, and a torque wrench where the fixing system requires it., and work stops when Fixing stops if the wind carries salt onto a bare anchor, or if metal has expanded in heat before a movement joint is left.. The measure is By the square metre of elevation cladding or stone, not by a paint metre and not by yard coordination., then care stays as follows: Resetting a loose fixing and opening a movement joint that was blocked by mistake during the defects period, and washing salt off the stone with fresh water.. Paint on its own is refused, the exterior coordination page is refused, and internal wall plaster and interlock are refused.

Our work

Photos of the kind of work. The details of this service are above and below.

Entrance maintenance and renovation
Entrance maintenance and renovation
Courtyard maintenance and renovation
Courtyard maintenance and renovation
Outdoor floor renewal
Outdoor floor renewal
School yard development
School yard development
Gardens and facilities
Gardens and facilities
Path landscaping
Path landscaping
Parking yard renewal
Parking yard renewal
Sports field preparation
Sports field preparation

After facades is handed over

Resetting a loose fixing and opening a movement joint that was blocked by mistake during the defects period, and washing salt off the stone with fresh water. This detail belongs only to Facades and is not pasted onto another trade. The surface in question is A frame or load-bearing wall able to take the fixing, and a vertical reference line for the elevation., and the exclusion is explicit: Paint on its own is refused, the exterior coordination page is refused, and internal wall plaster and interlock are refused..

After handover movement joints are not packed with hard mortar, and salt dust is washed off the stone without a random acid. This detail belongs only to Facades and is not pasted onto another trade. The surface in question is A frame or load-bearing wall able to take the fixing, and a vertical reference line for the elevation., and the exclusion is explicit: Paint on its own is refused, the exterior coordination page is refused, and internal wall plaster and interlock are refused..

Inland summer expands metal, so the joint is checked at midday. Jeddah salt requires a protected fixing and a stone wash after humid wind. This detail belongs only to Facades and is not pasted onto another trade. The surface in question is A frame or load-bearing wall able to take the fixing, and a vertical reference line for the elevation., and the exclusion is explicit: Paint on its own is refused, the exterior coordination page is refused, and internal wall plaster and interlock are refused..

If A leaning panel, a fixing without salt protection on the coast, a closed movement joint, or water entering at the head of the elevation with no way out. appears, this trade is reopened on the same surface. Work stops when Fixing stops if the wind carries salt onto a bare anchor, or if metal has expanded in heat before a movement joint is left.. Inspection uses A plumb line, a fixing layout, a joint gauge, and a torque wrench where the fixing system requires it., and the agreed measure is By the square metre of elevation cladding or stone, not by a paint metre and not by yard coordination.. After handover, care stays within Resetting a loose fixing and opening a movement joint that was blocked by mistake during the defects period, and washing salt off the stone with fresh water..

Facades across Saudi regions

How Facades is carried out changes from one region to another with the climate and the access. Districts and the road from Jeddah are on the city page. The link in each region opens it.

Facades in the Riyadh Region

The effect of the Riyadh Region on Facades comes from this constraint: high daytime heat, dust, and a wide gap between afternoon and night temperatures. On A frame or load-bearing wall able to take the fixing, and a vertical reference line for the elevation. that means delaying work if the constraint meets this limit: Fixing stops if the wind carries salt onto a bare anchor, or if metal has expanded in heat before a movement joint is left.. The defect looked for here is A leaning panel, a fixing without salt protection on the coast, a closed movement joint, or water entering at the head of the elevation with no way out., and the measure is By the square metre of elevation cladding or stone, not by a paint metre and not by yard coordination.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Riyadh Region page and on its capital page.

Facades in the Makkah Region

The effect of the Makkah Region on Facades comes from this constraint: a hot humid coast in Jeddah and Rabigh, and rock and slopes in Makkah and Taif. On A frame or load-bearing wall able to take the fixing, and a vertical reference line for the elevation. that means delaying work if the constraint meets this limit: Fixing stops if the wind carries salt onto a bare anchor, or if metal has expanded in heat before a movement joint is left.. The defect looked for here is A leaning panel, a fixing without salt protection on the coast, a closed movement joint, or water entering at the head of the elevation with no way out., and the measure is By the square metre of elevation cladding or stone, not by a paint metre and not by yard coordination.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Makkah Region page and on its capital page.

Facades in the Madinah Region

The effect of the Madinah Region on Facades comes from this constraint: dry heat, volcanic harra around places such as Khaybar, and an industrial coast at Yanbu. On A frame or load-bearing wall able to take the fixing, and a vertical reference line for the elevation. that means delaying work if the constraint meets this limit: Fixing stops if the wind carries salt onto a bare anchor, or if metal has expanded in heat before a movement joint is left.. The defect looked for here is A leaning panel, a fixing without salt protection on the coast, a closed movement joint, or water entering at the head of the elevation with no way out., and the measure is By the square metre of elevation cladding or stone, not by a paint metre and not by yard coordination.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Madinah Region page and on its capital page.

Facades in the Qassim Region

The effect of the Qassim Region on Facades comes from this constraint: a dry Najd climate, dust, and agricultural and trading activity around Buraidah and Unaizah. On A frame or load-bearing wall able to take the fixing, and a vertical reference line for the elevation. that means delaying work if the constraint meets this limit: Fixing stops if the wind carries salt onto a bare anchor, or if metal has expanded in heat before a movement joint is left.. The defect looked for here is A leaning panel, a fixing without salt protection on the coast, a closed movement joint, or water entering at the head of the elevation with no way out., and the measure is By the square metre of elevation cladding or stone, not by a paint metre and not by yard coordination.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Qassim Region page and on its capital page.

Facades in the Eastern Province

The effect of the Eastern Province on Facades comes from this constraint: Gulf humidity, sabkha and groundwater on the coast, and high heat inland at Hafar Al Batin. On A frame or load-bearing wall able to take the fixing, and a vertical reference line for the elevation. that means delaying work if the constraint meets this limit: Fixing stops if the wind carries salt onto a bare anchor, or if metal has expanded in heat before a movement joint is left.. The defect looked for here is A leaning panel, a fixing without salt protection on the coast, a closed movement joint, or water entering at the head of the elevation with no way out., and the measure is By the square metre of elevation cladding or stone, not by a paint metre and not by yard coordination.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Eastern Province page and on its capital page.

Facades in the Asir Region

The effect of the Asir Region on Facades comes from this constraint: rainy foggy highlands around Abha, and stronger heat in Bisha and Tathlith. On A frame or load-bearing wall able to take the fixing, and a vertical reference line for the elevation. that means delaying work if the constraint meets this limit: Fixing stops if the wind carries salt onto a bare anchor, or if metal has expanded in heat before a movement joint is left.. The defect looked for here is A leaning panel, a fixing without salt protection on the coast, a closed movement joint, or water entering at the head of the elevation with no way out., and the measure is By the square metre of elevation cladding or stone, not by a paint metre and not by yard coordination.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Asir Region page and on its capital page.

Facades in the Tabuk Region

The effect of the Tabuk Region on Facades comes from this constraint: hot summers, cold nights in winter, wind, and a Red Sea coast at Al Wajh, Duba and Umluj. On A frame or load-bearing wall able to take the fixing, and a vertical reference line for the elevation. that means delaying work if the constraint meets this limit: Fixing stops if the wind carries salt onto a bare anchor, or if metal has expanded in heat before a movement joint is left.. The defect looked for here is A leaning panel, a fixing without salt protection on the coast, a closed movement joint, or water entering at the head of the elevation with no way out., and the measure is By the square metre of elevation cladding or stone, not by a paint metre and not by yard coordination.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Tabuk Region page and on its capital page.

Facades in the Hail Region

The effect of the Hail Region on Facades comes from this constraint: a dry northern climate, cold nights, and dust on open roads. On A frame or load-bearing wall able to take the fixing, and a vertical reference line for the elevation. that means delaying work if the constraint meets this limit: Fixing stops if the wind carries salt onto a bare anchor, or if metal has expanded in heat before a movement joint is left.. The defect looked for here is A leaning panel, a fixing without salt protection on the coast, a closed movement joint, or water entering at the head of the elevation with no way out., and the measure is By the square metre of elevation cladding or stone, not by a paint metre and not by yard coordination.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Hail Region page and on its capital page.

Facades in the Northern Borders Region

The effect of the Northern Borders Region on Facades comes from this constraint: geographic distance, a cold winter, and wind in small border cities. On A frame or load-bearing wall able to take the fixing, and a vertical reference line for the elevation. that means delaying work if the constraint meets this limit: Fixing stops if the wind carries salt onto a bare anchor, or if metal has expanded in heat before a movement joint is left.. The defect looked for here is A leaning panel, a fixing without salt protection on the coast, a closed movement joint, or water entering at the head of the elevation with no way out., and the measure is By the square metre of elevation cladding or stone, not by a paint metre and not by yard coordination.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Northern Borders Region page and on its capital page.

Facades in the Jazan Region

The effect of the Jazan Region on Facades comes from this constraint: humid Tihama heat, seasonal rain and wadis, and the island constraint of Farasan. On A frame or load-bearing wall able to take the fixing, and a vertical reference line for the elevation. that means delaying work if the constraint meets this limit: Fixing stops if the wind carries salt onto a bare anchor, or if metal has expanded in heat before a movement joint is left.. The defect looked for here is A leaning panel, a fixing without salt protection on the coast, a closed movement joint, or water entering at the head of the elevation with no way out., and the measure is By the square metre of elevation cladding or stone, not by a paint metre and not by yard coordination.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Jazan Region page and on its capital page.

Facades in the Najran Region

The effect of the Najran Region on Facades comes from this constraint: a valley between highlands, heat, and a distance from Jeddah that shows up in supply. On A frame or load-bearing wall able to take the fixing, and a vertical reference line for the elevation. that means delaying work if the constraint meets this limit: Fixing stops if the wind carries salt onto a bare anchor, or if metal has expanded in heat before a movement joint is left.. The defect looked for here is A leaning panel, a fixing without salt protection on the coast, a closed movement joint, or water entering at the head of the elevation with no way out., and the measure is By the square metre of elevation cladding or stone, not by a paint metre and not by yard coordination.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Najran Region page and on its capital page.

Facades in the Al Bahah Region

The effect of the Al Bahah Region on Facades comes from this constraint: highlands, fog, rain, and short mountain roads between towns. On A frame or load-bearing wall able to take the fixing, and a vertical reference line for the elevation. that means delaying work if the constraint meets this limit: Fixing stops if the wind carries salt onto a bare anchor, or if metal has expanded in heat before a movement joint is left.. The defect looked for here is A leaning panel, a fixing without salt protection on the coast, a closed movement joint, or water entering at the head of the elevation with no way out., and the measure is By the square metre of elevation cladding or stone, not by a paint metre and not by yard coordination.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Al Bahah Region page and on its capital page.

Facades in the Al Jawf Region

The effect of the Al Jawf Region on Facades comes from this constraint: an agricultural north, cold winters, and a long distance from Jeddah. On A frame or load-bearing wall able to take the fixing, and a vertical reference line for the elevation. that means delaying work if the constraint meets this limit: Fixing stops if the wind carries salt onto a bare anchor, or if metal has expanded in heat before a movement joint is left.. The defect looked for here is A leaning panel, a fixing without salt protection on the coast, a closed movement joint, or water entering at the head of the elevation with no way out., and the measure is By the square metre of elevation cladding or stone, not by a paint metre and not by yard coordination.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Al Jawf Region page and on its capital page.

A site example of facades

An entrance elevation in mechanically fixed stone: the plumb is set, fixings are spaced, and a joint is left at the edge of each panel. Paint-only work and the yard are not in the example. This detail belongs only to Facades and is not pasted onto another trade. The surface in question is A frame or load-bearing wall able to take the fixing, and a vertical reference line for the elevation., and the exclusion is explicit: Paint on its own is refused, the exterior coordination page is refused, and internal wall plaster and interlock are refused..

The example is illustrative, without a price and without a claim that a named elevation was handed over on a finished project. This detail belongs only to Facades and is not pasted onto another trade. The surface in question is A frame or load-bearing wall able to take the fixing, and a vertical reference line for the elevation., and the exclusion is explicit: Paint on its own is refused, the exterior coordination page is refused, and internal wall plaster and interlock are refused..

If A leaning panel, a fixing without salt protection on the coast, a closed movement joint, or water entering at the head of the elevation with no way out. appears, this trade is reopened on the same surface. Work stops when Fixing stops if the wind carries salt onto a bare anchor, or if metal has expanded in heat before a movement joint is left.. Inspection uses A plumb line, a fixing layout, a joint gauge, and a torque wrench where the fixing system requires it., and the agreed measure is By the square metre of elevation cladding or stone, not by a paint metre and not by yard coordination.. After handover, care stays within Resetting a loose fixing and opening a movement joint that was blocked by mistake during the defects period, and washing salt off the stone with fresh water..

The example shows how to think before a survey. It is not a contract and not an approved quantity. Any area the client states is checked on site because By the square metre of elevation cladding or stone, not by a paint metre and not by yard coordination. may change after openings, slopes, or zones this trade does not cover are deducted.

What facades does not include

The work closest to Facades is Exterior finishing. Exterior finishing is a coordination page for works outside the building, while this page builds only the elevation cladding and stone system, and refuses to become paint-only work or a schedule of yards and entrances. This page explains Facades only.

If the project needs both, each one is listed in the quotation with its own quantity. Start at Exterior finishing if that is the request, or continue here if the request is Facades.

The elevation is handed over with the as-fixed anchor layout, the movement-joint width, and a text that sets paint-only work and exterior coordination aside. This detail belongs only to Facades and is not pasted onto another trade. The surface in question is A frame or load-bearing wall able to take the fixing, and a vertical reference line for the elevation., and the exclusion is explicit: Paint on its own is refused, the exterior coordination page is refused, and internal wall plaster and interlock are refused..

If A leaning panel, a fixing without salt protection on the coast, a closed movement joint, or water entering at the head of the elevation with no way out. appears, this trade is reopened on the same surface. Work stops when Fixing stops if the wind carries salt onto a bare anchor, or if metal has expanded in heat before a movement joint is left.. Inspection uses A plumb line, a fixing layout, a joint gauge, and a torque wrench where the fixing system requires it., and the agreed measure is By the square metre of elevation cladding or stone, not by a paint metre and not by yard coordination.. After handover, care stays within Resetting a loose fixing and opening a movement joint that was blocked by mistake during the defects period, and washing salt off the stone with fresh water..

Common questions about facades

This page is for stone and cladding facade systems and the elevation finish, not for paint only and not for coordinating external works. If the request is a colour coat on external plaster with no cladding, the page is painting.
It is requested when the elevation system, its fixings and its movement joints are defined before the facade is closed. It is not a substitute for the exterior-finishing page that arranges several works outside the building, nor for a sidewalk or a vehicle entrance.
Materials used for Facades include: Facade stone of approved thickness, Salt-protected fixing, Secondary frame for panels, Set movement joint, Head flashing. Thickness and the back face match the fixing system so a thin panel is not pierced by an anchor it was not made for.
Facades follows this order: Set the plumb reference, Set out the fixings, Protect the coastal fixing, Set the first course to level, Keep the cavity behind the cladding. Skipping a step shows up at handover.
Mistakes we refuse in Facades: Painting the elevation instead of cladding it, A bare fixing in Jeddah, Packing the joint with cement, Blocking the cavity, A different plumb on every floor. That request belongs on the painting page, and mixing it here cancels the definition of the elevation.
The price of Facades is set after the survey. It changes with: Mechanical or adhesive fixing, Height of the elevation, Salt protection, Number of openings and returns, Checking the joint in heat. The measure is By the square metre of elevation cladding or stone, not by a paint metre and not by yard coordination.
At handover of Facades we check: One plumb for the elevation, The fixing is in a supporting member, The movement joint is open and flexible, The bottom of the cavity drains, No visible rust on the coast. The line does not drift between top and bottom.
Resetting a loose fixing and opening a movement joint that was blocked by mistake during the defects period, and washing salt off the stone with fresh water. After handover movement joints are not packed with hard mortar, and salt dust is washed off the stone without a random acid.
Inland summer expands metal, so the joint is checked at midday. Jeddah salt requires a protected fixing and a stone wash after humid wind. The visit date follows the city’s heat and the distance from the Jeddah office in Al Hamdaniyah.
An entrance elevation in mechanically fixed stone: the plumb is set, fixings are spaced, and a joint is left at the edge of each panel. Paint-only work and the yard are not in the example. The example is illustrative, without a price and without a claim that a named elevation was handed over on a finished project.
Paint on its own is refused, the exterior coordination page is refused, and internal wall plaster and interlock are refused. If the request is Exterior finishing, the details are on its page, because Exterior finishing is a coordination page for works outside the building, while this page builds only the elevation cladding and stone system, and refuses to become paint-only work or a schedule of yards and entrances.
No. Paint on its own is the painting page. This page is elevation cladding, stone and fixing systems.
Exterior finishing coordinates external works. Here only the facade system is built, and the yard, entrance and sidewalk are not explained.
Coastal air is salty. A bare fixing rusts behind the panel and stains the face, so protected metal or an isolator is required.
No. Metal and stone expand in heat. The joint stays for a flexible seal so the edge does not break.
The office is only in Al Hamdaniyah, Jeddah. An elevation survey in another city is scheduled from that office, with no claim of a branch.