Scope of maintenance

This page keeps existing work in service. If the element’s form must change or it must be rebuilt, the page is renovation. This detail belongs only to Maintenance and is not pasted onto another trade. The surface in question is An element already built and still in place: a drain, a joint, an existing coating, a gate, an irrigation line, or a surface in use., and the exclusion is explicit: The page refuses demolishing an element and rebuilding it. It refuses a new villa or a new building. It refuses to become a full renovation contract..

Maintenance does not open a villa on an empty plot and does not replace an existing system with a new one. It repairs what is still itself. This detail belongs only to Maintenance and is not pasted onto another trade. The surface in question is An element already built and still in place: a drain, a joint, an existing coating, a gate, an irrigation line, or a surface in use., and the exclusion is explicit: The page refuses demolishing an element and rebuilding it. It refuses a new villa or a new building. It refuses to become a full renovation contract..

If A blocked drain, a joint that has opened, a gate that rubs, or a dripper that has stopped, while the same element can still be repaired rather than fully replaced. appears, this trade is reopened on the same surface. Work stops when Heat opens existing joints, rain reveals a blocked drain, and coastal salt shows rust on metal that is already there. These are signs for a maintenance visit, not a demolition date.. Inspection uses A visual inspection, drain clearing, tightening a fixing, and a touch-up of paint or seal of the existing surface type., and the agreed measure is By the visit and by the existing element whose function is maintained, not by the metre of a new building and not by a demolish-and-rebuild item.. After handover, care stays within A cycle of visits for the same element: cleaning, tightening, a local touch-up, and a report if the defect leaves maintenance and becomes renovation..

The page refuses demolishing an element and rebuilding it. It refuses a new villa or a new building. It refuses to become a full renovation contract. If the project needs Renovation, the details are on the Renovation page. Renovation changes what exists or rehabilitates it, while maintenance keeps the same element in service by cleaning, tightening, and local touch-up, without rebuilding and without a new villa.

We carry out Maintenance in cities across Saudi Arabia. Season and access change from one city to another. Open your city from the region pages for the visit date, and stay here for how Maintenance itself is done.

When we carry out maintenance

An owner of existing work who wants a visit that keeps a drain, a joint, or a surface doing its job, not a project that changes the building. This detail belongs only to Maintenance and is not pasted onto another trade. The surface in question is An element already built and still in place: a drain, a joint, an existing coating, a gate, an irrigation line, or a surface in use., and the exclusion is explicit: The page refuses demolishing an element and rebuilding it. It refuses a new villa or a new building. It refuses to become a full renovation contract..

It is requested after handover, or on old work that still does its job and needs cleaning, tightening, or a touch-up. This detail belongs only to Maintenance and is not pasted onto another trade. The surface in question is An element already built and still in place: a drain, a joint, an existing coating, a gate, an irrigation line, or a surface in use., and the exclusion is explicit: The page refuses demolishing an element and rebuilding it. It refuses a new villa or a new building. It refuses to become a full renovation contract..

It is not requested when the element has failed down to its base, nor when the request is new construction. This detail belongs only to Maintenance and is not pasted onto another trade. The surface in question is An element already built and still in place: a drain, a joint, an existing coating, a gate, an irrigation line, or a surface in use., and the exclusion is explicit: The page refuses demolishing an element and rebuilding it. It refuses a new villa or a new building. It refuses to become a full renovation contract..

If A blocked drain, a joint that has opened, a gate that rubs, or a dripper that has stopped, while the same element can still be repaired rather than fully replaced. appears, this trade is reopened on the same surface. Work stops when Heat opens existing joints, rain reveals a blocked drain, and coastal salt shows rust on metal that is already there. These are signs for a maintenance visit, not a demolition date.. Inspection uses A visual inspection, drain clearing, tightening a fixing, and a touch-up of paint or seal of the existing surface type., and the agreed measure is By the visit and by the existing element whose function is maintained, not by the metre of a new building and not by a demolish-and-rebuild item.. After handover, care stays within A cycle of visits for the same element: cleaning, tightening, a local touch-up, and a report if the defect leaves maintenance and becomes renovation..

A request for Maintenance starts when the client names the city, the building and the limit of work. The office is in Jeddah, and visits in other cities are arranged by distance. This page explains the work itself.

Materials for maintenance

The materials of Maintenance are listed below. Each one has an acceptance rule. If the rule is missed, the batch is rejected before the work continues.

List of existing elements

In Maintenance, “List of existing elements” means Each line is something already there: a drain, a joint, a gate, a line, a surface. There is no line for new construction. It applies to An element already built and still in place: a drain, a joint, an existing coating, a gate, an irrigation line, or a surface in use., and it is not accepted if A blocked drain, a joint that has opened, a gate that rubs, or a dripper that has stopped, while the same element can still be repaired rather than fully replaced. appears.

The check uses A visual inspection, drain clearing, tightening a fixing, and a touch-up of paint or seal of the existing surface type., and work stops when Heat opens existing joints, rain reveals a blocked drain, and coastal salt shows rust on metal that is already there. These are signs for a maintenance visit, not a demolition date.. The measure is By the visit and by the existing element whose function is maintained, not by the metre of a new building and not by a demolish-and-rebuild item., then care stays as follows: A cycle of visits for the same element: cleaning, tightening, a local touch-up, and a report if the defect leaves maintenance and becomes renovation.. The page refuses demolishing an element and rebuilding it. It refuses a new villa or a new building. It refuses to become a full renovation contract.

Material of the same type

In Maintenance, “Material of the same type” means The touch-up uses a material that matches what is there, not a new finish system that changes the trade. It applies to An element already built and still in place: a drain, a joint, an existing coating, a gate, an irrigation line, or a surface in use., and it is not accepted if A blocked drain, a joint that has opened, a gate that rubs, or a dripper that has stopped, while the same element can still be repaired rather than fully replaced. appears.

The check uses A visual inspection, drain clearing, tightening a fixing, and a touch-up of paint or seal of the existing surface type., and work stops when Heat opens existing joints, rain reveals a blocked drain, and coastal salt shows rust on metal that is already there. These are signs for a maintenance visit, not a demolition date.. The measure is By the visit and by the existing element whose function is maintained, not by the metre of a new building and not by a demolish-and-rebuild item., then care stays as follows: A cycle of visits for the same element: cleaning, tightening, a local touch-up, and a report if the defect leaves maintenance and becomes renovation.. The page refuses demolishing an element and rebuilding it. It refuses a new villa or a new building. It refuses to become a full renovation contract.

Clearing and tightening tools

In Maintenance, “Clearing and tightening tools” means They restore the function without demolition. It applies to An element already built and still in place: a drain, a joint, an existing coating, a gate, an irrigation line, or a surface in use., and it is not accepted if A blocked drain, a joint that has opened, a gate that rubs, or a dripper that has stopped, while the same element can still be repaired rather than fully replaced. appears.

The check uses A visual inspection, drain clearing, tightening a fixing, and a touch-up of paint or seal of the existing surface type., and work stops when Heat opens existing joints, rain reveals a blocked drain, and coastal salt shows rust on metal that is already there. These are signs for a maintenance visit, not a demolition date.. The measure is By the visit and by the existing element whose function is maintained, not by the metre of a new building and not by a demolish-and-rebuild item., then care stays as follows: A cycle of visits for the same element: cleaning, tightening, a local touch-up, and a report if the defect leaves maintenance and becomes renovation.. The page refuses demolishing an element and rebuilding it. It refuses a new villa or a new building. It refuses to become a full renovation contract.

Visit record

In Maintenance, “Visit record” means It writes what was opened, what was cleaned, and what was deferred to renovation. It applies to An element already built and still in place: a drain, a joint, an existing coating, a gate, an irrigation line, or a surface in use., and it is not accepted if A blocked drain, a joint that has opened, a gate that rubs, or a dripper that has stopped, while the same element can still be repaired rather than fully replaced. appears.

The check uses A visual inspection, drain clearing, tightening a fixing, and a touch-up of paint or seal of the existing surface type., and work stops when Heat opens existing joints, rain reveals a blocked drain, and coastal salt shows rust on metal that is already there. These are signs for a maintenance visit, not a demolition date.. The measure is By the visit and by the existing element whose function is maintained, not by the metre of a new building and not by a demolish-and-rebuild item., then care stays as follows: A cycle of visits for the same element: cleaning, tightening, a local touch-up, and a report if the defect leaves maintenance and becomes renovation.. The page refuses demolishing an element and rebuilding it. It refuses a new villa or a new building. It refuses to become a full renovation contract.

Protection of existing surroundings

In Maintenance, “Protection of existing surroundings” means Local work does not break a sound surface beside it. It applies to An element already built and still in place: a drain, a joint, an existing coating, a gate, an irrigation line, or a surface in use., and it is not accepted if A blocked drain, a joint that has opened, a gate that rubs, or a dripper that has stopped, while the same element can still be repaired rather than fully replaced. appears.

The check uses A visual inspection, drain clearing, tightening a fixing, and a touch-up of paint or seal of the existing surface type., and work stops when Heat opens existing joints, rain reveals a blocked drain, and coastal salt shows rust on metal that is already there. These are signs for a maintenance visit, not a demolition date.. The measure is By the visit and by the existing element whose function is maintained, not by the metre of a new building and not by a demolish-and-rebuild item., then care stays as follows: A cycle of visits for the same element: cleaning, tightening, a local touch-up, and a report if the defect leaves maintenance and becomes renovation.. The page refuses demolishing an element and rebuilding it. It refuses a new villa or a new building. It refuses to become a full renovation contract.

A stop limit

In Maintenance, “A stop limit” means If the element needs breaking and rebuilding, maintenance stops and renovation opens. It applies to An element already built and still in place: a drain, a joint, an existing coating, a gate, an irrigation line, or a surface in use., and it is not accepted if A blocked drain, a joint that has opened, a gate that rubs, or a dripper that has stopped, while the same element can still be repaired rather than fully replaced. appears.

The check uses A visual inspection, drain clearing, tightening a fixing, and a touch-up of paint or seal of the existing surface type., and work stops when Heat opens existing joints, rain reveals a blocked drain, and coastal salt shows rust on metal that is already there. These are signs for a maintenance visit, not a demolition date.. The measure is By the visit and by the existing element whose function is maintained, not by the metre of a new building and not by a demolish-and-rebuild item., then care stays as follows: A cycle of visits for the same element: cleaning, tightening, a local touch-up, and a report if the defect leaves maintenance and becomes renovation.. The page refuses demolishing an element and rebuilding it. It refuses a new villa or a new building. It refuses to become a full renovation contract.

Steps for maintenance

The order of steps in Maintenance protects the quality of the work. Skipping a step to finish faster shows up at handover.

List what exists, not what is new

In Maintenance, “List what exists, not what is new” means A request that starts from an empty plot is not maintenance. It applies to An element already built and still in place: a drain, a joint, an existing coating, a gate, an irrigation line, or a surface in use., and it is not accepted if A blocked drain, a joint that has opened, a gate that rubs, or a dripper that has stopped, while the same element can still be repaired rather than fully replaced. appears.

The check uses A visual inspection, drain clearing, tightening a fixing, and a touch-up of paint or seal of the existing surface type., and work stops when Heat opens existing joints, rain reveals a blocked drain, and coastal salt shows rust on metal that is already there. These are signs for a maintenance visit, not a demolition date.. The measure is By the visit and by the existing element whose function is maintained, not by the metre of a new building and not by a demolish-and-rebuild item., then care stays as follows: A cycle of visits for the same element: cleaning, tightening, a local touch-up, and a report if the defect leaves maintenance and becomes renovation.. The page refuses demolishing an element and rebuilding it. It refuses a new villa or a new building. It refuses to become a full renovation contract.

Inspection visit

In Maintenance, “Inspection visit” means Function is observed: whether water leaves, whether a joint is closed, whether a gate swings. It applies to An element already built and still in place: a drain, a joint, an existing coating, a gate, an irrigation line, or a surface in use., and it is not accepted if A blocked drain, a joint that has opened, a gate that rubs, or a dripper that has stopped, while the same element can still be repaired rather than fully replaced. appears.

The check uses A visual inspection, drain clearing, tightening a fixing, and a touch-up of paint or seal of the existing surface type., and work stops when Heat opens existing joints, rain reveals a blocked drain, and coastal salt shows rust on metal that is already there. These are signs for a maintenance visit, not a demolition date.. The measure is By the visit and by the existing element whose function is maintained, not by the metre of a new building and not by a demolish-and-rebuild item., then care stays as follows: A cycle of visits for the same element: cleaning, tightening, a local touch-up, and a report if the defect leaves maintenance and becomes renovation.. The page refuses demolishing an element and rebuilding it. It refuses a new villa or a new building. It refuses to become a full renovation contract.

Separate a local defect

In Maintenance, “Separate a local defect” means A blockage, looseness, or fading stays in maintenance. Collapse of the element leaves it. It applies to An element already built and still in place: a drain, a joint, an existing coating, a gate, an irrigation line, or a surface in use., and it is not accepted if A blocked drain, a joint that has opened, a gate that rubs, or a dripper that has stopped, while the same element can still be repaired rather than fully replaced. appears.

The check uses A visual inspection, drain clearing, tightening a fixing, and a touch-up of paint or seal of the existing surface type., and work stops when Heat opens existing joints, rain reveals a blocked drain, and coastal salt shows rust on metal that is already there. These are signs for a maintenance visit, not a demolition date.. The measure is By the visit and by the existing element whose function is maintained, not by the metre of a new building and not by a demolish-and-rebuild item., then care stays as follows: A cycle of visits for the same element: cleaning, tightening, a local touch-up, and a report if the defect leaves maintenance and becomes renovation.. The page refuses demolishing an element and rebuilding it. It refuses a new villa or a new building. It refuses to become a full renovation contract.

Clean and tighten

In Maintenance, “Clean and tighten” means The drain is cleared and the fixing is tightened, without replacing the whole network. It applies to An element already built and still in place: a drain, a joint, an existing coating, a gate, an irrigation line, or a surface in use., and it is not accepted if A blocked drain, a joint that has opened, a gate that rubs, or a dripper that has stopped, while the same element can still be repaired rather than fully replaced. appears.

The check uses A visual inspection, drain clearing, tightening a fixing, and a touch-up of paint or seal of the existing surface type., and work stops when Heat opens existing joints, rain reveals a blocked drain, and coastal salt shows rust on metal that is already there. These are signs for a maintenance visit, not a demolition date.. The measure is By the visit and by the existing element whose function is maintained, not by the metre of a new building and not by a demolish-and-rebuild item., then care stays as follows: A cycle of visits for the same element: cleaning, tightening, a local touch-up, and a report if the defect leaves maintenance and becomes renovation.. The page refuses demolishing an element and rebuilding it. It refuses a new villa or a new building. It refuses to become a full renovation contract.

Local touch-up

In Maintenance, “Local touch-up” means On the existing surface only, and with the same type. It applies to An element already built and still in place: a drain, a joint, an existing coating, a gate, an irrigation line, or a surface in use., and it is not accepted if A blocked drain, a joint that has opened, a gate that rubs, or a dripper that has stopped, while the same element can still be repaired rather than fully replaced. appears.

The check uses A visual inspection, drain clearing, tightening a fixing, and a touch-up of paint or seal of the existing surface type., and work stops when Heat opens existing joints, rain reveals a blocked drain, and coastal salt shows rust on metal that is already there. These are signs for a maintenance visit, not a demolition date.. The measure is By the visit and by the existing element whose function is maintained, not by the metre of a new building and not by a demolish-and-rebuild item., then care stays as follows: A cycle of visits for the same element: cleaning, tightening, a local touch-up, and a report if the defect leaves maintenance and becomes renovation.. The page refuses demolishing an element and rebuilding it. It refuses a new villa or a new building. It refuses to become a full renovation contract.

Test the function

In Maintenance, “Test the function” means Water in the drain, movement of the gate, a short run of the existing irrigation line. It applies to An element already built and still in place: a drain, a joint, an existing coating, a gate, an irrigation line, or a surface in use., and it is not accepted if A blocked drain, a joint that has opened, a gate that rubs, or a dripper that has stopped, while the same element can still be repaired rather than fully replaced. appears.

The check uses A visual inspection, drain clearing, tightening a fixing, and a touch-up of paint or seal of the existing surface type., and work stops when Heat opens existing joints, rain reveals a blocked drain, and coastal salt shows rust on metal that is already there. These are signs for a maintenance visit, not a demolition date.. The measure is By the visit and by the existing element whose function is maintained, not by the metre of a new building and not by a demolish-and-rebuild item., then care stays as follows: A cycle of visits for the same element: cleaning, tightening, a local touch-up, and a report if the defect leaves maintenance and becomes renovation.. The page refuses demolishing an element and rebuilding it. It refuses a new villa or a new building. It refuses to become a full renovation contract.

Write what was not repaired

In Maintenance, “Write what was not repaired” means A defect that needs renovation is named. It is not covered with paint. It applies to An element already built and still in place: a drain, a joint, an existing coating, a gate, an irrigation line, or a surface in use., and it is not accepted if A blocked drain, a joint that has opened, a gate that rubs, or a dripper that has stopped, while the same element can still be repaired rather than fully replaced. appears.

The check uses A visual inspection, drain clearing, tightening a fixing, and a touch-up of paint or seal of the existing surface type., and work stops when Heat opens existing joints, rain reveals a blocked drain, and coastal salt shows rust on metal that is already there. These are signs for a maintenance visit, not a demolition date.. The measure is By the visit and by the existing element whose function is maintained, not by the metre of a new building and not by a demolish-and-rebuild item., then care stays as follows: A cycle of visits for the same element: cleaning, tightening, a local touch-up, and a report if the defect leaves maintenance and becomes renovation.. The page refuses demolishing an element and rebuilding it. It refuses a new villa or a new building. It refuses to become a full renovation contract.

Close the visit

In Maintenance, “Close the visit” means The list is handed over. A new-villa quantity is not opened. It applies to An element already built and still in place: a drain, a joint, an existing coating, a gate, an irrigation line, or a surface in use., and it is not accepted if A blocked drain, a joint that has opened, a gate that rubs, or a dripper that has stopped, while the same element can still be repaired rather than fully replaced. appears.

The check uses A visual inspection, drain clearing, tightening a fixing, and a touch-up of paint or seal of the existing surface type., and work stops when Heat opens existing joints, rain reveals a blocked drain, and coastal salt shows rust on metal that is already there. These are signs for a maintenance visit, not a demolition date.. The measure is By the visit and by the existing element whose function is maintained, not by the metre of a new building and not by a demolish-and-rebuild item., then care stays as follows: A cycle of visits for the same element: cleaning, tightening, a local touch-up, and a report if the defect leaves maintenance and becomes renovation.. The page refuses demolishing an element and rebuilding it. It refuses a new villa or a new building. It refuses to become a full renovation contract.

Common mistakes in maintenance

Calling new construction maintenance

In Maintenance, “Calling new construction maintenance” means A villa on an empty plot is not upkeep of something existing. It applies to An element already built and still in place: a drain, a joint, an existing coating, a gate, an irrigation line, or a surface in use., and it is not accepted if A blocked drain, a joint that has opened, a gate that rubs, or a dripper that has stopped, while the same element can still be repaired rather than fully replaced. appears.

The check uses A visual inspection, drain clearing, tightening a fixing, and a touch-up of paint or seal of the existing surface type., and work stops when Heat opens existing joints, rain reveals a blocked drain, and coastal salt shows rust on metal that is already there. These are signs for a maintenance visit, not a demolition date.. The measure is By the visit and by the existing element whose function is maintained, not by the metre of a new building and not by a demolish-and-rebuild item., then care stays as follows: A cycle of visits for the same element: cleaning, tightening, a local touch-up, and a report if the defect leaves maintenance and becomes renovation.. The page refuses demolishing an element and rebuilding it. It refuses a new villa or a new building. It refuses to become a full renovation contract.

Demolishing the element inside a maintenance visit

In Maintenance, “Demolishing the element inside a maintenance visit” means That is renovation or rebuilding. It applies to An element already built and still in place: a drain, a joint, an existing coating, a gate, an irrigation line, or a surface in use., and it is not accepted if A blocked drain, a joint that has opened, a gate that rubs, or a dripper that has stopped, while the same element can still be repaired rather than fully replaced. appears.

The check uses A visual inspection, drain clearing, tightening a fixing, and a touch-up of paint or seal of the existing surface type., and work stops when Heat opens existing joints, rain reveals a blocked drain, and coastal salt shows rust on metal that is already there. These are signs for a maintenance visit, not a demolition date.. The measure is By the visit and by the existing element whose function is maintained, not by the metre of a new building and not by a demolish-and-rebuild item., then care stays as follows: A cycle of visits for the same element: cleaning, tightening, a local touch-up, and a report if the defect leaves maintenance and becomes renovation.. The page refuses demolishing an element and rebuilding it. It refuses a new villa or a new building. It refuses to become a full renovation contract.

Painting over a structural defect

In Maintenance, “Painting over a structural defect” means It hides what should be written for the renovation page. It applies to An element already built and still in place: a drain, a joint, an existing coating, a gate, an irrigation line, or a surface in use., and it is not accepted if A blocked drain, a joint that has opened, a gate that rubs, or a dripper that has stopped, while the same element can still be repaired rather than fully replaced. appears.

The check uses A visual inspection, drain clearing, tightening a fixing, and a touch-up of paint or seal of the existing surface type., and work stops when Heat opens existing joints, rain reveals a blocked drain, and coastal salt shows rust on metal that is already there. These are signs for a maintenance visit, not a demolition date.. The measure is By the visit and by the existing element whose function is maintained, not by the metre of a new building and not by a demolish-and-rebuild item., then care stays as follows: A cycle of visits for the same element: cleaning, tightening, a local touch-up, and a report if the defect leaves maintenance and becomes renovation.. The page refuses demolishing an element and rebuilding it. It refuses a new villa or a new building. It refuses to become a full renovation contract.

Replacing a whole system under the name of a touch-up

In Maintenance, “Replacing a whole system under the name of a touch-up” means It leaves the act of keeping the same type. It applies to An element already built and still in place: a drain, a joint, an existing coating, a gate, an irrigation line, or a surface in use., and it is not accepted if A blocked drain, a joint that has opened, a gate that rubs, or a dripper that has stopped, while the same element can still be repaired rather than fully replaced. appears.

The check uses A visual inspection, drain clearing, tightening a fixing, and a touch-up of paint or seal of the existing surface type., and work stops when Heat opens existing joints, rain reveals a blocked drain, and coastal salt shows rust on metal that is already there. These are signs for a maintenance visit, not a demolition date.. The measure is By the visit and by the existing element whose function is maintained, not by the metre of a new building and not by a demolish-and-rebuild item., then care stays as follows: A cycle of visits for the same element: cleaning, tightening, a local touch-up, and a report if the defect leaves maintenance and becomes renovation.. The page refuses demolishing an element and rebuilding it. It refuses a new villa or a new building. It refuses to become a full renovation contract.

A visit without a list

In Maintenance, “A visit without a list” means It is unclear what was maintained and what was left. It applies to An element already built and still in place: a drain, a joint, an existing coating, a gate, an irrigation line, or a surface in use., and it is not accepted if A blocked drain, a joint that has opened, a gate that rubs, or a dripper that has stopped, while the same element can still be repaired rather than fully replaced. appears.

The check uses A visual inspection, drain clearing, tightening a fixing, and a touch-up of paint or seal of the existing surface type., and work stops when Heat opens existing joints, rain reveals a blocked drain, and coastal salt shows rust on metal that is already there. These are signs for a maintenance visit, not a demolition date.. The measure is By the visit and by the existing element whose function is maintained, not by the metre of a new building and not by a demolish-and-rebuild item., then care stays as follows: A cycle of visits for the same element: cleaning, tightening, a local touch-up, and a report if the defect leaves maintenance and becomes renovation.. The page refuses demolishing an element and rebuilding it. It refuses a new villa or a new building. It refuses to become a full renovation contract.

Ignoring the heat and rain season

In Maintenance, “Ignoring the heat and rain season” means Joints and drains are reviewed after them, not only before. It applies to An element already built and still in place: a drain, a joint, an existing coating, a gate, an irrigation line, or a surface in use., and it is not accepted if A blocked drain, a joint that has opened, a gate that rubs, or a dripper that has stopped, while the same element can still be repaired rather than fully replaced. appears.

The check uses A visual inspection, drain clearing, tightening a fixing, and a touch-up of paint or seal of the existing surface type., and work stops when Heat opens existing joints, rain reveals a blocked drain, and coastal salt shows rust on metal that is already there. These are signs for a maintenance visit, not a demolition date.. The measure is By the visit and by the existing element whose function is maintained, not by the metre of a new building and not by a demolish-and-rebuild item., then care stays as follows: A cycle of visits for the same element: cleaning, tightening, a local touch-up, and a report if the defect leaves maintenance and becomes renovation.. The page refuses demolishing an element and rebuilding it. It refuses a new villa or a new building. It refuses to become a full renovation contract.

What affects the price of maintenance

The price of Maintenance is set after the survey, because it changes with the city, access, the surface and the season. The factors below show what raises or lowers the cost.

Number of elements on the visit

In Maintenance, “Number of elements on the visit” means Each extra drain or gate is inspection time. It applies to An element already built and still in place: a drain, a joint, an existing coating, a gate, an irrigation line, or a surface in use., and it is not accepted if A blocked drain, a joint that has opened, a gate that rubs, or a dripper that has stopped, while the same element can still be repaired rather than fully replaced. appears.

The check uses A visual inspection, drain clearing, tightening a fixing, and a touch-up of paint or seal of the existing surface type., and work stops when Heat opens existing joints, rain reveals a blocked drain, and coastal salt shows rust on metal that is already there. These are signs for a maintenance visit, not a demolition date.. The measure is By the visit and by the existing element whose function is maintained, not by the metre of a new building and not by a demolish-and-rebuild item., then care stays as follows: A cycle of visits for the same element: cleaning, tightening, a local touch-up, and a report if the defect leaves maintenance and becomes renovation.. The page refuses demolishing an element and rebuilding it. It refuses a new villa or a new building. It refuses to become a full renovation contract.

Ease of reaching what exists

In Maintenance, “Ease of reaching what exists” means A roof or a basement changes time, not the definition of maintenance. It applies to An element already built and still in place: a drain, a joint, an existing coating, a gate, an irrigation line, or a surface in use., and it is not accepted if A blocked drain, a joint that has opened, a gate that rubs, or a dripper that has stopped, while the same element can still be repaired rather than fully replaced. appears.

The check uses A visual inspection, drain clearing, tightening a fixing, and a touch-up of paint or seal of the existing surface type., and work stops when Heat opens existing joints, rain reveals a blocked drain, and coastal salt shows rust on metal that is already there. These are signs for a maintenance visit, not a demolition date.. The measure is By the visit and by the existing element whose function is maintained, not by the metre of a new building and not by a demolish-and-rebuild item., then care stays as follows: A cycle of visits for the same element: cleaning, tightening, a local touch-up, and a report if the defect leaves maintenance and becomes renovation.. The page refuses demolishing an element and rebuilding it. It refuses a new villa or a new building. It refuses to become a full renovation contract.

Seasonal repeat

In Maintenance, “Seasonal repeat” means A visit after heat and another after rain increase the count, not the size of the building. It applies to An element already built and still in place: a drain, a joint, an existing coating, a gate, an irrigation line, or a surface in use., and it is not accepted if A blocked drain, a joint that has opened, a gate that rubs, or a dripper that has stopped, while the same element can still be repaired rather than fully replaced. appears.

The check uses A visual inspection, drain clearing, tightening a fixing, and a touch-up of paint or seal of the existing surface type., and work stops when Heat opens existing joints, rain reveals a blocked drain, and coastal salt shows rust on metal that is already there. These are signs for a maintenance visit, not a demolition date.. The measure is By the visit and by the existing element whose function is maintained, not by the metre of a new building and not by a demolish-and-rebuild item., then care stays as follows: A cycle of visits for the same element: cleaning, tightening, a local touch-up, and a report if the defect leaves maintenance and becomes renovation.. The page refuses demolishing an element and rebuilding it. It refuses a new villa or a new building. It refuses to become a full renovation contract.

Salt on existing metal

In Maintenance, “Salt on existing metal” means Wiping and local protection on the coast are more than inland. It applies to An element already built and still in place: a drain, a joint, an existing coating, a gate, an irrigation line, or a surface in use., and it is not accepted if A blocked drain, a joint that has opened, a gate that rubs, or a dripper that has stopped, while the same element can still be repaired rather than fully replaced. appears.

The check uses A visual inspection, drain clearing, tightening a fixing, and a touch-up of paint or seal of the existing surface type., and work stops when Heat opens existing joints, rain reveals a blocked drain, and coastal salt shows rust on metal that is already there. These are signs for a maintenance visit, not a demolition date.. The measure is By the visit and by the existing element whose function is maintained, not by the metre of a new building and not by a demolish-and-rebuild item., then care stays as follows: A cycle of visits for the same element: cleaning, tightening, a local touch-up, and a report if the defect leaves maintenance and becomes renovation.. The page refuses demolishing an element and rebuilding it. It refuses a new villa or a new building. It refuses to become a full renovation contract.

Finding a defect outside maintenance

In Maintenance, “Finding a defect outside maintenance” means It stops the trade here and moves the failed part to renovation. It applies to An element already built and still in place: a drain, a joint, an existing coating, a gate, an irrigation line, or a surface in use., and it is not accepted if A blocked drain, a joint that has opened, a gate that rubs, or a dripper that has stopped, while the same element can still be repaired rather than fully replaced. appears.

The check uses A visual inspection, drain clearing, tightening a fixing, and a touch-up of paint or seal of the existing surface type., and work stops when Heat opens existing joints, rain reveals a blocked drain, and coastal salt shows rust on metal that is already there. These are signs for a maintenance visit, not a demolition date.. The measure is By the visit and by the existing element whose function is maintained, not by the metre of a new building and not by a demolish-and-rebuild item., then care stays as follows: A cycle of visits for the same element: cleaning, tightening, a local touch-up, and a report if the defect leaves maintenance and becomes renovation.. The page refuses demolishing an element and rebuilding it. It refuses a new villa or a new building. It refuses to become a full renovation contract.

Distance of the city from Jeddah

In Maintenance, “Distance of the city from Jeddah” means The visit leaves from the Al Hamdaniyah office with no assumed local branch. It applies to An element already built and still in place: a drain, a joint, an existing coating, a gate, an irrigation line, or a surface in use., and it is not accepted if A blocked drain, a joint that has opened, a gate that rubs, or a dripper that has stopped, while the same element can still be repaired rather than fully replaced. appears.

The check uses A visual inspection, drain clearing, tightening a fixing, and a touch-up of paint or seal of the existing surface type., and work stops when Heat opens existing joints, rain reveals a blocked drain, and coastal salt shows rust on metal that is already there. These are signs for a maintenance visit, not a demolition date.. The measure is By the visit and by the existing element whose function is maintained, not by the metre of a new building and not by a demolish-and-rebuild item., then care stays as follows: A cycle of visits for the same element: cleaning, tightening, a local touch-up, and a report if the defect leaves maintenance and becomes renovation.. The page refuses demolishing an element and rebuilding it. It refuses a new villa or a new building. It refuses to become a full renovation contract.

Handover of maintenance

Function returned

In Maintenance, “Function returned” means The drain drains, or the gate swings, or the dripper drips. It applies to An element already built and still in place: a drain, a joint, an existing coating, a gate, an irrigation line, or a surface in use., and it is not accepted if A blocked drain, a joint that has opened, a gate that rubs, or a dripper that has stopped, while the same element can still be repaired rather than fully replaced. appears.

The check uses A visual inspection, drain clearing, tightening a fixing, and a touch-up of paint or seal of the existing surface type., and work stops when Heat opens existing joints, rain reveals a blocked drain, and coastal salt shows rust on metal that is already there. These are signs for a maintenance visit, not a demolition date.. The measure is By the visit and by the existing element whose function is maintained, not by the metre of a new building and not by a demolish-and-rebuild item., then care stays as follows: A cycle of visits for the same element: cleaning, tightening, a local touch-up, and a report if the defect leaves maintenance and becomes renovation.. The page refuses demolishing an element and rebuilding it. It refuses a new villa or a new building. It refuses to become a full renovation contract.

The element is the same

In Maintenance, “The element is the same” means It was not replaced with a new system. It applies to An element already built and still in place: a drain, a joint, an existing coating, a gate, an irrigation line, or a surface in use., and it is not accepted if A blocked drain, a joint that has opened, a gate that rubs, or a dripper that has stopped, while the same element can still be repaired rather than fully replaced. appears.

The check uses A visual inspection, drain clearing, tightening a fixing, and a touch-up of paint or seal of the existing surface type., and work stops when Heat opens existing joints, rain reveals a blocked drain, and coastal salt shows rust on metal that is already there. These are signs for a maintenance visit, not a demolition date.. The measure is By the visit and by the existing element whose function is maintained, not by the metre of a new building and not by a demolish-and-rebuild item., then care stays as follows: A cycle of visits for the same element: cleaning, tightening, a local touch-up, and a report if the defect leaves maintenance and becomes renovation.. The page refuses demolishing an element and rebuilding it. It refuses a new villa or a new building. It refuses to become a full renovation contract.

Surroundings intact

In Maintenance, “Surroundings intact” means The touch-up did not break a neighboring surface. It applies to An element already built and still in place: a drain, a joint, an existing coating, a gate, an irrigation line, or a surface in use., and it is not accepted if A blocked drain, a joint that has opened, a gate that rubs, or a dripper that has stopped, while the same element can still be repaired rather than fully replaced. appears.

The check uses A visual inspection, drain clearing, tightening a fixing, and a touch-up of paint or seal of the existing surface type., and work stops when Heat opens existing joints, rain reveals a blocked drain, and coastal salt shows rust on metal that is already there. These are signs for a maintenance visit, not a demolition date.. The measure is By the visit and by the existing element whose function is maintained, not by the metre of a new building and not by a demolish-and-rebuild item., then care stays as follows: A cycle of visits for the same element: cleaning, tightening, a local touch-up, and a report if the defect leaves maintenance and becomes renovation.. The page refuses demolishing an element and rebuilding it. It refuses a new villa or a new building. It refuses to become a full renovation contract.

A written list

In Maintenance, “A written list” means What was done and what was not done is stated. It applies to An element already built and still in place: a drain, a joint, an existing coating, a gate, an irrigation line, or a surface in use., and it is not accepted if A blocked drain, a joint that has opened, a gate that rubs, or a dripper that has stopped, while the same element can still be repaired rather than fully replaced. appears.

The check uses A visual inspection, drain clearing, tightening a fixing, and a touch-up of paint or seal of the existing surface type., and work stops when Heat opens existing joints, rain reveals a blocked drain, and coastal salt shows rust on metal that is already there. These are signs for a maintenance visit, not a demolition date.. The measure is By the visit and by the existing element whose function is maintained, not by the metre of a new building and not by a demolish-and-rebuild item., then care stays as follows: A cycle of visits for the same element: cleaning, tightening, a local touch-up, and a report if the defect leaves maintenance and becomes renovation.. The page refuses demolishing an element and rebuilding it. It refuses a new villa or a new building. It refuses to become a full renovation contract.

No construction item

In Maintenance, “No construction item” means No metres of a new building are in the visit. It applies to An element already built and still in place: a drain, a joint, an existing coating, a gate, an irrigation line, or a surface in use., and it is not accepted if A blocked drain, a joint that has opened, a gate that rubs, or a dripper that has stopped, while the same element can still be repaired rather than fully replaced. appears.

The check uses A visual inspection, drain clearing, tightening a fixing, and a touch-up of paint or seal of the existing surface type., and work stops when Heat opens existing joints, rain reveals a blocked drain, and coastal salt shows rust on metal that is already there. These are signs for a maintenance visit, not a demolition date.. The measure is By the visit and by the existing element whose function is maintained, not by the metre of a new building and not by a demolish-and-rebuild item., then care stays as follows: A cycle of visits for the same element: cleaning, tightening, a local touch-up, and a report if the defect leaves maintenance and becomes renovation.. The page refuses demolishing an element and rebuilding it. It refuses a new villa or a new building. It refuses to become a full renovation contract.

A clear handover to renovation if needed

In Maintenance, “A clear handover to renovation if needed” means The part that went beyond maintenance is named. It applies to An element already built and still in place: a drain, a joint, an existing coating, a gate, an irrigation line, or a surface in use., and it is not accepted if A blocked drain, a joint that has opened, a gate that rubs, or a dripper that has stopped, while the same element can still be repaired rather than fully replaced. appears.

The check uses A visual inspection, drain clearing, tightening a fixing, and a touch-up of paint or seal of the existing surface type., and work stops when Heat opens existing joints, rain reveals a blocked drain, and coastal salt shows rust on metal that is already there. These are signs for a maintenance visit, not a demolition date.. The measure is By the visit and by the existing element whose function is maintained, not by the metre of a new building and not by a demolish-and-rebuild item., then care stays as follows: A cycle of visits for the same element: cleaning, tightening, a local touch-up, and a report if the defect leaves maintenance and becomes renovation.. The page refuses demolishing an element and rebuilding it. It refuses a new villa or a new building. It refuses to become a full renovation contract.

Our work

Photos of the kind of work. The details of this service are above and below.

Entrance maintenance and renovation
Entrance maintenance and renovation
Courtyard maintenance and renovation
Courtyard maintenance and renovation
Outdoor floor renewal
Outdoor floor renewal
School yard development
School yard development
Gardens and facilities
Gardens and facilities
Path landscaping
Path landscaping
Parking yard renewal
Parking yard renewal
Sports field preparation
Sports field preparation

After maintenance is handed over

A cycle of visits for the same element: cleaning, tightening, a local touch-up, and a report if the defect leaves maintenance and becomes renovation. This detail belongs only to Maintenance and is not pasted onto another trade. The surface in question is An element already built and still in place: a drain, a joint, an existing coating, a gate, an irrigation line, or a surface in use., and the exclusion is explicit: The page refuses demolishing an element and rebuilding it. It refuses a new villa or a new building. It refuses to become a full renovation contract..

Care is a visit schedule after heat and after rain. What cannot be repaired on the visit is written up for the renovation page and is not hidden as maintenance. This detail belongs only to Maintenance and is not pasted onto another trade. The surface in question is An element already built and still in place: a drain, a joint, an existing coating, a gate, an irrigation line, or a surface in use., and the exclusion is explicit: The page refuses demolishing an element and rebuilding it. It refuses a new villa or a new building. It refuses to become a full renovation contract..

A post-summer visit checks joints that heat opened. A post-rain visit checks drains. On the coast, salt is wiped from existing metal. This detail belongs only to Maintenance and is not pasted onto another trade. The surface in question is An element already built and still in place: a drain, a joint, an existing coating, a gate, an irrigation line, or a surface in use., and the exclusion is explicit: The page refuses demolishing an element and rebuilding it. It refuses a new villa or a new building. It refuses to become a full renovation contract..

If A blocked drain, a joint that has opened, a gate that rubs, or a dripper that has stopped, while the same element can still be repaired rather than fully replaced. appears, this trade is reopened on the same surface. Work stops when Heat opens existing joints, rain reveals a blocked drain, and coastal salt shows rust on metal that is already there. These are signs for a maintenance visit, not a demolition date.. Inspection uses A visual inspection, drain clearing, tightening a fixing, and a touch-up of paint or seal of the existing surface type., and the agreed measure is By the visit and by the existing element whose function is maintained, not by the metre of a new building and not by a demolish-and-rebuild item.. After handover, care stays within A cycle of visits for the same element: cleaning, tightening, a local touch-up, and a report if the defect leaves maintenance and becomes renovation..

Maintenance across Saudi regions

How Maintenance is carried out changes from one region to another with the climate and the access. Districts and the road from Jeddah are on the city page. The link in each region opens it.

Maintenance in the Riyadh Region

The effect of the Riyadh Region on Maintenance comes from this constraint: high daytime heat, dust, and a wide gap between afternoon and night temperatures. On An element already built and still in place: a drain, a joint, an existing coating, a gate, an irrigation line, or a surface in use. that means delaying work if the constraint meets this limit: Heat opens existing joints, rain reveals a blocked drain, and coastal salt shows rust on metal that is already there. These are signs for a maintenance visit, not a demolition date.. The defect looked for here is A blocked drain, a joint that has opened, a gate that rubs, or a dripper that has stopped, while the same element can still be repaired rather than fully replaced., and the measure is By the visit and by the existing element whose function is maintained, not by the metre of a new building and not by a demolish-and-rebuild item.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Riyadh Region page and on its capital page.

Maintenance in the Makkah Region

The effect of the Makkah Region on Maintenance comes from this constraint: a hot humid coast in Jeddah and Rabigh, and rock and slopes in Makkah and Taif. On An element already built and still in place: a drain, a joint, an existing coating, a gate, an irrigation line, or a surface in use. that means delaying work if the constraint meets this limit: Heat opens existing joints, rain reveals a blocked drain, and coastal salt shows rust on metal that is already there. These are signs for a maintenance visit, not a demolition date.. The defect looked for here is A blocked drain, a joint that has opened, a gate that rubs, or a dripper that has stopped, while the same element can still be repaired rather than fully replaced., and the measure is By the visit and by the existing element whose function is maintained, not by the metre of a new building and not by a demolish-and-rebuild item.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Makkah Region page and on its capital page.

Maintenance in the Madinah Region

The effect of the Madinah Region on Maintenance comes from this constraint: dry heat, volcanic harra around places such as Khaybar, and an industrial coast at Yanbu. On An element already built and still in place: a drain, a joint, an existing coating, a gate, an irrigation line, or a surface in use. that means delaying work if the constraint meets this limit: Heat opens existing joints, rain reveals a blocked drain, and coastal salt shows rust on metal that is already there. These are signs for a maintenance visit, not a demolition date.. The defect looked for here is A blocked drain, a joint that has opened, a gate that rubs, or a dripper that has stopped, while the same element can still be repaired rather than fully replaced., and the measure is By the visit and by the existing element whose function is maintained, not by the metre of a new building and not by a demolish-and-rebuild item.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Madinah Region page and on its capital page.

Maintenance in the Qassim Region

The effect of the Qassim Region on Maintenance comes from this constraint: a dry Najd climate, dust, and agricultural and trading activity around Buraidah and Unaizah. On An element already built and still in place: a drain, a joint, an existing coating, a gate, an irrigation line, or a surface in use. that means delaying work if the constraint meets this limit: Heat opens existing joints, rain reveals a blocked drain, and coastal salt shows rust on metal that is already there. These are signs for a maintenance visit, not a demolition date.. The defect looked for here is A blocked drain, a joint that has opened, a gate that rubs, or a dripper that has stopped, while the same element can still be repaired rather than fully replaced., and the measure is By the visit and by the existing element whose function is maintained, not by the metre of a new building and not by a demolish-and-rebuild item.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Qassim Region page and on its capital page.

Maintenance in the Eastern Province

The effect of the Eastern Province on Maintenance comes from this constraint: Gulf humidity, sabkha and groundwater on the coast, and high heat inland at Hafar Al Batin. On An element already built and still in place: a drain, a joint, an existing coating, a gate, an irrigation line, or a surface in use. that means delaying work if the constraint meets this limit: Heat opens existing joints, rain reveals a blocked drain, and coastal salt shows rust on metal that is already there. These are signs for a maintenance visit, not a demolition date.. The defect looked for here is A blocked drain, a joint that has opened, a gate that rubs, or a dripper that has stopped, while the same element can still be repaired rather than fully replaced., and the measure is By the visit and by the existing element whose function is maintained, not by the metre of a new building and not by a demolish-and-rebuild item.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Eastern Province page and on its capital page.

Maintenance in the Asir Region

The effect of the Asir Region on Maintenance comes from this constraint: rainy foggy highlands around Abha, and stronger heat in Bisha and Tathlith. On An element already built and still in place: a drain, a joint, an existing coating, a gate, an irrigation line, or a surface in use. that means delaying work if the constraint meets this limit: Heat opens existing joints, rain reveals a blocked drain, and coastal salt shows rust on metal that is already there. These are signs for a maintenance visit, not a demolition date.. The defect looked for here is A blocked drain, a joint that has opened, a gate that rubs, or a dripper that has stopped, while the same element can still be repaired rather than fully replaced., and the measure is By the visit and by the existing element whose function is maintained, not by the metre of a new building and not by a demolish-and-rebuild item.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Asir Region page and on its capital page.

Maintenance in the Tabuk Region

The effect of the Tabuk Region on Maintenance comes from this constraint: hot summers, cold nights in winter, wind, and a Red Sea coast at Al Wajh, Duba and Umluj. On An element already built and still in place: a drain, a joint, an existing coating, a gate, an irrigation line, or a surface in use. that means delaying work if the constraint meets this limit: Heat opens existing joints, rain reveals a blocked drain, and coastal salt shows rust on metal that is already there. These are signs for a maintenance visit, not a demolition date.. The defect looked for here is A blocked drain, a joint that has opened, a gate that rubs, or a dripper that has stopped, while the same element can still be repaired rather than fully replaced., and the measure is By the visit and by the existing element whose function is maintained, not by the metre of a new building and not by a demolish-and-rebuild item.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Tabuk Region page and on its capital page.

Maintenance in the Hail Region

The effect of the Hail Region on Maintenance comes from this constraint: a dry northern climate, cold nights, and dust on open roads. On An element already built and still in place: a drain, a joint, an existing coating, a gate, an irrigation line, or a surface in use. that means delaying work if the constraint meets this limit: Heat opens existing joints, rain reveals a blocked drain, and coastal salt shows rust on metal that is already there. These are signs for a maintenance visit, not a demolition date.. The defect looked for here is A blocked drain, a joint that has opened, a gate that rubs, or a dripper that has stopped, while the same element can still be repaired rather than fully replaced., and the measure is By the visit and by the existing element whose function is maintained, not by the metre of a new building and not by a demolish-and-rebuild item.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Hail Region page and on its capital page.

Maintenance in the Northern Borders Region

The effect of the Northern Borders Region on Maintenance comes from this constraint: geographic distance, a cold winter, and wind in small border cities. On An element already built and still in place: a drain, a joint, an existing coating, a gate, an irrigation line, or a surface in use. that means delaying work if the constraint meets this limit: Heat opens existing joints, rain reveals a blocked drain, and coastal salt shows rust on metal that is already there. These are signs for a maintenance visit, not a demolition date.. The defect looked for here is A blocked drain, a joint that has opened, a gate that rubs, or a dripper that has stopped, while the same element can still be repaired rather than fully replaced., and the measure is By the visit and by the existing element whose function is maintained, not by the metre of a new building and not by a demolish-and-rebuild item.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Northern Borders Region page and on its capital page.

Maintenance in the Jazan Region

The effect of the Jazan Region on Maintenance comes from this constraint: humid Tihama heat, seasonal rain and wadis, and the island constraint of Farasan. On An element already built and still in place: a drain, a joint, an existing coating, a gate, an irrigation line, or a surface in use. that means delaying work if the constraint meets this limit: Heat opens existing joints, rain reveals a blocked drain, and coastal salt shows rust on metal that is already there. These are signs for a maintenance visit, not a demolition date.. The defect looked for here is A blocked drain, a joint that has opened, a gate that rubs, or a dripper that has stopped, while the same element can still be repaired rather than fully replaced., and the measure is By the visit and by the existing element whose function is maintained, not by the metre of a new building and not by a demolish-and-rebuild item.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Jazan Region page and on its capital page.

Maintenance in the Najran Region

The effect of the Najran Region on Maintenance comes from this constraint: a valley between highlands, heat, and a distance from Jeddah that shows up in supply. On An element already built and still in place: a drain, a joint, an existing coating, a gate, an irrigation line, or a surface in use. that means delaying work if the constraint meets this limit: Heat opens existing joints, rain reveals a blocked drain, and coastal salt shows rust on metal that is already there. These are signs for a maintenance visit, not a demolition date.. The defect looked for here is A blocked drain, a joint that has opened, a gate that rubs, or a dripper that has stopped, while the same element can still be repaired rather than fully replaced., and the measure is By the visit and by the existing element whose function is maintained, not by the metre of a new building and not by a demolish-and-rebuild item.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Najran Region page and on its capital page.

Maintenance in the Al Bahah Region

The effect of the Al Bahah Region on Maintenance comes from this constraint: highlands, fog, rain, and short mountain roads between towns. On An element already built and still in place: a drain, a joint, an existing coating, a gate, an irrigation line, or a surface in use. that means delaying work if the constraint meets this limit: Heat opens existing joints, rain reveals a blocked drain, and coastal salt shows rust on metal that is already there. These are signs for a maintenance visit, not a demolition date.. The defect looked for here is A blocked drain, a joint that has opened, a gate that rubs, or a dripper that has stopped, while the same element can still be repaired rather than fully replaced., and the measure is By the visit and by the existing element whose function is maintained, not by the metre of a new building and not by a demolish-and-rebuild item.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Al Bahah Region page and on its capital page.

Maintenance in the Al Jawf Region

The effect of the Al Jawf Region on Maintenance comes from this constraint: an agricultural north, cold winters, and a long distance from Jeddah. On An element already built and still in place: a drain, a joint, an existing coating, a gate, an irrigation line, or a surface in use. that means delaying work if the constraint meets this limit: Heat opens existing joints, rain reveals a blocked drain, and coastal salt shows rust on metal that is already there. These are signs for a maintenance visit, not a demolition date.. The defect looked for here is A blocked drain, a joint that has opened, a gate that rubs, or a dripper that has stopped, while the same element can still be repaired rather than fully replaced., and the measure is By the visit and by the existing element whose function is maintained, not by the metre of a new building and not by a demolish-and-rebuild item.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Al Jawf Region page and on its capital page.

A site example of maintenance

An existing yard drain has blocked and a gate rubs the ground: the visit is clearing and a small lift of the gate. If the ground must be cut and poured again, that is renovation, not maintenance. This detail belongs only to Maintenance and is not pasted onto another trade. The surface in question is An element already built and still in place: a drain, a joint, an existing coating, a gate, an irrigation line, or a surface in use., and the exclusion is explicit: The page refuses demolishing an element and rebuilding it. It refuses a new villa or a new building. It refuses to become a full renovation contract..

The example is not used to build a new villa or to price demolition in riyals. This detail belongs only to Maintenance and is not pasted onto another trade. The surface in question is An element already built and still in place: a drain, a joint, an existing coating, a gate, an irrigation line, or a surface in use., and the exclusion is explicit: The page refuses demolishing an element and rebuilding it. It refuses a new villa or a new building. It refuses to become a full renovation contract..

If A blocked drain, a joint that has opened, a gate that rubs, or a dripper that has stopped, while the same element can still be repaired rather than fully replaced. appears, this trade is reopened on the same surface. Work stops when Heat opens existing joints, rain reveals a blocked drain, and coastal salt shows rust on metal that is already there. These are signs for a maintenance visit, not a demolition date.. Inspection uses A visual inspection, drain clearing, tightening a fixing, and a touch-up of paint or seal of the existing surface type., and the agreed measure is By the visit and by the existing element whose function is maintained, not by the metre of a new building and not by a demolish-and-rebuild item.. After handover, care stays within A cycle of visits for the same element: cleaning, tightening, a local touch-up, and a report if the defect leaves maintenance and becomes renovation..

The example shows how to think before a survey. It is not a contract and not an approved quantity. Any area the client states is checked on site because By the visit and by the existing element whose function is maintained, not by the metre of a new building and not by a demolish-and-rebuild item. may change after openings, slopes, or zones this trade does not cover are deducted.

What maintenance does not include

The work closest to Maintenance is Renovation. Renovation changes what exists or rehabilitates it, while maintenance keeps the same element in service by cleaning, tightening, and local touch-up, without rebuilding and without a new villa. This page explains Maintenance only.

If the project needs both, each one is listed in the quotation with its own quantity. Start at Renovation if that is the request, or continue here if the request is Maintenance.

A list is handed over of the elements that were cleaned or tightened, and whatever stayed outside maintenance is named so it is not assumed to have been repaired. This detail belongs only to Maintenance and is not pasted onto another trade. The surface in question is An element already built and still in place: a drain, a joint, an existing coating, a gate, an irrigation line, or a surface in use., and the exclusion is explicit: The page refuses demolishing an element and rebuilding it. It refuses a new villa or a new building. It refuses to become a full renovation contract..

If A blocked drain, a joint that has opened, a gate that rubs, or a dripper that has stopped, while the same element can still be repaired rather than fully replaced. appears, this trade is reopened on the same surface. Work stops when Heat opens existing joints, rain reveals a blocked drain, and coastal salt shows rust on metal that is already there. These are signs for a maintenance visit, not a demolition date.. Inspection uses A visual inspection, drain clearing, tightening a fixing, and a touch-up of paint or seal of the existing surface type., and the agreed measure is By the visit and by the existing element whose function is maintained, not by the metre of a new building and not by a demolish-and-rebuild item.. After handover, care stays within A cycle of visits for the same element: cleaning, tightening, a local touch-up, and a report if the defect leaves maintenance and becomes renovation..

Common questions about maintenance

This page keeps existing work in service. If the element’s form must change or it must be rebuilt, the page is renovation. Maintenance does not open a villa on an empty plot and does not replace an existing system with a new one. It repairs what is still itself.
It is requested after handover, or on old work that still does its job and needs cleaning, tightening, or a touch-up. It is not requested when the element has failed down to its base, nor when the request is new construction.
Materials used for Maintenance include: List of existing elements, Material of the same type, Clearing and tightening tools, Visit record, Protection of existing surroundings. Each line is something already there: a drain, a joint, a gate, a line, a surface. There is no line for new construction.
Maintenance follows this order: List what exists, not what is new, Inspection visit, Separate a local defect, Clean and tighten, Local touch-up. Skipping a step shows up at handover.
Mistakes we refuse in Maintenance: Calling new construction maintenance, Demolishing the element inside a maintenance visit, Painting over a structural defect, Replacing a whole system under the name of a touch-up, A visit without a list. A villa on an empty plot is not upkeep of something existing.
The price of Maintenance is set after the survey. It changes with: Number of elements on the visit, Ease of reaching what exists, Seasonal repeat, Salt on existing metal, Finding a defect outside maintenance. The measure is By the visit and by the existing element whose function is maintained, not by the metre of a new building and not by a demolish-and-rebuild item.
At handover of Maintenance we check: Function returned, The element is the same, Surroundings intact, A written list, No construction item. The drain drains, or the gate swings, or the dripper drips.
A cycle of visits for the same element: cleaning, tightening, a local touch-up, and a report if the defect leaves maintenance and becomes renovation. Care is a visit schedule after heat and after rain. What cannot be repaired on the visit is written up for the renovation page and is not hidden as maintenance.
A post-summer visit checks joints that heat opened. A post-rain visit checks drains. On the coast, salt is wiped from existing metal. The visit date follows the city’s heat and the distance from the Jeddah office in Al Hamdaniyah.
An existing yard drain has blocked and a gate rubs the ground: the visit is clearing and a small lift of the gate. If the ground must be cut and poured again, that is renovation, not maintenance. The example is not used to build a new villa or to price demolition in riyals.
The page refuses demolishing an element and rebuilding it. It refuses a new villa or a new building. It refuses to become a full renovation contract. If the request is Renovation, the details are on its page, because Renovation changes what exists or rehabilitates it, while maintenance keeps the same element in service by cleaning, tightening, and local touch-up, without rebuilding and without a new villa.
No. Maintenance keeps existing work. A new villa is a construction page, not this one.
When the element loses its form and must be opened, rebuilt, or changed. That is the renovation page.
Cleaning, tightening, and a local touch-up of the same type sit inside maintenance. Change and rehabilitation do not.
Yes, for what already exists: heat opens joints, rain tests a drain, and salt shows on metal near the sea. The weather for pouring a new building is not written here.
From the Mayyas Alarab Contracting office in Al Hamdaniyah, Jeddah. Other cities are scheduled visits, not branches.