Scope of general contracting

General contracting here means managing scope and the interface with the owner, not an encyclopedia of every building trade. This detail belongs only to General contracting and is not pasted onto another trade. The surface in question is A live site or an empty plot that needs coordination between successive trades, not a technical manual for each trade., and the exclusion is explicit: This page does not teach plaster, interlock, turf or the concrete frame. Each of those has its own trade page..

If the request is a single trade, the correct page is that trade’s page, not this one. This detail belongs only to General contracting and is not pasted onto another trade. The surface in question is A live site or an empty plot that needs coordination between successive trades, not a technical manual for each trade., and the exclusion is explicit: This page does not teach plaster, interlock, turf or the concrete frame. Each of those has its own trade page..

If Clashes between trades, handover without a snag list, or a mixed measure that adds two trades into one figure. appears, this trade is reopened on the same surface. Work stops when The weather-sensitive trade stops according to its own page. The coordinator does not force a closeout in peak heat or rain.. Inspection uses A scope schedule, a survey minute, and a weekly photo trail that keeps each trade under its own number., and the agreed measure is A bill that keeps trades separate, not a lump sum that dissolves the boundaries between them.. After handover, care stays within A defects-liability window for the agreed snags, then each trade is closed on its own page..

This page does not teach plaster, interlock, turf or the concrete frame. Each of those has its own trade page. If the project needs Residential building, the details are on the Residential building page. Residential building explains construction of the dwelling itself, while this page explains coordination when several trades are involved.

We carry out General contracting in cities across Saudi Arabia. Season and access change from one city to another. Open your city from the region pages for the visit date, and stay here for how General contracting itself is done.

When we carry out general contracting

An owner who wants one party to coordinate survey, schedule and handover when more than one trade sits under a single scope. This detail belongs only to General contracting and is not pasted onto another trade. The surface in question is A live site or an empty plot that needs coordination between successive trades, not a technical manual for each trade., and the exclusion is explicit: This page does not teach plaster, interlock, turf or the concrete frame. Each of those has its own trade page..

It is requested when structure, finishes and external works sit in the same project and one coordinator must own the sequence. This detail belongs only to General contracting and is not pasted onto another trade. The surface in question is A live site or an empty plot that needs coordination between successive trades, not a technical manual for each trade., and the exclusion is explicit: This page does not teach plaster, interlock, turf or the concrete frame. Each of those has its own trade page..

It is not a substitute for the villa page when the work is a new villa and no overlapping external trades need to be coordinated here. This detail belongs only to General contracting and is not pasted onto another trade. The surface in question is A live site or an empty plot that needs coordination between successive trades, not a technical manual for each trade., and the exclusion is explicit: This page does not teach plaster, interlock, turf or the concrete frame. Each of those has its own trade page..

If Clashes between trades, handover without a snag list, or a mixed measure that adds two trades into one figure. appears, this trade is reopened on the same surface. Work stops when The weather-sensitive trade stops according to its own page. The coordinator does not force a closeout in peak heat or rain.. Inspection uses A scope schedule, a survey minute, and a weekly photo trail that keeps each trade under its own number., and the agreed measure is A bill that keeps trades separate, not a lump sum that dissolves the boundaries between them.. After handover, care stays within A defects-liability window for the agreed snags, then each trade is closed on its own page..

A request for General contracting starts when the client names the city, the building and the limit of work. The office is in Jeddah, and visits in other cities are arranged by distance. This page explains the work itself.

Materials for general contracting

The materials of General contracting are listed below. Each one has an acceptance rule. If the rule is missed, the batch is rejected before the work continues.

Written scope

In General contracting, “Written scope” means A list of trades by name without explaining how each one is built. It applies to A live site or an empty plot that needs coordination between successive trades, not a technical manual for each trade., and it is not accepted if Clashes between trades, handover without a snag list, or a mixed measure that adds two trades into one figure. appears.

The check uses A scope schedule, a survey minute, and a weekly photo trail that keeps each trade under its own number., and work stops when The weather-sensitive trade stops according to its own page. The coordinator does not force a closeout in peak heat or rain.. The measure is A bill that keeps trades separate, not a lump sum that dissolves the boundaries between them., then care stays as follows: A defects-liability window for the agreed snags, then each trade is closed on its own page.. This page does not teach plaster, interlock, turf or the concrete frame. Each of those has its own trade page.

Sequence schedule

In General contracting, “Sequence schedule” means The order of who may enter the site after whom. It applies to A live site or an empty plot that needs coordination between successive trades, not a technical manual for each trade., and it is not accepted if Clashes between trades, handover without a snag list, or a mixed measure that adds two trades into one figure. appears.

The check uses A scope schedule, a survey minute, and a weekly photo trail that keeps each trade under its own number., and work stops when The weather-sensitive trade stops according to its own page. The coordinator does not force a closeout in peak heat or rain.. The measure is A bill that keeps trades separate, not a lump sum that dissolves the boundaries between them., then care stays as follows: A defects-liability window for the agreed snags, then each trade is closed on its own page.. This page does not teach plaster, interlock, turf or the concrete frame. Each of those has its own trade page.

Survey minute

In General contracting, “Survey minute” means City, access and current condition, without an invented soil report. It applies to A live site or an empty plot that needs coordination between successive trades, not a technical manual for each trade., and it is not accepted if Clashes between trades, handover without a snag list, or a mixed measure that adds two trades into one figure. appears.

The check uses A scope schedule, a survey minute, and a weekly photo trail that keeps each trade under its own number., and work stops when The weather-sensitive trade stops according to its own page. The coordinator does not force a closeout in peak heat or rain.. The measure is A bill that keeps trades separate, not a lump sum that dissolves the boundaries between them., then care stays as follows: A defects-liability window for the agreed snags, then each trade is closed on its own page.. This page does not teach plaster, interlock, turf or the concrete frame. Each of those has its own trade page.

Photo log

In General contracting, “Photo log” means Photos assigned to each trade number, not a mixed album. It applies to A live site or an empty plot that needs coordination between successive trades, not a technical manual for each trade., and it is not accepted if Clashes between trades, handover without a snag list, or a mixed measure that adds two trades into one figure. appears.

The check uses A scope schedule, a survey minute, and a weekly photo trail that keeps each trade under its own number., and work stops when The weather-sensitive trade stops according to its own page. The coordinator does not force a closeout in peak heat or rain.. The measure is A bill that keeps trades separate, not a lump sum that dissolves the boundaries between them., then care stays as follows: A defects-liability window for the agreed snags, then each trade is closed on its own page.. This page does not teach plaster, interlock, turf or the concrete frame. Each of those has its own trade page.

Separated bill

In General contracting, “Separated bill” means Each trade quantity stays on its own page. It applies to A live site or an empty plot that needs coordination between successive trades, not a technical manual for each trade., and it is not accepted if Clashes between trades, handover without a snag list, or a mixed measure that adds two trades into one figure. appears.

The check uses A scope schedule, a survey minute, and a weekly photo trail that keeps each trade under its own number., and work stops when The weather-sensitive trade stops according to its own page. The coordinator does not force a closeout in peak heat or rain.. The measure is A bill that keeps trades separate, not a lump sum that dissolves the boundaries between them., then care stays as follows: A defects-liability window for the agreed snags, then each trade is closed on its own page.. This page does not teach plaster, interlock, turf or the concrete frame. Each of those has its own trade page.

Snag list

In General contracting, “Snag list” means Each snag is closed in the trade that produced it. It applies to A live site or an empty plot that needs coordination between successive trades, not a technical manual for each trade., and it is not accepted if Clashes between trades, handover without a snag list, or a mixed measure that adds two trades into one figure. appears.

The check uses A scope schedule, a survey minute, and a weekly photo trail that keeps each trade under its own number., and work stops when The weather-sensitive trade stops according to its own page. The coordinator does not force a closeout in peak heat or rain.. The measure is A bill that keeps trades separate, not a lump sum that dissolves the boundaries between them., then care stays as follows: A defects-liability window for the agreed snags, then each trade is closed on its own page.. This page does not teach plaster, interlock, turf or the concrete frame. Each of those has its own trade page.

Steps for general contracting

The order of steps in General contracting protects the quality of the work. Skipping a step to finish faster shows up at handover.

Name the included trades

In General contracting, “Name the included trades” means Names are listed and pages that will not be opened are excluded. It applies to A live site or an empty plot that needs coordination between successive trades, not a technical manual for each trade., and it is not accepted if Clashes between trades, handover without a snag list, or a mixed measure that adds two trades into one figure. appears.

The check uses A scope schedule, a survey minute, and a weekly photo trail that keeps each trade under its own number., and work stops when The weather-sensitive trade stops according to its own page. The coordinator does not force a closeout in peak heat or rain.. The measure is A bill that keeps trades separate, not a lump sum that dissolves the boundaries between them., then care stays as follows: A defects-liability window for the agreed snags, then each trade is closed on its own page.. This page does not teach plaster, interlock, turf or the concrete frame. Each of those has its own trade page.

One site survey

In General contracting, “One site survey” means Notes are collected and then split across trades. They are not written as one merged essay. It applies to A live site or an empty plot that needs coordination between successive trades, not a technical manual for each trade., and it is not accepted if Clashes between trades, handover without a snag list, or a mixed measure that adds two trades into one figure. appears.

The check uses A scope schedule, a survey minute, and a weekly photo trail that keeps each trade under its own number., and work stops when The weather-sensitive trade stops according to its own page. The coordinator does not force a closeout in peak heat or rain.. The measure is A bill that keeps trades separate, not a lump sum that dissolves the boundaries between them., then care stays as follows: A defects-liability window for the agreed snags, then each trade is closed on its own page.. This page does not teach plaster, interlock, turf or the concrete frame. Each of those has its own trade page.

Set the interfaces

In General contracting, “Set the interfaces” means What must finish before the next trade starts is defined. It applies to A live site or an empty plot that needs coordination between successive trades, not a technical manual for each trade., and it is not accepted if Clashes between trades, handover without a snag list, or a mixed measure that adds two trades into one figure. appears.

The check uses A scope schedule, a survey minute, and a weekly photo trail that keeps each trade under its own number., and work stops when The weather-sensitive trade stops according to its own page. The coordinator does not force a closeout in peak heat or rain.. The measure is A bill that keeps trades separate, not a lump sum that dissolves the boundaries between them., then care stays as follows: A defects-liability window for the agreed snags, then each trade is closed on its own page.. This page does not teach plaster, interlock, turf or the concrete frame. Each of those has its own trade page.

Approve each measure

In General contracting, “Approve each measure” means Each trade’s unit is taken from its own page. It applies to A live site or an empty plot that needs coordination between successive trades, not a technical manual for each trade., and it is not accepted if Clashes between trades, handover without a snag list, or a mixed measure that adds two trades into one figure. appears.

The check uses A scope schedule, a survey minute, and a weekly photo trail that keeps each trade under its own number., and work stops when The weather-sensitive trade stops according to its own page. The coordinator does not force a closeout in peak heat or rain.. The measure is A bill that keeps trades separate, not a lump sum that dissolves the boundaries between them., then care stays as follows: A defects-liability window for the agreed snags, then each trade is closed on its own page.. This page does not teach plaster, interlock, turf or the concrete frame. Each of those has its own trade page.

Release work in sequence

In General contracting, “Release work in sequence” means A finish trade does not start before the substrate described on that trade’s page is ready. It applies to A live site or an empty plot that needs coordination between successive trades, not a technical manual for each trade., and it is not accepted if Clashes between trades, handover without a snag list, or a mixed measure that adds two trades into one figure. appears.

The check uses A scope schedule, a survey minute, and a weekly photo trail that keeps each trade under its own number., and work stops when The weather-sensitive trade stops according to its own page. The coordinator does not force a closeout in peak heat or rain.. The measure is A bill that keeps trades separate, not a lump sum that dissolves the boundaries between them., then care stays as follows: A defects-liability window for the agreed snags, then each trade is closed on its own page.. This page does not teach plaster, interlock, turf or the concrete frame. Each of those has its own trade page.

A short weekly review

In General contracting, “A short weekly review” means Delay is reviewed for each trade separately. It applies to A live site or an empty plot that needs coordination between successive trades, not a technical manual for each trade., and it is not accepted if Clashes between trades, handover without a snag list, or a mixed measure that adds two trades into one figure. appears.

The check uses A scope schedule, a survey minute, and a weekly photo trail that keeps each trade under its own number., and work stops when The weather-sensitive trade stops according to its own page. The coordinator does not force a closeout in peak heat or rain.. The measure is A bill that keeps trades separate, not a lump sum that dissolves the boundaries between them., then care stays as follows: A defects-liability window for the agreed snags, then each trade is closed on its own page.. This page does not teach plaster, interlock, turf or the concrete frame. Each of those has its own trade page.

Snagging

In General contracting, “Snagging” means The list is split by name, not written as one construction paragraph. It applies to A live site or an empty plot that needs coordination between successive trades, not a technical manual for each trade., and it is not accepted if Clashes between trades, handover without a snag list, or a mixed measure that adds two trades into one figure. appears.

The check uses A scope schedule, a survey minute, and a weekly photo trail that keeps each trade under its own number., and work stops when The weather-sensitive trade stops according to its own page. The coordinator does not force a closeout in peak heat or rain.. The measure is A bill that keeps trades separate, not a lump sum that dissolves the boundaries between them., then care stays as follows: A defects-liability window for the agreed snags, then each trade is closed on its own page.. This page does not teach plaster, interlock, turf or the concrete frame. Each of those has its own trade page.

Hand over the scope

In General contracting, “Hand over the scope” means Coordination closes after the opened trades close, not before. It applies to A live site or an empty plot that needs coordination between successive trades, not a technical manual for each trade., and it is not accepted if Clashes between trades, handover without a snag list, or a mixed measure that adds two trades into one figure. appears.

The check uses A scope schedule, a survey minute, and a weekly photo trail that keeps each trade under its own number., and work stops when The weather-sensitive trade stops according to its own page. The coordinator does not force a closeout in peak heat or rain.. The measure is A bill that keeps trades separate, not a lump sum that dissolves the boundaries between them., then care stays as follows: A defects-liability window for the agreed snags, then each trade is closed on its own page.. This page does not teach plaster, interlock, turf or the concrete frame. Each of those has its own trade page.

Common mistakes in general contracting

Merging two trades into one quantity

In General contracting, “Merging two trades into one quantity” means The cause of a defect is lost at handover. It applies to A live site or an empty plot that needs coordination between successive trades, not a technical manual for each trade., and it is not accepted if Clashes between trades, handover without a snag list, or a mixed measure that adds two trades into one figure. appears.

The check uses A scope schedule, a survey minute, and a weekly photo trail that keeps each trade under its own number., and work stops when The weather-sensitive trade stops according to its own page. The coordinator does not force a closeout in peak heat or rain.. The measure is A bill that keeps trades separate, not a lump sum that dissolves the boundaries between them., then care stays as follows: A defects-liability window for the agreed snags, then each trade is closed on its own page.. This page does not teach plaster, interlock, turf or the concrete frame. Each of those has its own trade page.

Teaching plastering inside a management contract

In General contracting, “Teaching plastering inside a management contract” means It repeats the plaster page and weakens indexing. It applies to A live site or an empty plot that needs coordination between successive trades, not a technical manual for each trade., and it is not accepted if Clashes between trades, handover without a snag list, or a mixed measure that adds two trades into one figure. appears.

The check uses A scope schedule, a survey minute, and a weekly photo trail that keeps each trade under its own number., and work stops when The weather-sensitive trade stops according to its own page. The coordinator does not force a closeout in peak heat or rain.. The measure is A bill that keeps trades separate, not a lump sum that dissolves the boundaries between them., then care stays as follows: A defects-liability window for the agreed snags, then each trade is closed on its own page.. This page does not teach plaster, interlock, turf or the concrete frame. Each of those has its own trade page.

Closing the job before snags

In General contracting, “Closing the job before snags” means A defective surface is left without a trade owner. It applies to A live site or an empty plot that needs coordination between successive trades, not a technical manual for each trade., and it is not accepted if Clashes between trades, handover without a snag list, or a mixed measure that adds two trades into one figure. appears.

The check uses A scope schedule, a survey minute, and a weekly photo trail that keeps each trade under its own number., and work stops when The weather-sensitive trade stops according to its own page. The coordinator does not force a closeout in peak heat or rain.. The measure is A bill that keeps trades separate, not a lump sum that dissolves the boundaries between them., then care stays as follows: A defects-liability window for the agreed snags, then each trade is closed on its own page.. This page does not teach plaster, interlock, turf or the concrete frame. Each of those has its own trade page.

Changing scope verbally

In General contracting, “Changing scope verbally” means A trade is added without a measurement page. It applies to A live site or an empty plot that needs coordination between successive trades, not a technical manual for each trade., and it is not accepted if Clashes between trades, handover without a snag list, or a mixed measure that adds two trades into one figure. appears.

The check uses A scope schedule, a survey minute, and a weekly photo trail that keeps each trade under its own number., and work stops when The weather-sensitive trade stops according to its own page. The coordinator does not force a closeout in peak heat or rain.. The measure is A bill that keeps trades separate, not a lump sum that dissolves the boundaries between them., then care stays as follows: A defects-liability window for the agreed snags, then each trade is closed on its own page.. This page does not teach plaster, interlock, turf or the concrete frame. Each of those has its own trade page.

Ignoring the city of the work

In General contracting, “Ignoring the city of the work” means A Jeddah date is not an Arar date. It applies to A live site or an empty plot that needs coordination between successive trades, not a technical manual for each trade., and it is not accepted if Clashes between trades, handover without a snag list, or a mixed measure that adds two trades into one figure. appears.

The check uses A scope schedule, a survey minute, and a weekly photo trail that keeps each trade under its own number., and work stops when The weather-sensitive trade stops according to its own page. The coordinator does not force a closeout in peak heat or rain.. The measure is A bill that keeps trades separate, not a lump sum that dissolves the boundaries between them., then care stays as follows: A defects-liability window for the agreed snags, then each trade is closed on its own page.. This page does not teach plaster, interlock, turf or the concrete frame. Each of those has its own trade page.

Claiming a branch that does not exist

In General contracting, “Claiming a branch that does not exist” means The only stated office is in Al Hamdaniyah, Jeddah. It applies to A live site or an empty plot that needs coordination between successive trades, not a technical manual for each trade., and it is not accepted if Clashes between trades, handover without a snag list, or a mixed measure that adds two trades into one figure. appears.

The check uses A scope schedule, a survey minute, and a weekly photo trail that keeps each trade under its own number., and work stops when The weather-sensitive trade stops according to its own page. The coordinator does not force a closeout in peak heat or rain.. The measure is A bill that keeps trades separate, not a lump sum that dissolves the boundaries between them., then care stays as follows: A defects-liability window for the agreed snags, then each trade is closed on its own page.. This page does not teach plaster, interlock, turf or the concrete frame. Each of those has its own trade page.

What affects the price of general contracting

The price of General contracting is set after the survey, because it changes with the city, access, the surface and the season. The factors below show what raises or lowers the cost.

Number of opened trades

In General contracting, “Number of opened trades” means Each trade is a page and a measure. Coordination grows with the count. It applies to A live site or an empty plot that needs coordination between successive trades, not a technical manual for each trade., and it is not accepted if Clashes between trades, handover without a snag list, or a mixed measure that adds two trades into one figure. appears.

The check uses A scope schedule, a survey minute, and a weekly photo trail that keeps each trade under its own number., and work stops when The weather-sensitive trade stops according to its own page. The coordinator does not force a closeout in peak heat or rain.. The measure is A bill that keeps trades separate, not a lump sum that dissolves the boundaries between them., then care stays as follows: A defects-liability window for the agreed snags, then each trade is closed on its own page.. This page does not teach plaster, interlock, turf or the concrete frame. Each of those has its own trade page.

Distance of the city from Jeddah

In General contracting, “Distance of the city from Jeddah” means A visit to the Northern Borders is not a visit inside Jeddah. It applies to A live site or an empty plot that needs coordination between successive trades, not a technical manual for each trade., and it is not accepted if Clashes between trades, handover without a snag list, or a mixed measure that adds two trades into one figure. appears.

The check uses A scope schedule, a survey minute, and a weekly photo trail that keeps each trade under its own number., and work stops when The weather-sensitive trade stops according to its own page. The coordinator does not force a closeout in peak heat or rain.. The measure is A bill that keeps trades separate, not a lump sum that dissolves the boundaries between them., then care stays as follows: A defects-liability window for the agreed snags, then each trade is closed on its own page.. This page does not teach plaster, interlock, turf or the concrete frame. Each of those has its own trade page.

Tight access

In General contracting, “Tight access” means Equipment in a narrow lane changes time, not the definition of the trade. It applies to A live site or an empty plot that needs coordination between successive trades, not a technical manual for each trade., and it is not accepted if Clashes between trades, handover without a snag list, or a mixed measure that adds two trades into one figure. appears.

The check uses A scope schedule, a survey minute, and a weekly photo trail that keeps each trade under its own number., and work stops when The weather-sensitive trade stops according to its own page. The coordinator does not force a closeout in peak heat or rain.. The measure is A bill that keeps trades separate, not a lump sum that dissolves the boundaries between them., then care stays as follows: A defects-liability window for the agreed snags, then each trade is closed on its own page.. This page does not teach plaster, interlock, turf or the concrete frame. Each of those has its own trade page.

Heat or rain season

In General contracting, “Heat or rain season” means It reorders the sequence. It applies to A live site or an empty plot that needs coordination between successive trades, not a technical manual for each trade., and it is not accepted if Clashes between trades, handover without a snag list, or a mixed measure that adds two trades into one figure. appears.

The check uses A scope schedule, a survey minute, and a weekly photo trail that keeps each trade under its own number., and work stops when The weather-sensitive trade stops according to its own page. The coordinator does not force a closeout in peak heat or rain.. The measure is A bill that keeps trades separate, not a lump sum that dissolves the boundaries between them., then care stays as follows: A defects-liability window for the agreed snags, then each trade is closed on its own page.. This page does not teach plaster, interlock, turf or the concrete frame. Each of those has its own trade page.

An existing building

In General contracting, “An existing building” means Protection and opening-up add coordination compared with an empty plot. It applies to A live site or an empty plot that needs coordination between successive trades, not a technical manual for each trade., and it is not accepted if Clashes between trades, handover without a snag list, or a mixed measure that adds two trades into one figure. appears.

The check uses A scope schedule, a survey minute, and a weekly photo trail that keeps each trade under its own number., and work stops when The weather-sensitive trade stops according to its own page. The coordinator does not force a closeout in peak heat or rain.. The measure is A bill that keeps trades separate, not a lump sum that dissolves the boundaries between them., then care stays as follows: A defects-liability window for the agreed snags, then each trade is closed on its own page.. This page does not teach plaster, interlock, turf or the concrete frame. Each of those has its own trade page.

Clarity of drawings

In General contracting, “Clarity of drawings” means An incomplete drawing adds quantity meetings. It applies to A live site or an empty plot that needs coordination between successive trades, not a technical manual for each trade., and it is not accepted if Clashes between trades, handover without a snag list, or a mixed measure that adds two trades into one figure. appears.

The check uses A scope schedule, a survey minute, and a weekly photo trail that keeps each trade under its own number., and work stops when The weather-sensitive trade stops according to its own page. The coordinator does not force a closeout in peak heat or rain.. The measure is A bill that keeps trades separate, not a lump sum that dissolves the boundaries between them., then care stays as follows: A defects-liability window for the agreed snags, then each trade is closed on its own page.. This page does not teach plaster, interlock, turf or the concrete frame. Each of those has its own trade page.

Handover of general contracting

Every trade has a name and a page

In General contracting, “Every trade has a name and a page” means No work is left without an owner. It applies to A live site or an empty plot that needs coordination between successive trades, not a technical manual for each trade., and it is not accepted if Clashes between trades, handover without a snag list, or a mixed measure that adds two trades into one figure. appears.

The check uses A scope schedule, a survey minute, and a weekly photo trail that keeps each trade under its own number., and work stops when The weather-sensitive trade stops according to its own page. The coordinator does not force a closeout in peak heat or rain.. The measure is A bill that keeps trades separate, not a lump sum that dissolves the boundaries between them., then care stays as follows: A defects-liability window for the agreed snags, then each trade is closed on its own page.. This page does not teach plaster, interlock, turf or the concrete frame. Each of those has its own trade page.

The schedule shows sequence

In General contracting, “The schedule shows sequence” means It is clear who waits for whom. It applies to A live site or an empty plot that needs coordination between successive trades, not a technical manual for each trade., and it is not accepted if Clashes between trades, handover without a snag list, or a mixed measure that adds two trades into one figure. appears.

The check uses A scope schedule, a survey minute, and a weekly photo trail that keeps each trade under its own number., and work stops when The weather-sensitive trade stops according to its own page. The coordinator does not force a closeout in peak heat or rain.. The measure is A bill that keeps trades separate, not a lump sum that dissolves the boundaries between them., then care stays as follows: A defects-liability window for the agreed snags, then each trade is closed on its own page.. This page does not teach plaster, interlock, turf or the concrete frame. Each of those has its own trade page.

Photos are attributed

In General contracting, “Photos are attributed” means Each photo carries the trade name. It applies to A live site or an empty plot that needs coordination between successive trades, not a technical manual for each trade., and it is not accepted if Clashes between trades, handover without a snag list, or a mixed measure that adds two trades into one figure. appears.

The check uses A scope schedule, a survey minute, and a weekly photo trail that keeps each trade under its own number., and work stops when The weather-sensitive trade stops according to its own page. The coordinator does not force a closeout in peak heat or rain.. The measure is A bill that keeps trades separate, not a lump sum that dissolves the boundaries between them., then care stays as follows: A defects-liability window for the agreed snags, then each trade is closed on its own page.. This page does not teach plaster, interlock, turf or the concrete frame. Each of those has its own trade page.

Snags are closed or dated

In General contracting, “Snags are closed or dated” means No verbal handover. It applies to A live site or an empty plot that needs coordination between successive trades, not a technical manual for each trade., and it is not accepted if Clashes between trades, handover without a snag list, or a mixed measure that adds two trades into one figure. appears.

The check uses A scope schedule, a survey minute, and a weekly photo trail that keeps each trade under its own number., and work stops when The weather-sensitive trade stops according to its own page. The coordinator does not force a closeout in peak heat or rain.. The measure is A bill that keeps trades separate, not a lump sum that dissolves the boundaries between them., then care stays as follows: A defects-liability window for the agreed snags, then each trade is closed on its own page.. This page does not teach plaster, interlock, turf or the concrete frame. Each of those has its own trade page.

The city is written on the request

In General contracting, “The city is written on the request” means A Riyadh request goes to the Riyadh page, not only to the trade page. It applies to A live site or an empty plot that needs coordination between successive trades, not a technical manual for each trade., and it is not accepted if Clashes between trades, handover without a snag list, or a mixed measure that adds two trades into one figure. appears.

The check uses A scope schedule, a survey minute, and a weekly photo trail that keeps each trade under its own number., and work stops when The weather-sensitive trade stops according to its own page. The coordinator does not force a closeout in peak heat or rain.. The measure is A bill that keeps trades separate, not a lump sum that dissolves the boundaries between them., then care stays as follows: A defects-liability window for the agreed snags, then each trade is closed on its own page.. This page does not teach plaster, interlock, turf or the concrete frame. Each of those has its own trade page.

No invented prices in the public page

In General contracting, “No invented prices in the public page” means The price follows the survey. It applies to A live site or an empty plot that needs coordination between successive trades, not a technical manual for each trade., and it is not accepted if Clashes between trades, handover without a snag list, or a mixed measure that adds two trades into one figure. appears.

The check uses A scope schedule, a survey minute, and a weekly photo trail that keeps each trade under its own number., and work stops when The weather-sensitive trade stops according to its own page. The coordinator does not force a closeout in peak heat or rain.. The measure is A bill that keeps trades separate, not a lump sum that dissolves the boundaries between them., then care stays as follows: A defects-liability window for the agreed snags, then each trade is closed on its own page.. This page does not teach plaster, interlock, turf or the concrete frame. Each of those has its own trade page.

Our work

Photos of the kind of work. The details of this service are above and below.

Entrance maintenance and renovation
Entrance maintenance and renovation
Courtyard maintenance and renovation
Courtyard maintenance and renovation
Outdoor floor renewal
Outdoor floor renewal
School yard development
School yard development
Gardens and facilities
Gardens and facilities
Path landscaping
Path landscaping
Parking yard renewal
Parking yard renewal
Sports field preparation
Sports field preparation

After general contracting is handed over

A defects-liability window for the agreed snags, then each trade is closed on its own page. This detail belongs only to General contracting and is not pasted onto another trade. The surface in question is A live site or an empty plot that needs coordination between successive trades, not a technical manual for each trade., and the exclusion is explicit: This page does not teach plaster, interlock, turf or the concrete frame. Each of those has its own trade page..

After handover the coordinator reviews snags only. Repair of each defect returns to that trade’s own page. This detail belongs only to General contracting and is not pasted onto another trade. The surface in question is A live site or an empty plot that needs coordination between successive trades, not a technical manual for each trade., and the exclusion is explicit: This page does not teach plaster, interlock, turf or the concrete frame. Each of those has its own trade page..

Summer in the central region and on the coast changes the order of pouring and finishes. The coordinator moves the schedule and does not redefine the trades. This detail belongs only to General contracting and is not pasted onto another trade. The surface in question is A live site or an empty plot that needs coordination between successive trades, not a technical manual for each trade., and the exclusion is explicit: This page does not teach plaster, interlock, turf or the concrete frame. Each of those has its own trade page..

If Clashes between trades, handover without a snag list, or a mixed measure that adds two trades into one figure. appears, this trade is reopened on the same surface. Work stops when The weather-sensitive trade stops according to its own page. The coordinator does not force a closeout in peak heat or rain.. Inspection uses A scope schedule, a survey minute, and a weekly photo trail that keeps each trade under its own number., and the agreed measure is A bill that keeps trades separate, not a lump sum that dissolves the boundaries between them.. After handover, care stays within A defects-liability window for the agreed snags, then each trade is closed on its own page..

General contracting across Saudi regions

How General contracting is carried out changes from one region to another with the climate and the access. Districts and the road from Jeddah are on the city page. The link in each region opens it.

General contracting in the Riyadh Region

The effect of the Riyadh Region on General contracting comes from this constraint: high daytime heat, dust, and a wide gap between afternoon and night temperatures. On A live site or an empty plot that needs coordination between successive trades, not a technical manual for each trade. that means delaying work if the constraint meets this limit: The weather-sensitive trade stops according to its own page. The coordinator does not force a closeout in peak heat or rain.. The defect looked for here is Clashes between trades, handover without a snag list, or a mixed measure that adds two trades into one figure., and the measure is A bill that keeps trades separate, not a lump sum that dissolves the boundaries between them.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Riyadh Region page and on its capital page.

General contracting in the Makkah Region

The effect of the Makkah Region on General contracting comes from this constraint: a hot humid coast in Jeddah and Rabigh, and rock and slopes in Makkah and Taif. On A live site or an empty plot that needs coordination between successive trades, not a technical manual for each trade. that means delaying work if the constraint meets this limit: The weather-sensitive trade stops according to its own page. The coordinator does not force a closeout in peak heat or rain.. The defect looked for here is Clashes between trades, handover without a snag list, or a mixed measure that adds two trades into one figure., and the measure is A bill that keeps trades separate, not a lump sum that dissolves the boundaries between them.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Makkah Region page and on its capital page.

General contracting in the Madinah Region

The effect of the Madinah Region on General contracting comes from this constraint: dry heat, volcanic harra around places such as Khaybar, and an industrial coast at Yanbu. On A live site or an empty plot that needs coordination between successive trades, not a technical manual for each trade. that means delaying work if the constraint meets this limit: The weather-sensitive trade stops according to its own page. The coordinator does not force a closeout in peak heat or rain.. The defect looked for here is Clashes between trades, handover without a snag list, or a mixed measure that adds two trades into one figure., and the measure is A bill that keeps trades separate, not a lump sum that dissolves the boundaries between them.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Madinah Region page and on its capital page.

General contracting in the Qassim Region

The effect of the Qassim Region on General contracting comes from this constraint: a dry Najd climate, dust, and agricultural and trading activity around Buraidah and Unaizah. On A live site or an empty plot that needs coordination between successive trades, not a technical manual for each trade. that means delaying work if the constraint meets this limit: The weather-sensitive trade stops according to its own page. The coordinator does not force a closeout in peak heat or rain.. The defect looked for here is Clashes between trades, handover without a snag list, or a mixed measure that adds two trades into one figure., and the measure is A bill that keeps trades separate, not a lump sum that dissolves the boundaries between them.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Qassim Region page and on its capital page.

General contracting in the Eastern Province

The effect of the Eastern Province on General contracting comes from this constraint: Gulf humidity, sabkha and groundwater on the coast, and high heat inland at Hafar Al Batin. On A live site or an empty plot that needs coordination between successive trades, not a technical manual for each trade. that means delaying work if the constraint meets this limit: The weather-sensitive trade stops according to its own page. The coordinator does not force a closeout in peak heat or rain.. The defect looked for here is Clashes between trades, handover without a snag list, or a mixed measure that adds two trades into one figure., and the measure is A bill that keeps trades separate, not a lump sum that dissolves the boundaries between them.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Eastern Province page and on its capital page.

General contracting in the Asir Region

The effect of the Asir Region on General contracting comes from this constraint: rainy foggy highlands around Abha, and stronger heat in Bisha and Tathlith. On A live site or an empty plot that needs coordination between successive trades, not a technical manual for each trade. that means delaying work if the constraint meets this limit: The weather-sensitive trade stops according to its own page. The coordinator does not force a closeout in peak heat or rain.. The defect looked for here is Clashes between trades, handover without a snag list, or a mixed measure that adds two trades into one figure., and the measure is A bill that keeps trades separate, not a lump sum that dissolves the boundaries between them.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Asir Region page and on its capital page.

General contracting in the Tabuk Region

The effect of the Tabuk Region on General contracting comes from this constraint: hot summers, cold nights in winter, wind, and a Red Sea coast at Al Wajh, Duba and Umluj. On A live site or an empty plot that needs coordination between successive trades, not a technical manual for each trade. that means delaying work if the constraint meets this limit: The weather-sensitive trade stops according to its own page. The coordinator does not force a closeout in peak heat or rain.. The defect looked for here is Clashes between trades, handover without a snag list, or a mixed measure that adds two trades into one figure., and the measure is A bill that keeps trades separate, not a lump sum that dissolves the boundaries between them.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Tabuk Region page and on its capital page.

General contracting in the Hail Region

The effect of the Hail Region on General contracting comes from this constraint: a dry northern climate, cold nights, and dust on open roads. On A live site or an empty plot that needs coordination between successive trades, not a technical manual for each trade. that means delaying work if the constraint meets this limit: The weather-sensitive trade stops according to its own page. The coordinator does not force a closeout in peak heat or rain.. The defect looked for here is Clashes between trades, handover without a snag list, or a mixed measure that adds two trades into one figure., and the measure is A bill that keeps trades separate, not a lump sum that dissolves the boundaries between them.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Hail Region page and on its capital page.

General contracting in the Northern Borders Region

The effect of the Northern Borders Region on General contracting comes from this constraint: geographic distance, a cold winter, and wind in small border cities. On A live site or an empty plot that needs coordination between successive trades, not a technical manual for each trade. that means delaying work if the constraint meets this limit: The weather-sensitive trade stops according to its own page. The coordinator does not force a closeout in peak heat or rain.. The defect looked for here is Clashes between trades, handover without a snag list, or a mixed measure that adds two trades into one figure., and the measure is A bill that keeps trades separate, not a lump sum that dissolves the boundaries between them.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Northern Borders Region page and on its capital page.

General contracting in the Jazan Region

The effect of the Jazan Region on General contracting comes from this constraint: humid Tihama heat, seasonal rain and wadis, and the island constraint of Farasan. On A live site or an empty plot that needs coordination between successive trades, not a technical manual for each trade. that means delaying work if the constraint meets this limit: The weather-sensitive trade stops according to its own page. The coordinator does not force a closeout in peak heat or rain.. The defect looked for here is Clashes between trades, handover without a snag list, or a mixed measure that adds two trades into one figure., and the measure is A bill that keeps trades separate, not a lump sum that dissolves the boundaries between them.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Jazan Region page and on its capital page.

General contracting in the Najran Region

The effect of the Najran Region on General contracting comes from this constraint: a valley between highlands, heat, and a distance from Jeddah that shows up in supply. On A live site or an empty plot that needs coordination between successive trades, not a technical manual for each trade. that means delaying work if the constraint meets this limit: The weather-sensitive trade stops according to its own page. The coordinator does not force a closeout in peak heat or rain.. The defect looked for here is Clashes between trades, handover without a snag list, or a mixed measure that adds two trades into one figure., and the measure is A bill that keeps trades separate, not a lump sum that dissolves the boundaries between them.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Najran Region page and on its capital page.

General contracting in the Al Bahah Region

The effect of the Al Bahah Region on General contracting comes from this constraint: highlands, fog, rain, and short mountain roads between towns. On A live site or an empty plot that needs coordination between successive trades, not a technical manual for each trade. that means delaying work if the constraint meets this limit: The weather-sensitive trade stops according to its own page. The coordinator does not force a closeout in peak heat or rain.. The defect looked for here is Clashes between trades, handover without a snag list, or a mixed measure that adds two trades into one figure., and the measure is A bill that keeps trades separate, not a lump sum that dissolves the boundaries between them.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Al Bahah Region page and on its capital page.

General contracting in the Al Jawf Region

The effect of the Al Jawf Region on General contracting comes from this constraint: an agricultural north, cold winters, and a long distance from Jeddah. On A live site or an empty plot that needs coordination between successive trades, not a technical manual for each trade. that means delaying work if the constraint meets this limit: The weather-sensitive trade stops according to its own page. The coordinator does not force a closeout in peak heat or rain.. The defect looked for here is Clashes between trades, handover without a snag list, or a mixed measure that adds two trades into one figure., and the measure is A bill that keeps trades separate, not a lump sum that dissolves the boundaries between them.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Al Jawf Region page and on its capital page.

A site example of general contracting

A small building that combines a frame, an interior package and yards: three trades are opened on three pages with three measures. This page explains only the sequence between them. This detail belongs only to General contracting and is not pasted onto another trade. The surface in question is A live site or an empty plot that needs coordination between successive trades, not a technical manual for each trade., and the exclusion is explicit: This page does not teach plaster, interlock, turf or the concrete frame. Each of those has its own trade page..

The example is not used to price plaster or interlock. Those figures are not created here. This detail belongs only to General contracting and is not pasted onto another trade. The surface in question is A live site or an empty plot that needs coordination between successive trades, not a technical manual for each trade., and the exclusion is explicit: This page does not teach plaster, interlock, turf or the concrete frame. Each of those has its own trade page..

If Clashes between trades, handover without a snag list, or a mixed measure that adds two trades into one figure. appears, this trade is reopened on the same surface. Work stops when The weather-sensitive trade stops according to its own page. The coordinator does not force a closeout in peak heat or rain.. Inspection uses A scope schedule, a survey minute, and a weekly photo trail that keeps each trade under its own number., and the agreed measure is A bill that keeps trades separate, not a lump sum that dissolves the boundaries between them.. After handover, care stays within A defects-liability window for the agreed snags, then each trade is closed on its own page..

The example shows how to think before a survey. It is not a contract and not an approved quantity. Any area the client states is checked on site because A bill that keeps trades separate, not a lump sum that dissolves the boundaries between them. may change after openings, slopes, or zones this trade does not cover are deducted.

What general contracting does not include

The work closest to General contracting is Residential building. Residential building explains construction of the dwelling itself, while this page explains coordination when several trades are involved. This page explains General contracting only.

If the project needs both, each one is listed in the quotation with its own quantity. Start at Residential building if that is the request, or continue here if the request is General contracting.

Handover papers: the trade schedule, photos of each trade, and a snag list split by name. This detail belongs only to General contracting and is not pasted onto another trade. The surface in question is A live site or an empty plot that needs coordination between successive trades, not a technical manual for each trade., and the exclusion is explicit: This page does not teach plaster, interlock, turf or the concrete frame. Each of those has its own trade page..

If Clashes between trades, handover without a snag list, or a mixed measure that adds two trades into one figure. appears, this trade is reopened on the same surface. Work stops when The weather-sensitive trade stops according to its own page. The coordinator does not force a closeout in peak heat or rain.. Inspection uses A scope schedule, a survey minute, and a weekly photo trail that keeps each trade under its own number., and the agreed measure is A bill that keeps trades separate, not a lump sum that dissolves the boundaries between them.. After handover, care stays within A defects-liability window for the agreed snags, then each trade is closed on its own page..

Common questions about general contracting

General contracting here means managing scope and the interface with the owner, not an encyclopedia of every building trade. If the request is a single trade, the correct page is that trade’s page, not this one.
It is requested when structure, finishes and external works sit in the same project and one coordinator must own the sequence. It is not a substitute for the villa page when the work is a new villa and no overlapping external trades need to be coordinated here.
Materials used for General contracting include: Written scope, Sequence schedule, Survey minute, Photo log, Separated bill. A list of trades by name without explaining how each one is built.
General contracting follows this order: Name the included trades, One site survey, Set the interfaces, Approve each measure, Release work in sequence. Skipping a step shows up at handover.
Mistakes we refuse in General contracting: Merging two trades into one quantity, Teaching plastering inside a management contract, Closing the job before snags, Changing scope verbally, Ignoring the city of the work. The cause of a defect is lost at handover.
The price of General contracting is set after the survey. It changes with: Number of opened trades, Distance of the city from Jeddah, Tight access, Heat or rain season, An existing building. The measure is A bill that keeps trades separate, not a lump sum that dissolves the boundaries between them.
At handover of General contracting we check: Every trade has a name and a page, The schedule shows sequence, Photos are attributed, Snags are closed or dated, The city is written on the request. No work is left without an owner.
A defects-liability window for the agreed snags, then each trade is closed on its own page. After handover the coordinator reviews snags only. Repair of each defect returns to that trade’s own page.
Summer in the central region and on the coast changes the order of pouring and finishes. The coordinator moves the schedule and does not redefine the trades. The visit date follows the city’s heat and the distance from the Jeddah office in Al Hamdaniyah.
A small building that combines a frame, an interior package and yards: three trades are opened on three pages with three measures. This page explains only the sequence between them. The example is not used to price plaster or interlock. Those figures are not created here.
This page does not teach plaster, interlock, turf or the concrete frame. Each of those has its own trade page. If the request is Residential building, the details are on its page, because Residential building explains construction of the dwelling itself, while this page explains coordination when several trades are involved.
No. It coordinates trades. Each trade stays on its page so its scope is clear and indexed alone.
The stated office is in Al Hamdaniyah, Jeddah. Other cities are served by scheduled surveys and execution, and each city page says so.
Send the city, the project type, and the trades you think are included. The names are separated and each trade page is identified.
Yes. In that case you do not need this page unless you want a coordinator for a wider scope.
The city, photos, and an approximate area or a drawing. Final quantities are not invented before the survey.