Scope of interlock

This page is only the method of concrete interlocking pavers, not the vehicle entrance as a slope and not the parking plan. This detail belongs only to Interlock and is not pasted onto another trade. The surface in question is Compacted soil and a gravel base graded to the required fall, ready for bedding sand, not for asphalt., and the exclusion is explicit: Asphalt is refused, bay and aisle design as a parking layout is refused, and garden planting and teaching the gate-apron slope are refused..

The apron slope at the gate and the width of the vehicle path are explained on the driveways page. This detail belongs only to Interlock and is not pasted onto another trade. The surface in question is Compacted soil and a gravel base graded to the required fall, ready for bedding sand, not for asphalt., and the exclusion is explicit: Asphalt is refused, bay and aisle design as a parking layout is refused, and garden planting and teaching the gate-apron slope are refused..

If Settlement on a wheel path, a joint empty of sand, an edge without restraint so the paver opens, or water ponding because the fall reversed after compaction. appears, this trade is reopened on the same surface. Work stops when Bedding stops if the bedding sand is saturated by rain, or if the concrete edge restraint cannot be cured in midday sun.. Inspection uses Level strings, a sand screed bar, a plate compactor, and a broom to work joint sand in., and the agreed measure is By the square metre of interlock after compaction, with the edge-restraint length kept separate so it is not lost inside a parking figure.. After handover, care stays within Replenishing joint sand after the first wash or wind, and watching the restraint edge during the defects period..

Asphalt is refused, bay and aisle design as a parking layout is refused, and garden planting and teaching the gate-apron slope are refused. If the project needs Driveways, the details are on the Driveways page. Driveways explain the gate apron, its longitudinal slope and the wheel-path width, while this page explains laying pavers, bedding sand, joints and restraint, and refuses to become a parking plan or an asphalt job.

We carry out Interlock in cities across Saudi Arabia. Season and access change from one city to another. Open your city from the region pages for the visit date, and stay here for how Interlock itself is done.

When we carry out interlock

An owner who wants an interlock surface with a correct bedding and compaction method, and who leaves entrance geometry and yard layout to their own pages. This detail belongs only to Interlock and is not pasted onto another trade. The surface in question is Compacted soil and a gravel base graded to the required fall, ready for bedding sand, not for asphalt., and the exclusion is explicit: Asphalt is refused, bay and aisle design as a parking layout is refused, and garden planting and teaching the gate-apron slope are refused..

It is requested when the decision is to use interlocking pavers, after the base is ready and before joint sand and compaction. This detail belongs only to Interlock and is not pasted onto another trade. The surface in question is Compacted soil and a gravel base graded to the required fall, ready for bedding sand, not for asphalt., and the exclusion is explicit: Asphalt is refused, bay and aisle design as a parking layout is refused, and garden planting and teaching the gate-apron slope are refused..

It is not requested for asphalt, nor for planting walkways, nor for counting and arranging parking bays. This detail belongs only to Interlock and is not pasted onto another trade. The surface in question is Compacted soil and a gravel base graded to the required fall, ready for bedding sand, not for asphalt., and the exclusion is explicit: Asphalt is refused, bay and aisle design as a parking layout is refused, and garden planting and teaching the gate-apron slope are refused..

If Settlement on a wheel path, a joint empty of sand, an edge without restraint so the paver opens, or water ponding because the fall reversed after compaction. appears, this trade is reopened on the same surface. Work stops when Bedding stops if the bedding sand is saturated by rain, or if the concrete edge restraint cannot be cured in midday sun.. Inspection uses Level strings, a sand screed bar, a plate compactor, and a broom to work joint sand in., and the agreed measure is By the square metre of interlock after compaction, with the edge-restraint length kept separate so it is not lost inside a parking figure.. After handover, care stays within Replenishing joint sand after the first wash or wind, and watching the restraint edge during the defects period..

A request for Interlock starts when the client names the city, the building and the limit of work. The office is in Jeddah, and visits in other cities are arranged by distance. This page explains the work itself.

Materials for interlock

The materials of Interlock are listed below. Each one has an acceptance rule. If the rule is missed, the batch is rejected before the work continues.

Interlocking concrete paver

In Interlock, “Interlocking concrete paver” means The shape locks into its neighbour, and mixing it with asphalt or a random slab that does not interlock is refused. It applies to Compacted soil and a gravel base graded to the required fall, ready for bedding sand, not for asphalt., and it is not accepted if Settlement on a wheel path, a joint empty of sand, an edge without restraint so the paver opens, or water ponding because the fall reversed after compaction. appears.

The check uses Level strings, a sand screed bar, a plate compactor, and a broom to work joint sand in., and work stops when Bedding stops if the bedding sand is saturated by rain, or if the concrete edge restraint cannot be cured in midday sun.. The measure is By the square metre of interlock after compaction, with the edge-restraint length kept separate so it is not lost inside a parking figure., then care stays as follows: Replenishing joint sand after the first wash or wind, and watching the restraint edge during the defects period.. Asphalt is refused, bay and aisle design as a parking layout is refused, and garden planting and teaching the gate-apron slope are refused.

Granular base

In Interlock, “Granular base” means It is compacted before the sand so the wheel line does not settle in the first weeks. It applies to Compacted soil and a gravel base graded to the required fall, ready for bedding sand, not for asphalt., and it is not accepted if Settlement on a wheel path, a joint empty of sand, an edge without restraint so the paver opens, or water ponding because the fall reversed after compaction. appears.

The check uses Level strings, a sand screed bar, a plate compactor, and a broom to work joint sand in., and work stops when Bedding stops if the bedding sand is saturated by rain, or if the concrete edge restraint cannot be cured in midday sun.. The measure is By the square metre of interlock after compaction, with the edge-restraint length kept separate so it is not lost inside a parking figure., then care stays as follows: Replenishing joint sand after the first wash or wind, and watching the restraint edge during the defects period.. Asphalt is refused, bay and aisle design as a parking layout is refused, and garden planting and teaching the gate-apron slope are refused.

Coarse dry bedding sand

In Interlock, “Coarse dry bedding sand” means It is screeded to a constant thickness, and sand saturated with water is lifted and replaced. It applies to Compacted soil and a gravel base graded to the required fall, ready for bedding sand, not for asphalt., and it is not accepted if Settlement on a wheel path, a joint empty of sand, an edge without restraint so the paver opens, or water ponding because the fall reversed after compaction. appears.

The check uses Level strings, a sand screed bar, a plate compactor, and a broom to work joint sand in., and work stops when Bedding stops if the bedding sand is saturated by rain, or if the concrete edge restraint cannot be cured in midday sun.. The measure is By the square metre of interlock after compaction, with the edge-restraint length kept separate so it is not lost inside a parking figure., then care stays as follows: Replenishing joint sand after the first wash or wind, and watching the restraint edge during the defects period.. Asphalt is refused, bay and aisle design as a parking layout is refused, and garden planting and teaching the gate-apron slope are refused.

Concrete haunch or kerb restraint

In Interlock, “Concrete haunch or kerb restraint” means It stops the paver escaping outward, and its concrete is water-cured in heat. It applies to Compacted soil and a gravel base graded to the required fall, ready for bedding sand, not for asphalt., and it is not accepted if Settlement on a wheel path, a joint empty of sand, an edge without restraint so the paver opens, or water ponding because the fall reversed after compaction. appears.

The check uses Level strings, a sand screed bar, a plate compactor, and a broom to work joint sand in., and work stops when Bedding stops if the bedding sand is saturated by rain, or if the concrete edge restraint cannot be cured in midday sun.. The measure is By the square metre of interlock after compaction, with the edge-restraint length kept separate so it is not lost inside a parking figure., then care stays as follows: Replenishing joint sand after the first wash or wind, and watching the restraint edge during the defects period.. Asphalt is refused, bay and aisle design as a parking layout is refused, and garden planting and teaching the gate-apron slope are refused.

Fine dry joint sand

In Interlock, “Fine dry joint sand” means It is broomed into the interlock after compaction so horizontal movement is locked. It applies to Compacted soil and a gravel base graded to the required fall, ready for bedding sand, not for asphalt., and it is not accepted if Settlement on a wheel path, a joint empty of sand, an edge without restraint so the paver opens, or water ponding because the fall reversed after compaction. appears.

The check uses Level strings, a sand screed bar, a plate compactor, and a broom to work joint sand in., and work stops when Bedding stops if the bedding sand is saturated by rain, or if the concrete edge restraint cannot be cured in midday sun.. The measure is By the square metre of interlock after compaction, with the edge-restraint length kept separate so it is not lost inside a parking figure., then care stays as follows: Replenishing joint sand after the first wash or wind, and watching the restraint edge during the defects period.. Asphalt is refused, bay and aisle design as a parking layout is refused, and garden planting and teaching the gate-apron slope are refused.

Fall string

In Interlock, “Fall string” means It fixes the water direction away from the wall before the pavers are laid. It applies to Compacted soil and a gravel base graded to the required fall, ready for bedding sand, not for asphalt., and it is not accepted if Settlement on a wheel path, a joint empty of sand, an edge without restraint so the paver opens, or water ponding because the fall reversed after compaction. appears.

The check uses Level strings, a sand screed bar, a plate compactor, and a broom to work joint sand in., and work stops when Bedding stops if the bedding sand is saturated by rain, or if the concrete edge restraint cannot be cured in midday sun.. The measure is By the square metre of interlock after compaction, with the edge-restraint length kept separate so it is not lost inside a parking figure., then care stays as follows: Replenishing joint sand after the first wash or wind, and watching the restraint edge during the defects period.. Asphalt is refused, bay and aisle design as a parking layout is refused, and garden planting and teaching the gate-apron slope are refused.

Steps for interlock

The order of steps in Interlock protects the quality of the work. Skipping a step to finish faster shows up at handover.

Compact soil and base

In Interlock, “Compact soil and base” means Settlement is corrected in the lower layer, not on top of the paver after handover. It applies to Compacted soil and a gravel base graded to the required fall, ready for bedding sand, not for asphalt., and it is not accepted if Settlement on a wheel path, a joint empty of sand, an edge without restraint so the paver opens, or water ponding because the fall reversed after compaction. appears.

The check uses Level strings, a sand screed bar, a plate compactor, and a broom to work joint sand in., and work stops when Bedding stops if the bedding sand is saturated by rain, or if the concrete edge restraint cannot be cured in midday sun.. The measure is By the square metre of interlock after compaction, with the edge-restraint length kept separate so it is not lost inside a parking figure., then care stays as follows: Replenishing joint sand after the first wash or wind, and watching the restraint edge during the defects period.. Asphalt is refused, bay and aisle design as a parking layout is refused, and garden planting and teaching the gate-apron slope are refused.

Cast and cure the restraint

In Interlock, “Cast and cure the restraint” means The edge sets before compaction, and at midday it is covered and wetted so it does not burn. It applies to Compacted soil and a gravel base graded to the required fall, ready for bedding sand, not for asphalt., and it is not accepted if Settlement on a wheel path, a joint empty of sand, an edge without restraint so the paver opens, or water ponding because the fall reversed after compaction. appears.

The check uses Level strings, a sand screed bar, a plate compactor, and a broom to work joint sand in., and work stops when Bedding stops if the bedding sand is saturated by rain, or if the concrete edge restraint cannot be cured in midday sun.. The measure is By the square metre of interlock after compaction, with the edge-restraint length kept separate so it is not lost inside a parking figure., then care stays as follows: Replenishing joint sand after the first wash or wind, and watching the restraint edge during the defects period.. Asphalt is refused, bay and aisle design as a parking layout is refused, and garden planting and teaching the gate-apron slope are refused.

Pull the fall strings

In Interlock, “Pull the fall strings” means Water is directed away from the threshold, without relying on an invented code number. It applies to Compacted soil and a gravel base graded to the required fall, ready for bedding sand, not for asphalt., and it is not accepted if Settlement on a wheel path, a joint empty of sand, an edge without restraint so the paver opens, or water ponding because the fall reversed after compaction. appears.

The check uses Level strings, a sand screed bar, a plate compactor, and a broom to work joint sand in., and work stops when Bedding stops if the bedding sand is saturated by rain, or if the concrete edge restraint cannot be cured in midday sun.. The measure is By the square metre of interlock after compaction, with the edge-restraint length kept separate so it is not lost inside a parking figure., then care stays as follows: Replenishing joint sand after the first wash or wind, and watching the restraint edge during the defects period.. Asphalt is refused, bay and aisle design as a parking layout is refused, and garden planting and teaching the gate-apron slope are refused.

Screed the bedding sand

In Interlock, “Screed the bedding sand” means The bar rides on two guides so the thickness stays even, with no footprints. It applies to Compacted soil and a gravel base graded to the required fall, ready for bedding sand, not for asphalt., and it is not accepted if Settlement on a wheel path, a joint empty of sand, an edge without restraint so the paver opens, or water ponding because the fall reversed after compaction. appears.

The check uses Level strings, a sand screed bar, a plate compactor, and a broom to work joint sand in., and work stops when Bedding stops if the bedding sand is saturated by rain, or if the concrete edge restraint cannot be cured in midday sun.. The measure is By the square metre of interlock after compaction, with the edge-restraint length kept separate so it is not lost inside a parking figure., then care stays as follows: Replenishing joint sand after the first wash or wind, and watching the restraint edge during the defects period.. Asphalt is refused, bay and aisle design as a parking layout is refused, and garden planting and teaching the gate-apron slope are refused.

Lay pavers from a restrained corner

In Interlock, “Lay pavers from a restrained corner” means The interlock advances in straight lines, and a broken piece is rejected. It applies to Compacted soil and a gravel base graded to the required fall, ready for bedding sand, not for asphalt., and it is not accepted if Settlement on a wheel path, a joint empty of sand, an edge without restraint so the paver opens, or water ponding because the fall reversed after compaction. appears.

The check uses Level strings, a sand screed bar, a plate compactor, and a broom to work joint sand in., and work stops when Bedding stops if the bedding sand is saturated by rain, or if the concrete edge restraint cannot be cured in midday sun.. The measure is By the square metre of interlock after compaction, with the edge-restraint length kept separate so it is not lost inside a parking figure., then care stays as follows: Replenishing joint sand after the first wash or wind, and watching the restraint edge during the defects period.. Asphalt is refused, bay and aisle design as a parking layout is refused, and garden planting and teaching the gate-apron slope are refused.

Cut the edges

In Interlock, “Cut the edges” means The gap between paver and restraint is closed with a fully cut piece, not with loose chips. It applies to Compacted soil and a gravel base graded to the required fall, ready for bedding sand, not for asphalt., and it is not accepted if Settlement on a wheel path, a joint empty of sand, an edge without restraint so the paver opens, or water ponding because the fall reversed after compaction. appears.

The check uses Level strings, a sand screed bar, a plate compactor, and a broom to work joint sand in., and work stops when Bedding stops if the bedding sand is saturated by rain, or if the concrete edge restraint cannot be cured in midday sun.. The measure is By the square metre of interlock after compaction, with the edge-restraint length kept separate so it is not lost inside a parking figure., then care stays as follows: Replenishing joint sand after the first wash or wind, and watching the restraint edge during the defects period.. Asphalt is refused, bay and aisle design as a parking layout is refused, and garden planting and teaching the gate-apron slope are refused.

Compact, then joint sand

In Interlock, “Compact, then joint sand” means The plate passes after laying is complete, then sand is broomed and a light compaction is repeated. It applies to Compacted soil and a gravel base graded to the required fall, ready for bedding sand, not for asphalt., and it is not accepted if Settlement on a wheel path, a joint empty of sand, an edge without restraint so the paver opens, or water ponding because the fall reversed after compaction. appears.

The check uses Level strings, a sand screed bar, a plate compactor, and a broom to work joint sand in., and work stops when Bedding stops if the bedding sand is saturated by rain, or if the concrete edge restraint cannot be cured in midday sun.. The measure is By the square metre of interlock after compaction, with the edge-restraint length kept separate so it is not lost inside a parking figure., then care stays as follows: Replenishing joint sand after the first wash or wind, and watching the restraint edge during the defects period.. Asphalt is refused, bay and aisle design as a parking layout is refused, and garden planting and teaching the gate-apron slope are refused.

Test for ponding

In Interlock, “Test for ponding” means The surface is watched after a light wash, and a ponding patch is lifted by resetting the fall, not with asphalt. It applies to Compacted soil and a gravel base graded to the required fall, ready for bedding sand, not for asphalt., and it is not accepted if Settlement on a wheel path, a joint empty of sand, an edge without restraint so the paver opens, or water ponding because the fall reversed after compaction. appears.

The check uses Level strings, a sand screed bar, a plate compactor, and a broom to work joint sand in., and work stops when Bedding stops if the bedding sand is saturated by rain, or if the concrete edge restraint cannot be cured in midday sun.. The measure is By the square metre of interlock after compaction, with the edge-restraint length kept separate so it is not lost inside a parking figure., then care stays as follows: Replenishing joint sand after the first wash or wind, and watching the restraint edge during the defects period.. Asphalt is refused, bay and aisle design as a parking layout is refused, and garden planting and teaching the gate-apron slope are refused.

Common mistakes in interlock

Compacting without an edge restraint

In Interlock, “Compacting without an edge restraint” means The paver creeps outward and opens the joints. It applies to Compacted soil and a gravel base graded to the required fall, ready for bedding sand, not for asphalt., and it is not accepted if Settlement on a wheel path, a joint empty of sand, an edge without restraint so the paver opens, or water ponding because the fall reversed after compaction. appears.

The check uses Level strings, a sand screed bar, a plate compactor, and a broom to work joint sand in., and work stops when Bedding stops if the bedding sand is saturated by rain, or if the concrete edge restraint cannot be cured in midday sun.. The measure is By the square metre of interlock after compaction, with the edge-restraint length kept separate so it is not lost inside a parking figure., then care stays as follows: Replenishing joint sand after the first wash or wind, and watching the restraint edge during the defects period.. Asphalt is refused, bay and aisle design as a parking layout is refused, and garden planting and teaching the gate-apron slope are refused.

Bedding on saturated sand

In Interlock, “Bedding on saturated sand” means Settlement shows under the wheel after the first use. It applies to Compacted soil and a gravel base graded to the required fall, ready for bedding sand, not for asphalt., and it is not accepted if Settlement on a wheel path, a joint empty of sand, an edge without restraint so the paver opens, or water ponding because the fall reversed after compaction. appears.

The check uses Level strings, a sand screed bar, a plate compactor, and a broom to work joint sand in., and work stops when Bedding stops if the bedding sand is saturated by rain, or if the concrete edge restraint cannot be cured in midday sun.. The measure is By the square metre of interlock after compaction, with the edge-restraint length kept separate so it is not lost inside a parking figure., then care stays as follows: Replenishing joint sand after the first wash or wind, and watching the restraint edge during the defects period.. Asphalt is refused, bay and aisle design as a parking layout is refused, and garden planting and teaching the gate-apron slope are refused.

Replacing interlock with asphalt

In Interlock, “Replacing interlock with asphalt” means That is another product and it is refused on this page. It applies to Compacted soil and a gravel base graded to the required fall, ready for bedding sand, not for asphalt., and it is not accepted if Settlement on a wheel path, a joint empty of sand, an edge without restraint so the paver opens, or water ponding because the fall reversed after compaction. appears.

The check uses Level strings, a sand screed bar, a plate compactor, and a broom to work joint sand in., and work stops when Bedding stops if the bedding sand is saturated by rain, or if the concrete edge restraint cannot be cured in midday sun.. The measure is By the square metre of interlock after compaction, with the edge-restraint length kept separate so it is not lost inside a parking figure., then care stays as follows: Replenishing joint sand after the first wash or wind, and watching the restraint edge during the defects period.. Asphalt is refused, bay and aisle design as a parking layout is refused, and garden planting and teaching the gate-apron slope are refused.

Leaving joints without sand

In Interlock, “Leaving joints without sand” means The paver moves sideways and clicks under traffic. It applies to Compacted soil and a gravel base graded to the required fall, ready for bedding sand, not for asphalt., and it is not accepted if Settlement on a wheel path, a joint empty of sand, an edge without restraint so the paver opens, or water ponding because the fall reversed after compaction. appears.

The check uses Level strings, a sand screed bar, a plate compactor, and a broom to work joint sand in., and work stops when Bedding stops if the bedding sand is saturated by rain, or if the concrete edge restraint cannot be cured in midday sun.. The measure is By the square metre of interlock after compaction, with the edge-restraint length kept separate so it is not lost inside a parking figure., then care stays as follows: Replenishing joint sand after the first wash or wind, and watching the restraint edge during the defects period.. Asphalt is refused, bay and aisle design as a parking layout is refused, and garden planting and teaching the gate-apron slope are refused.

Reversing the fall toward the wall

In Interlock, “Reversing the fall toward the wall” means Water gathers at the threshold after compaction if the string was not checked. It applies to Compacted soil and a gravel base graded to the required fall, ready for bedding sand, not for asphalt., and it is not accepted if Settlement on a wheel path, a joint empty of sand, an edge without restraint so the paver opens, or water ponding because the fall reversed after compaction. appears.

The check uses Level strings, a sand screed bar, a plate compactor, and a broom to work joint sand in., and work stops when Bedding stops if the bedding sand is saturated by rain, or if the concrete edge restraint cannot be cured in midday sun.. The measure is By the square metre of interlock after compaction, with the edge-restraint length kept separate so it is not lost inside a parking figure., then care stays as follows: Replenishing joint sand after the first wash or wind, and watching the restraint edge during the defects period.. Asphalt is refused, bay and aisle design as a parking layout is refused, and garden planting and teaching the gate-apron slope are refused.

Counting bays inside the paver trade

In Interlock, “Counting bays inside the paver trade” means The parking layout is another page, and planting belongs to a landscape page that is not included here. It applies to Compacted soil and a gravel base graded to the required fall, ready for bedding sand, not for asphalt., and it is not accepted if Settlement on a wheel path, a joint empty of sand, an edge without restraint so the paver opens, or water ponding because the fall reversed after compaction. appears.

The check uses Level strings, a sand screed bar, a plate compactor, and a broom to work joint sand in., and work stops when Bedding stops if the bedding sand is saturated by rain, or if the concrete edge restraint cannot be cured in midday sun.. The measure is By the square metre of interlock after compaction, with the edge-restraint length kept separate so it is not lost inside a parking figure., then care stays as follows: Replenishing joint sand after the first wash or wind, and watching the restraint edge during the defects period.. Asphalt is refused, bay and aisle design as a parking layout is refused, and garden planting and teaching the gate-apron slope are refused.

What affects the price of interlock

The price of Interlock is set after the survey, because it changes with the city, access, the surface and the season. The factors below show what raises or lowers the cost.

Base thickness

In Interlock, “Base thickness” means Weak soil needs a clearer base before the sand, and that is preparation, not a fixed price. It applies to Compacted soil and a gravel base graded to the required fall, ready for bedding sand, not for asphalt., and it is not accepted if Settlement on a wheel path, a joint empty of sand, an edge without restraint so the paver opens, or water ponding because the fall reversed after compaction. appears.

The check uses Level strings, a sand screed bar, a plate compactor, and a broom to work joint sand in., and work stops when Bedding stops if the bedding sand is saturated by rain, or if the concrete edge restraint cannot be cured in midday sun.. The measure is By the square metre of interlock after compaction, with the edge-restraint length kept separate so it is not lost inside a parking figure., then care stays as follows: Replenishing joint sand after the first wash or wind, and watching the restraint edge during the defects period.. Asphalt is refused, bay and aisle design as a parking layout is refused, and garden planting and teaching the gate-apron slope are refused.

Length of edge restraint

In Interlock, “Length of edge restraint” means A long perimeter adds edge concrete and its curing in heat. It applies to Compacted soil and a gravel base graded to the required fall, ready for bedding sand, not for asphalt., and it is not accepted if Settlement on a wheel path, a joint empty of sand, an edge without restraint so the paver opens, or water ponding because the fall reversed after compaction. appears.

The check uses Level strings, a sand screed bar, a plate compactor, and a broom to work joint sand in., and work stops when Bedding stops if the bedding sand is saturated by rain, or if the concrete edge restraint cannot be cured in midday sun.. The measure is By the square metre of interlock after compaction, with the edge-restraint length kept separate so it is not lost inside a parking figure., then care stays as follows: Replenishing joint sand after the first wash or wind, and watching the restraint edge during the defects period.. Asphalt is refused, bay and aisle design as a parking layout is refused, and garden planting and teaching the gate-apron slope are refused.

Cuts around rooms and gullies

In Interlock, “Cuts around rooms and gullies” means Small pieces raise waste above the laid area. It applies to Compacted soil and a gravel base graded to the required fall, ready for bedding sand, not for asphalt., and it is not accepted if Settlement on a wheel path, a joint empty of sand, an edge without restraint so the paver opens, or water ponding because the fall reversed after compaction. appears.

The check uses Level strings, a sand screed bar, a plate compactor, and a broom to work joint sand in., and work stops when Bedding stops if the bedding sand is saturated by rain, or if the concrete edge restraint cannot be cured in midday sun.. The measure is By the square metre of interlock after compaction, with the edge-restraint length kept separate so it is not lost inside a parking figure., then care stays as follows: Replenishing joint sand after the first wash or wind, and watching the restraint edge during the defects period.. Asphalt is refused, bay and aisle design as a parking layout is refused, and garden planting and teaching the gate-apron slope are refused.

Replacing sand after coastal wind

In Interlock, “Replacing sand after coastal wind” means Jeddah may need a second brooming before the minute is closed. It applies to Compacted soil and a gravel base graded to the required fall, ready for bedding sand, not for asphalt., and it is not accepted if Settlement on a wheel path, a joint empty of sand, an edge without restraint so the paver opens, or water ponding because the fall reversed after compaction. appears.

The check uses Level strings, a sand screed bar, a plate compactor, and a broom to work joint sand in., and work stops when Bedding stops if the bedding sand is saturated by rain, or if the concrete edge restraint cannot be cured in midday sun.. The measure is By the square metre of interlock after compaction, with the edge-restraint length kept separate so it is not lost inside a parking figure., then care stays as follows: Replenishing joint sand after the first wash or wind, and watching the restraint edge during the defects period.. Asphalt is refused, bay and aisle design as a parking layout is refused, and garden planting and teaching the gate-apron slope are refused.

Rain during screeding

In Interlock, “Rain during screeding” means Lifting saturated sand and screeding again adds time. It applies to Compacted soil and a gravel base graded to the required fall, ready for bedding sand, not for asphalt., and it is not accepted if Settlement on a wheel path, a joint empty of sand, an edge without restraint so the paver opens, or water ponding because the fall reversed after compaction. appears.

The check uses Level strings, a sand screed bar, a plate compactor, and a broom to work joint sand in., and work stops when Bedding stops if the bedding sand is saturated by rain, or if the concrete edge restraint cannot be cured in midday sun.. The measure is By the square metre of interlock after compaction, with the edge-restraint length kept separate so it is not lost inside a parking figure., then care stays as follows: Replenishing joint sand after the first wash or wind, and watching the restraint edge during the defects period.. Asphalt is refused, bay and aisle design as a parking layout is refused, and garden planting and teaching the gate-apron slope are refused.

Keeping the entrance outside the measure

In Interlock, “Keeping the entrance outside the measure” means The gate slope is measured on the driveways page so it does not dissolve into the paver metre. It applies to Compacted soil and a gravel base graded to the required fall, ready for bedding sand, not for asphalt., and it is not accepted if Settlement on a wheel path, a joint empty of sand, an edge without restraint so the paver opens, or water ponding because the fall reversed after compaction. appears.

The check uses Level strings, a sand screed bar, a plate compactor, and a broom to work joint sand in., and work stops when Bedding stops if the bedding sand is saturated by rain, or if the concrete edge restraint cannot be cured in midday sun.. The measure is By the square metre of interlock after compaction, with the edge-restraint length kept separate so it is not lost inside a parking figure., then care stays as follows: Replenishing joint sand after the first wash or wind, and watching the restraint edge during the defects period.. Asphalt is refused, bay and aisle design as a parking layout is refused, and garden planting and teaching the gate-apron slope are refused.

Handover of interlock

The restraint is continuous and cured

In Interlock, “The restraint is continuous and cured” means There is no gap for the paver to escape, and the fresh concrete is not burnt. It applies to Compacted soil and a gravel base graded to the required fall, ready for bedding sand, not for asphalt., and it is not accepted if Settlement on a wheel path, a joint empty of sand, an edge without restraint so the paver opens, or water ponding because the fall reversed after compaction. appears.

The check uses Level strings, a sand screed bar, a plate compactor, and a broom to work joint sand in., and work stops when Bedding stops if the bedding sand is saturated by rain, or if the concrete edge restraint cannot be cured in midday sun.. The measure is By the square metre of interlock after compaction, with the edge-restraint length kept separate so it is not lost inside a parking figure., then care stays as follows: Replenishing joint sand after the first wash or wind, and watching the restraint edge during the defects period.. Asphalt is refused, bay and aisle design as a parking layout is refused, and garden planting and teaching the gate-apron slope are refused.

Joints are full

In Interlock, “Joints are full” means Sand reaches the depth of the interlock, not only the surface. It applies to Compacted soil and a gravel base graded to the required fall, ready for bedding sand, not for asphalt., and it is not accepted if Settlement on a wheel path, a joint empty of sand, an edge without restraint so the paver opens, or water ponding because the fall reversed after compaction. appears.

The check uses Level strings, a sand screed bar, a plate compactor, and a broom to work joint sand in., and work stops when Bedding stops if the bedding sand is saturated by rain, or if the concrete edge restraint cannot be cured in midday sun.. The measure is By the square metre of interlock after compaction, with the edge-restraint length kept separate so it is not lost inside a parking figure., then care stays as follows: Replenishing joint sand after the first wash or wind, and watching the restraint edge during the defects period.. Asphalt is refused, bay and aisle design as a parking layout is refused, and garden planting and teaching the gate-apron slope are refused.

No pond after washing

In Interlock, “No pond after washing” means The fall still drains away from the wall after compaction. It applies to Compacted soil and a gravel base graded to the required fall, ready for bedding sand, not for asphalt., and it is not accepted if Settlement on a wheel path, a joint empty of sand, an edge without restraint so the paver opens, or water ponding because the fall reversed after compaction. appears.

The check uses Level strings, a sand screed bar, a plate compactor, and a broom to work joint sand in., and work stops when Bedding stops if the bedding sand is saturated by rain, or if the concrete edge restraint cannot be cured in midday sun.. The measure is By the square metre of interlock after compaction, with the edge-restraint length kept separate so it is not lost inside a parking figure., then care stays as follows: Replenishing joint sand after the first wash or wind, and watching the restraint edge during the defects period.. Asphalt is refused, bay and aisle design as a parking layout is refused, and garden planting and teaching the gate-apron slope are refused.

No break in the paver face

In Interlock, “No break in the paver face” means A chipped piece is replaced before the minute. It applies to Compacted soil and a gravel base graded to the required fall, ready for bedding sand, not for asphalt., and it is not accepted if Settlement on a wheel path, a joint empty of sand, an edge without restraint so the paver opens, or water ponding because the fall reversed after compaction. appears.

The check uses Level strings, a sand screed bar, a plate compactor, and a broom to work joint sand in., and work stops when Bedding stops if the bedding sand is saturated by rain, or if the concrete edge restraint cannot be cured in midday sun.. The measure is By the square metre of interlock after compaction, with the edge-restraint length kept separate so it is not lost inside a parking figure., then care stays as follows: Replenishing joint sand after the first wash or wind, and watching the restraint edge during the defects period.. Asphalt is refused, bay and aisle design as a parking layout is refused, and garden planting and teaching the gate-apron slope are refused.

The laying line is straight

In Interlock, “The laying line is straight” means The interlock does not drift along the length. It applies to Compacted soil and a gravel base graded to the required fall, ready for bedding sand, not for asphalt., and it is not accepted if Settlement on a wheel path, a joint empty of sand, an edge without restraint so the paver opens, or water ponding because the fall reversed after compaction. appears.

The check uses Level strings, a sand screed bar, a plate compactor, and a broom to work joint sand in., and work stops when Bedding stops if the bedding sand is saturated by rain, or if the concrete edge restraint cannot be cured in midday sun.. The measure is By the square metre of interlock after compaction, with the edge-restraint length kept separate so it is not lost inside a parking figure., then care stays as follows: Replenishing joint sand after the first wash or wind, and watching the restraint edge during the defects period.. Asphalt is refused, bay and aisle design as a parking layout is refused, and garden planting and teaching the gate-apron slope are refused.

No bay and no asphalt on the sheet

In Interlock, “No bay and no asphalt on the sheet” means Layout is a product of the parking page, and asphalt sits outside the written refusal. It applies to Compacted soil and a gravel base graded to the required fall, ready for bedding sand, not for asphalt., and it is not accepted if Settlement on a wheel path, a joint empty of sand, an edge without restraint so the paver opens, or water ponding because the fall reversed after compaction. appears.

The check uses Level strings, a sand screed bar, a plate compactor, and a broom to work joint sand in., and work stops when Bedding stops if the bedding sand is saturated by rain, or if the concrete edge restraint cannot be cured in midday sun.. The measure is By the square metre of interlock after compaction, with the edge-restraint length kept separate so it is not lost inside a parking figure., then care stays as follows: Replenishing joint sand after the first wash or wind, and watching the restraint edge during the defects period.. Asphalt is refused, bay and aisle design as a parking layout is refused, and garden planting and teaching the gate-apron slope are refused.

Our work

Photos of the kind of work. The details of this service are above and below.

Entrance maintenance and renovation
Entrance maintenance and renovation
Courtyard maintenance and renovation
Courtyard maintenance and renovation
Outdoor floor renewal
Outdoor floor renewal
School yard development
School yard development
Gardens and facilities
Gardens and facilities
Path landscaping
Path landscaping
Parking yard renewal
Parking yard renewal
Sports field preparation
Sports field preparation

After interlock is handed over

Replenishing joint sand after the first wash or wind, and watching the restraint edge during the defects period. This detail belongs only to Interlock and is not pasted onto another trade. The surface in question is Compacted soil and a gravel base graded to the required fall, ready for bedding sand, not for asphalt., and the exclusion is explicit: Asphalt is refused, bay and aisle design as a parking layout is refused, and garden planting and teaching the gate-apron slope are refused..

After handover joint sand is not stripped with a strong jet, and fresh concrete restraint is kept damp in hot weather until curing is complete. This detail belongs only to Interlock and is not pasted onto another trade. The surface in question is Compacted soil and a gravel base graded to the required fall, ready for bedding sand, not for asphalt., and the exclusion is explicit: Asphalt is refused, bay and aisle design as a parking layout is refused, and garden planting and teaching the gate-apron slope are refused..

Rain spoils bedding sand if it stays saturated. Summer heat requires the edge concrete to be covered and dampened. Jeddah’s salt wind sweeps joint sand, which is refilled after the wind drops. This detail belongs only to Interlock and is not pasted onto another trade. The surface in question is Compacted soil and a gravel base graded to the required fall, ready for bedding sand, not for asphalt., and the exclusion is explicit: Asphalt is refused, bay and aisle design as a parking layout is refused, and garden planting and teaching the gate-apron slope are refused..

If Settlement on a wheel path, a joint empty of sand, an edge without restraint so the paver opens, or water ponding because the fall reversed after compaction. appears, this trade is reopened on the same surface. Work stops when Bedding stops if the bedding sand is saturated by rain, or if the concrete edge restraint cannot be cured in midday sun.. Inspection uses Level strings, a sand screed bar, a plate compactor, and a broom to work joint sand in., and the agreed measure is By the square metre of interlock after compaction, with the edge-restraint length kept separate so it is not lost inside a parking figure.. After handover, care stays within Replenishing joint sand after the first wash or wind, and watching the restraint edge during the defects period..

Interlock across Saudi regions

How Interlock is carried out changes from one region to another with the climate and the access. Districts and the road from Jeddah are on the city page. The link in each region opens it.

Interlock in the Riyadh Region

The effect of the Riyadh Region on Interlock comes from this constraint: high daytime heat, dust, and a wide gap between afternoon and night temperatures. On Compacted soil and a gravel base graded to the required fall, ready for bedding sand, not for asphalt. that means delaying work if the constraint meets this limit: Bedding stops if the bedding sand is saturated by rain, or if the concrete edge restraint cannot be cured in midday sun.. The defect looked for here is Settlement on a wheel path, a joint empty of sand, an edge without restraint so the paver opens, or water ponding because the fall reversed after compaction., and the measure is By the square metre of interlock after compaction, with the edge-restraint length kept separate so it is not lost inside a parking figure.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Riyadh Region page and on its capital page.

Interlock in the Makkah Region

The effect of the Makkah Region on Interlock comes from this constraint: a hot humid coast in Jeddah and Rabigh, and rock and slopes in Makkah and Taif. On Compacted soil and a gravel base graded to the required fall, ready for bedding sand, not for asphalt. that means delaying work if the constraint meets this limit: Bedding stops if the bedding sand is saturated by rain, or if the concrete edge restraint cannot be cured in midday sun.. The defect looked for here is Settlement on a wheel path, a joint empty of sand, an edge without restraint so the paver opens, or water ponding because the fall reversed after compaction., and the measure is By the square metre of interlock after compaction, with the edge-restraint length kept separate so it is not lost inside a parking figure.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Makkah Region page and on its capital page.

Interlock in the Madinah Region

The effect of the Madinah Region on Interlock comes from this constraint: dry heat, volcanic harra around places such as Khaybar, and an industrial coast at Yanbu. On Compacted soil and a gravel base graded to the required fall, ready for bedding sand, not for asphalt. that means delaying work if the constraint meets this limit: Bedding stops if the bedding sand is saturated by rain, or if the concrete edge restraint cannot be cured in midday sun.. The defect looked for here is Settlement on a wheel path, a joint empty of sand, an edge without restraint so the paver opens, or water ponding because the fall reversed after compaction., and the measure is By the square metre of interlock after compaction, with the edge-restraint length kept separate so it is not lost inside a parking figure.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Madinah Region page and on its capital page.

Interlock in the Qassim Region

The effect of the Qassim Region on Interlock comes from this constraint: a dry Najd climate, dust, and agricultural and trading activity around Buraidah and Unaizah. On Compacted soil and a gravel base graded to the required fall, ready for bedding sand, not for asphalt. that means delaying work if the constraint meets this limit: Bedding stops if the bedding sand is saturated by rain, or if the concrete edge restraint cannot be cured in midday sun.. The defect looked for here is Settlement on a wheel path, a joint empty of sand, an edge without restraint so the paver opens, or water ponding because the fall reversed after compaction., and the measure is By the square metre of interlock after compaction, with the edge-restraint length kept separate so it is not lost inside a parking figure.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Qassim Region page and on its capital page.

Interlock in the Eastern Province

The effect of the Eastern Province on Interlock comes from this constraint: Gulf humidity, sabkha and groundwater on the coast, and high heat inland at Hafar Al Batin. On Compacted soil and a gravel base graded to the required fall, ready for bedding sand, not for asphalt. that means delaying work if the constraint meets this limit: Bedding stops if the bedding sand is saturated by rain, or if the concrete edge restraint cannot be cured in midday sun.. The defect looked for here is Settlement on a wheel path, a joint empty of sand, an edge without restraint so the paver opens, or water ponding because the fall reversed after compaction., and the measure is By the square metre of interlock after compaction, with the edge-restraint length kept separate so it is not lost inside a parking figure.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Eastern Province page and on its capital page.

Interlock in the Asir Region

The effect of the Asir Region on Interlock comes from this constraint: rainy foggy highlands around Abha, and stronger heat in Bisha and Tathlith. On Compacted soil and a gravel base graded to the required fall, ready for bedding sand, not for asphalt. that means delaying work if the constraint meets this limit: Bedding stops if the bedding sand is saturated by rain, or if the concrete edge restraint cannot be cured in midday sun.. The defect looked for here is Settlement on a wheel path, a joint empty of sand, an edge without restraint so the paver opens, or water ponding because the fall reversed after compaction., and the measure is By the square metre of interlock after compaction, with the edge-restraint length kept separate so it is not lost inside a parking figure.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Asir Region page and on its capital page.

Interlock in the Tabuk Region

The effect of the Tabuk Region on Interlock comes from this constraint: hot summers, cold nights in winter, wind, and a Red Sea coast at Al Wajh, Duba and Umluj. On Compacted soil and a gravel base graded to the required fall, ready for bedding sand, not for asphalt. that means delaying work if the constraint meets this limit: Bedding stops if the bedding sand is saturated by rain, or if the concrete edge restraint cannot be cured in midday sun.. The defect looked for here is Settlement on a wheel path, a joint empty of sand, an edge without restraint so the paver opens, or water ponding because the fall reversed after compaction., and the measure is By the square metre of interlock after compaction, with the edge-restraint length kept separate so it is not lost inside a parking figure.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Tabuk Region page and on its capital page.

Interlock in the Hail Region

The effect of the Hail Region on Interlock comes from this constraint: a dry northern climate, cold nights, and dust on open roads. On Compacted soil and a gravel base graded to the required fall, ready for bedding sand, not for asphalt. that means delaying work if the constraint meets this limit: Bedding stops if the bedding sand is saturated by rain, or if the concrete edge restraint cannot be cured in midday sun.. The defect looked for here is Settlement on a wheel path, a joint empty of sand, an edge without restraint so the paver opens, or water ponding because the fall reversed after compaction., and the measure is By the square metre of interlock after compaction, with the edge-restraint length kept separate so it is not lost inside a parking figure.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Hail Region page and on its capital page.

Interlock in the Northern Borders Region

The effect of the Northern Borders Region on Interlock comes from this constraint: geographic distance, a cold winter, and wind in small border cities. On Compacted soil and a gravel base graded to the required fall, ready for bedding sand, not for asphalt. that means delaying work if the constraint meets this limit: Bedding stops if the bedding sand is saturated by rain, or if the concrete edge restraint cannot be cured in midday sun.. The defect looked for here is Settlement on a wheel path, a joint empty of sand, an edge without restraint so the paver opens, or water ponding because the fall reversed after compaction., and the measure is By the square metre of interlock after compaction, with the edge-restraint length kept separate so it is not lost inside a parking figure.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Northern Borders Region page and on its capital page.

Interlock in the Jazan Region

The effect of the Jazan Region on Interlock comes from this constraint: humid Tihama heat, seasonal rain and wadis, and the island constraint of Farasan. On Compacted soil and a gravel base graded to the required fall, ready for bedding sand, not for asphalt. that means delaying work if the constraint meets this limit: Bedding stops if the bedding sand is saturated by rain, or if the concrete edge restraint cannot be cured in midday sun.. The defect looked for here is Settlement on a wheel path, a joint empty of sand, an edge without restraint so the paver opens, or water ponding because the fall reversed after compaction., and the measure is By the square metre of interlock after compaction, with the edge-restraint length kept separate so it is not lost inside a parking figure.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Jazan Region page and on its capital page.

Interlock in the Najran Region

The effect of the Najran Region on Interlock comes from this constraint: a valley between highlands, heat, and a distance from Jeddah that shows up in supply. On Compacted soil and a gravel base graded to the required fall, ready for bedding sand, not for asphalt. that means delaying work if the constraint meets this limit: Bedding stops if the bedding sand is saturated by rain, or if the concrete edge restraint cannot be cured in midday sun.. The defect looked for here is Settlement on a wheel path, a joint empty of sand, an edge without restraint so the paver opens, or water ponding because the fall reversed after compaction., and the measure is By the square metre of interlock after compaction, with the edge-restraint length kept separate so it is not lost inside a parking figure.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Najran Region page and on its capital page.

Interlock in the Al Bahah Region

The effect of the Al Bahah Region on Interlock comes from this constraint: highlands, fog, rain, and short mountain roads between towns. On Compacted soil and a gravel base graded to the required fall, ready for bedding sand, not for asphalt. that means delaying work if the constraint meets this limit: Bedding stops if the bedding sand is saturated by rain, or if the concrete edge restraint cannot be cured in midday sun.. The defect looked for here is Settlement on a wheel path, a joint empty of sand, an edge without restraint so the paver opens, or water ponding because the fall reversed after compaction., and the measure is By the square metre of interlock after compaction, with the edge-restraint length kept separate so it is not lost inside a parking figure.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Al Bahah Region page and on its capital page.

Interlock in the Al Jawf Region

The effect of the Al Jawf Region on Interlock comes from this constraint: an agricultural north, cold winters, and a long distance from Jeddah. On Compacted soil and a gravel base graded to the required fall, ready for bedding sand, not for asphalt. that means delaying work if the constraint meets this limit: Bedding stops if the bedding sand is saturated by rain, or if the concrete edge restraint cannot be cured in midday sun.. The defect looked for here is Settlement on a wheel path, a joint empty of sand, an edge without restraint so the paver opens, or water ponding because the fall reversed after compaction., and the measure is By the square metre of interlock after compaction, with the edge-restraint length kept separate so it is not lost inside a parking figure.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Al Jawf Region page and on its capital page.

A site example of interlock

A surface in front of a guard room is laid in interlock after a compacted base: the edge is restrained, the sand is screeded, the pavers are laid and compacted, then the sand is broomed. A bay count is not in the example. This detail belongs only to Interlock and is not pasted onto another trade. The surface in question is Compacted soil and a gravel base graded to the required fall, ready for bedding sand, not for asphalt., and the exclusion is explicit: Asphalt is refused, bay and aisle design as a parking layout is refused, and garden planting and teaching the gate-apron slope are refused..

A price, a finished project and an asphalt layer are not stated inside the example. This detail belongs only to Interlock and is not pasted onto another trade. The surface in question is Compacted soil and a gravel base graded to the required fall, ready for bedding sand, not for asphalt., and the exclusion is explicit: Asphalt is refused, bay and aisle design as a parking layout is refused, and garden planting and teaching the gate-apron slope are refused..

If Settlement on a wheel path, a joint empty of sand, an edge without restraint so the paver opens, or water ponding because the fall reversed after compaction. appears, this trade is reopened on the same surface. Work stops when Bedding stops if the bedding sand is saturated by rain, or if the concrete edge restraint cannot be cured in midday sun.. Inspection uses Level strings, a sand screed bar, a plate compactor, and a broom to work joint sand in., and the agreed measure is By the square metre of interlock after compaction, with the edge-restraint length kept separate so it is not lost inside a parking figure.. After handover, care stays within Replenishing joint sand after the first wash or wind, and watching the restraint edge during the defects period..

The example shows how to think before a survey. It is not a contract and not an approved quantity. Any area the client states is checked on site because By the square metre of interlock after compaction, with the edge-restraint length kept separate so it is not lost inside a parking figure. may change after openings, slopes, or zones this trade does not cover are deducted.

What interlock does not include

The work closest to Interlock is Driveways. Driveways explain the gate apron, its longitudinal slope and the wheel-path width, while this page explains laying pavers, bedding sand, joints and restraint, and refuses to become a parking plan or an asphalt job. This page explains Interlock only.

If the project needs both, each one is listed in the quotation with its own quantity. Start at Driveways if that is the request, or continue here if the request is Interlock.

The surface is handed over after compaction with a fall test that shows no pond, full joints, and a continuous restraint line. This detail belongs only to Interlock and is not pasted onto another trade. The surface in question is Compacted soil and a gravel base graded to the required fall, ready for bedding sand, not for asphalt., and the exclusion is explicit: Asphalt is refused, bay and aisle design as a parking layout is refused, and garden planting and teaching the gate-apron slope are refused..

If Settlement on a wheel path, a joint empty of sand, an edge without restraint so the paver opens, or water ponding because the fall reversed after compaction. appears, this trade is reopened on the same surface. Work stops when Bedding stops if the bedding sand is saturated by rain, or if the concrete edge restraint cannot be cured in midday sun.. Inspection uses Level strings, a sand screed bar, a plate compactor, and a broom to work joint sand in., and the agreed measure is By the square metre of interlock after compaction, with the edge-restraint length kept separate so it is not lost inside a parking figure.. After handover, care stays within Replenishing joint sand after the first wash or wind, and watching the restraint edge during the defects period..

Common questions about interlock

This page is only the method of concrete interlocking pavers, not the vehicle entrance as a slope and not the parking plan. The apron slope at the gate and the width of the vehicle path are explained on the driveways page.
It is requested when the decision is to use interlocking pavers, after the base is ready and before joint sand and compaction. It is not requested for asphalt, nor for planting walkways, nor for counting and arranging parking bays.
Materials used for Interlock include: Interlocking concrete paver, Granular base, Coarse dry bedding sand, Concrete haunch or kerb restraint, Fine dry joint sand. The shape locks into its neighbour, and mixing it with asphalt or a random slab that does not interlock is refused.
Interlock follows this order: Compact soil and base, Cast and cure the restraint, Pull the fall strings, Screed the bedding sand, Lay pavers from a restrained corner. Skipping a step shows up at handover.
Mistakes we refuse in Interlock: Compacting without an edge restraint, Bedding on saturated sand, Replacing interlock with asphalt, Leaving joints without sand, Reversing the fall toward the wall. The paver creeps outward and opens the joints.
The price of Interlock is set after the survey. It changes with: Base thickness, Length of edge restraint, Cuts around rooms and gullies, Replacing sand after coastal wind, Rain during screeding. The measure is By the square metre of interlock after compaction, with the edge-restraint length kept separate so it is not lost inside a parking figure.
At handover of Interlock we check: The restraint is continuous and cured, Joints are full, No pond after washing, No break in the paver face, The laying line is straight. There is no gap for the paver to escape, and the fresh concrete is not burnt.
Replenishing joint sand after the first wash or wind, and watching the restraint edge during the defects period. After handover joint sand is not stripped with a strong jet, and fresh concrete restraint is kept damp in hot weather until curing is complete.
Rain spoils bedding sand if it stays saturated. Summer heat requires the edge concrete to be covered and dampened. Jeddah’s salt wind sweeps joint sand, which is refilled after the wind drops. The visit date follows the city’s heat and the distance from the Jeddah office in Al Hamdaniyah.
A surface in front of a guard room is laid in interlock after a compacted base: the edge is restrained, the sand is screeded, the pavers are laid and compacted, then the sand is broomed. A bay count is not in the example. A price, a finished project and an asphalt layer are not stated inside the example.
Asphalt is refused, bay and aisle design as a parking layout is refused, and garden planting and teaching the gate-apron slope are refused. If the request is Driveways, the details are on its page, because Driveways explain the gate apron, its longitudinal slope and the wheel-path width, while this page explains laying pavers, bedding sand, joints and restraint, and refuses to become a parking plan or an asphalt job.
No. Arranging bays and the yard is on the parking-yards page. Here it is only interlocking pavers, their bedding layers and their restraint.
No. Asphalt is refused here. If the request is the slope of the gate apron, the place is the driveways page.
Because the restraint is missing or it was disturbed after compaction. The edge is closed with a kerb or concrete that is cured in heat before the plate compactor runs.
Humid wind sweeps the fine sand and empties the interlock. Brooming is repeated after the wind drops, and sea water is not mixed into the bedding.
From the Mayyas Alarab Contracting office in Al Hamdaniyah, Jeddah. Work in other cities is by a survey appointment, not from a branch.