Scope of rubber flooring
This page is rubber tiles or wet-pour only. Equipment layout and fall zones stay on the playground page. This detail belongs only to Rubber flooring and is not pasted onto another trade. The surface in question is A dry, solid concrete or asphalt base under the rubber, not loose soil and not an indoor hall floor., and the exclusion is explicit: The page refuses the play-area layout, equipment positions, anchor foundations, the fitness room, and the ball court..
Fall height arrives as a figure from the play-area drawing. We turn it into a rubber thickness, and we do not draw the equipment position. This detail belongs only to Rubber flooring and is not pasted onto another trade. The surface in question is A dry, solid concrete or asphalt base under the rubber, not loose soil and not an indoor hall floor., and the exclusion is explicit: The page refuses the play-area layout, equipment positions, anchor foundations, the fitness room, and the ball court..
If A tile that separates at the interlock, a pour that peels because rain mixed with the binder, or a thickness below the agreed fall height. appears, this trade is reopened on the same surface. Work stops when Wet-pour stops in the rain and on a hot base that dries the binder before levelling. Heat expands tiles if the edge is locked.. Inspection uses A thickness straightedge, a short spirit level, a tile knife, and a mixer for granules and binder in a wet-pour., and the agreed measure is By the rubber area and the agreed thickness, not by the number of play items and not by the metre of anchor foundations.. After handover, care stays within Re-bonding a lifted edge or replacing a broken tile of the same type, not moving a swing..
The page refuses the play-area layout, equipment positions, anchor foundations, the fitness room, and the ball court. If the project needs Playgrounds, the details are on the Playgrounds page. Children’s play areas lay out the play zone, the fall zones, and the equipment fixing, while this page is only the rubber surface, whether tile or wet-pour.
We carry out Rubber flooring in cities across Saudi Arabia. Season and access change from one city to another. Open your city from the region pages for the visit date, and stay here for how Rubber flooring itself is done.
When we carry out rubber flooring
Someone who wants a rubber surface under a play zone or a safe walk, with the fall height already written by the playground page. This detail belongs only to Rubber flooring and is not pasted onto another trade. The surface in question is A dry, solid concrete or asphalt base under the rubber, not loose soil and not an indoor hall floor., and the exclusion is explicit: The page refuses the play-area layout, equipment positions, anchor foundations, the fitness room, and the ball court..
It is requested when the base is ready and the need is a rubber surface of a known thickness. This detail belongs only to Rubber flooring and is not pasted onto another trade. The surface in question is A dry, solid concrete or asphalt base under the rubber, not loose soil and not an indoor hall floor., and the exclusion is explicit: The page refuses the play-area layout, equipment positions, anchor foundations, the fitness room, and the ball court..
It is not requested for designing a play area, for an indoor fitness-equipment floor, or for pitch turf. This detail belongs only to Rubber flooring and is not pasted onto another trade. The surface in question is A dry, solid concrete or asphalt base under the rubber, not loose soil and not an indoor hall floor., and the exclusion is explicit: The page refuses the play-area layout, equipment positions, anchor foundations, the fitness room, and the ball court..
If A tile that separates at the interlock, a pour that peels because rain mixed with the binder, or a thickness below the agreed fall height. appears, this trade is reopened on the same surface. Work stops when Wet-pour stops in the rain and on a hot base that dries the binder before levelling. Heat expands tiles if the edge is locked.. Inspection uses A thickness straightedge, a short spirit level, a tile knife, and a mixer for granules and binder in a wet-pour., and the agreed measure is By the rubber area and the agreed thickness, not by the number of play items and not by the metre of anchor foundations.. After handover, care stays within Re-bonding a lifted edge or replacing a broken tile of the same type, not moving a swing..
A request for Rubber flooring starts when the client names the city, the building and the limit of work. The office is in Jeddah, and visits in other cities are arranged by distance. This page explains the work itself.
Materials for rubber flooring
The materials of Rubber flooring are listed below. Each one has an acceptance rule. If the rule is missed, the batch is rejected before the work continues.
Interlocking rubber tile
In Rubber flooring, “Interlocking rubber tile” means Tile thickness is named in the request. A mixed colour or thickness in the same area without a joint is refused. It applies to A dry, solid concrete or asphalt base under the rubber, not loose soil and not an indoor hall floor., and it is not accepted if A tile that separates at the interlock, a pour that peels because rain mixed with the binder, or a thickness below the agreed fall height. appears.
The check uses A thickness straightedge, a short spirit level, a tile knife, and a mixer for granules and binder in a wet-pour., and work stops when Wet-pour stops in the rain and on a hot base that dries the binder before levelling. Heat expands tiles if the edge is locked.. The measure is By the rubber area and the agreed thickness, not by the number of play items and not by the metre of anchor foundations., then care stays as follows: Re-bonding a lifted edge or replacing a broken tile of the same type, not moving a swing.. The page refuses the play-area layout, equipment positions, anchor foundations, the fitness room, and the ball court.
Base granules for wet-pour
In Rubber flooring, “Base granules for wet-pour” means The black base layer is spread first at the thickness that completes the agreed fall height. It applies to A dry, solid concrete or asphalt base under the rubber, not loose soil and not an indoor hall floor., and it is not accepted if A tile that separates at the interlock, a pour that peels because rain mixed with the binder, or a thickness below the agreed fall height. appears.
The check uses A thickness straightedge, a short spirit level, a tile knife, and a mixer for granules and binder in a wet-pour., and work stops when Wet-pour stops in the rain and on a hot base that dries the binder before levelling. Heat expands tiles if the edge is locked.. The measure is By the rubber area and the agreed thickness, not by the number of play items and not by the metre of anchor foundations., then care stays as follows: Re-bonding a lifted edge or replacing a broken tile of the same type, not moving a swing.. The page refuses the play-area layout, equipment positions, anchor foundations, the fitness room, and the ball court.
Coloured wearing granules
In Rubber flooring, “Coloured wearing granules” means The wearing layer is thin and as colour-stable as the product allows. It is not a substitute for the safety thickness in the base layer. It applies to A dry, solid concrete or asphalt base under the rubber, not loose soil and not an indoor hall floor., and it is not accepted if A tile that separates at the interlock, a pour that peels because rain mixed with the binder, or a thickness below the agreed fall height. appears.
The check uses A thickness straightedge, a short spirit level, a tile knife, and a mixer for granules and binder in a wet-pour., and work stops when Wet-pour stops in the rain and on a hot base that dries the binder before levelling. Heat expands tiles if the edge is locked.. The measure is By the rubber area and the agreed thickness, not by the number of play items and not by the metre of anchor foundations., then care stays as follows: Re-bonding a lifted edge or replacing a broken tile of the same type, not moving a swing.. The page refuses the play-area layout, equipment positions, anchor foundations, the fitness room, and the ball court.
Binder
In Rubber flooring, “Binder” means It is mixed at the ratio the system maker states on site. It is not thinned with water. It applies to A dry, solid concrete or asphalt base under the rubber, not loose soil and not an indoor hall floor., and it is not accepted if A tile that separates at the interlock, a pour that peels because rain mixed with the binder, or a thickness below the agreed fall height. appears.
The check uses A thickness straightedge, a short spirit level, a tile knife, and a mixer for granules and binder in a wet-pour., and work stops when Wet-pour stops in the rain and on a hot base that dries the binder before levelling. Heat expands tiles if the edge is locked.. The measure is By the rubber area and the agreed thickness, not by the number of play items and not by the metre of anchor foundations., then care stays as follows: Re-bonding a lifted edge or replacing a broken tile of the same type, not moving a swing.. The page refuses the play-area layout, equipment positions, anchor foundations, the fitness room, and the ball court.
Edge restraint
In Rubber flooring, “Edge restraint” means The rubber edge is held by an angle or by adhesive so it does not turn up where the area ends. It applies to A dry, solid concrete or asphalt base under the rubber, not loose soil and not an indoor hall floor., and it is not accepted if A tile that separates at the interlock, a pour that peels because rain mixed with the binder, or a thickness below the agreed fall height. appears.
The check uses A thickness straightedge, a short spirit level, a tile knife, and a mixer for granules and binder in a wet-pour., and work stops when Wet-pour stops in the rain and on a hot base that dries the binder before levelling. Heat expands tiles if the edge is locked.. The measure is By the rubber area and the agreed thickness, not by the number of play items and not by the metre of anchor foundations., then care stays as follows: Re-bonding a lifted edge or replacing a broken tile of the same type, not moving a swing.. The page refuses the play-area layout, equipment positions, anchor foundations, the fitness room, and the ball court.
A dry solid base
In Rubber flooring, “A dry solid base” means Accepted concrete or asphalt. Compacted soil is not a base for this trade. It applies to A dry, solid concrete or asphalt base under the rubber, not loose soil and not an indoor hall floor., and it is not accepted if A tile that separates at the interlock, a pour that peels because rain mixed with the binder, or a thickness below the agreed fall height. appears.
The check uses A thickness straightedge, a short spirit level, a tile knife, and a mixer for granules and binder in a wet-pour., and work stops when Wet-pour stops in the rain and on a hot base that dries the binder before levelling. Heat expands tiles if the edge is locked.. The measure is By the rubber area and the agreed thickness, not by the number of play items and not by the metre of anchor foundations., then care stays as follows: Re-bonding a lifted edge or replacing a broken tile of the same type, not moving a swing.. The page refuses the play-area layout, equipment positions, anchor foundations, the fitness room, and the ball court.
Steps for rubber flooring
The order of steps in Rubber flooring protects the quality of the work. Skipping a step to finish faster shows up at handover.
Read the fall thickness
In Rubber flooring, “Read the fall thickness” means The figure comes from the playground page or the drawing. It is not invented here to hide an equipment position. It applies to A dry, solid concrete or asphalt base under the rubber, not loose soil and not an indoor hall floor., and it is not accepted if A tile that separates at the interlock, a pour that peels because rain mixed with the binder, or a thickness below the agreed fall height. appears.
The check uses A thickness straightedge, a short spirit level, a tile knife, and a mixer for granules and binder in a wet-pour., and work stops when Wet-pour stops in the rain and on a hot base that dries the binder before levelling. Heat expands tiles if the edge is locked.. The measure is By the rubber area and the agreed thickness, not by the number of play items and not by the metre of anchor foundations., then care stays as follows: Re-bonding a lifted edge or replacing a broken tile of the same type, not moving a swing.. The page refuses the play-area layout, equipment positions, anchor foundations, the fitness room, and the ball court.
Inspect the base
In Rubber flooring, “Inspect the base” means Dryness, solidity, and flatness are checked. A moving crack is repaired before the rubber. It applies to A dry, solid concrete or asphalt base under the rubber, not loose soil and not an indoor hall floor., and it is not accepted if A tile that separates at the interlock, a pour that peels because rain mixed with the binder, or a thickness below the agreed fall height. appears.
The check uses A thickness straightedge, a short spirit level, a tile knife, and a mixer for granules and binder in a wet-pour., and work stops when Wet-pour stops in the rain and on a hot base that dries the binder before levelling. Heat expands tiles if the edge is locked.. The measure is By the rubber area and the agreed thickness, not by the number of play items and not by the metre of anchor foundations., then care stays as follows: Re-bonding a lifted edge or replacing a broken tile of the same type, not moving a swing.. The page refuses the play-area layout, equipment positions, anchor foundations, the fitness room, and the ball court.
Mark the area only
In Rubber flooring, “Mark the area only” means The rubber limit is marked. Leg positions and foundations are not excavated on this page. It applies to A dry, solid concrete or asphalt base under the rubber, not loose soil and not an indoor hall floor., and it is not accepted if A tile that separates at the interlock, a pour that peels because rain mixed with the binder, or a thickness below the agreed fall height. appears.
The check uses A thickness straightedge, a short spirit level, a tile knife, and a mixer for granules and binder in a wet-pour., and work stops when Wet-pour stops in the rain and on a hot base that dries the binder before levelling. Heat expands tiles if the edge is locked.. The measure is By the rubber area and the agreed thickness, not by the number of play items and not by the metre of anchor foundations., then care stays as follows: Re-bonding a lifted edge or replacing a broken tile of the same type, not moving a swing.. The page refuses the play-area layout, equipment positions, anchor foundations, the fitness room, and the ball court.
Lay tiles or the base layer
In Rubber flooring, “Lay tiles or the base layer” means Tiles start from a fixed corner. Wet-pour starts with the base layer up to the thickness. It applies to A dry, solid concrete or asphalt base under the rubber, not loose soil and not an indoor hall floor., and it is not accepted if A tile that separates at the interlock, a pour that peels because rain mixed with the binder, or a thickness below the agreed fall height. appears.
The check uses A thickness straightedge, a short spirit level, a tile knife, and a mixer for granules and binder in a wet-pour., and work stops when Wet-pour stops in the rain and on a hot base that dries the binder before levelling. Heat expands tiles if the edge is locked.. The measure is By the rubber area and the agreed thickness, not by the number of play items and not by the metre of anchor foundations., then care stays as follows: Re-bonding a lifted edge or replacing a broken tile of the same type, not moving a swing.. The page refuses the play-area layout, equipment positions, anchor foundations, the fitness room, and the ball court.
Wearing layer of a wet-pour
In Rubber flooring, “Wearing layer of a wet-pour” means It is spread before the binder skins, and it is protected from rain and dust. It applies to A dry, solid concrete or asphalt base under the rubber, not loose soil and not an indoor hall floor., and it is not accepted if A tile that separates at the interlock, a pour that peels because rain mixed with the binder, or a thickness below the agreed fall height. appears.
The check uses A thickness straightedge, a short spirit level, a tile knife, and a mixer for granules and binder in a wet-pour., and work stops when Wet-pour stops in the rain and on a hot base that dries the binder before levelling. Heat expands tiles if the edge is locked.. The measure is By the rubber area and the agreed thickness, not by the number of play items and not by the metre of anchor foundations., then care stays as follows: Re-bonding a lifted edge or replacing a broken tile of the same type, not moving a swing.. The page refuses the play-area layout, equipment positions, anchor foundations, the fitness room, and the ball court.
Cut around obstacles
In Rubber flooring, “Cut around obstacles” means The cut is tight to an existing post without a gap that swallows a foot. The post itself is not part of the trade. It applies to A dry, solid concrete or asphalt base under the rubber, not loose soil and not an indoor hall floor., and it is not accepted if A tile that separates at the interlock, a pour that peels because rain mixed with the binder, or a thickness below the agreed fall height. appears.
The check uses A thickness straightedge, a short spirit level, a tile knife, and a mixer for granules and binder in a wet-pour., and work stops when Wet-pour stops in the rain and on a hot base that dries the binder before levelling. Heat expands tiles if the edge is locked.. The measure is By the rubber area and the agreed thickness, not by the number of play items and not by the metre of anchor foundations., then care stays as follows: Re-bonding a lifted edge or replacing a broken tile of the same type, not moving a swing.. The page refuses the play-area layout, equipment positions, anchor foundations, the fitness room, and the ball court.
Lock the perimeter
In Rubber flooring, “Lock the perimeter” means The last edge is fixed so tension or heat does not steal it. It applies to A dry, solid concrete or asphalt base under the rubber, not loose soil and not an indoor hall floor., and it is not accepted if A tile that separates at the interlock, a pour that peels because rain mixed with the binder, or a thickness below the agreed fall height. appears.
The check uses A thickness straightedge, a short spirit level, a tile knife, and a mixer for granules and binder in a wet-pour., and work stops when Wet-pour stops in the rain and on a hot base that dries the binder before levelling. Heat expands tiles if the edge is locked.. The measure is By the rubber area and the agreed thickness, not by the number of play items and not by the metre of anchor foundations., then care stays as follows: Re-bonding a lifted edge or replacing a broken tile of the same type, not moving a swing.. The page refuses the play-area layout, equipment positions, anchor foundations, the fitness room, and the ball court.
Measure thickness and hand over
In Rubber flooring, “Measure thickness and hand over” means Scattered points are measured and photographed. The equipment quantity is excluded. It applies to A dry, solid concrete or asphalt base under the rubber, not loose soil and not an indoor hall floor., and it is not accepted if A tile that separates at the interlock, a pour that peels because rain mixed with the binder, or a thickness below the agreed fall height. appears.
The check uses A thickness straightedge, a short spirit level, a tile knife, and a mixer for granules and binder in a wet-pour., and work stops when Wet-pour stops in the rain and on a hot base that dries the binder before levelling. Heat expands tiles if the edge is locked.. The measure is By the rubber area and the agreed thickness, not by the number of play items and not by the metre of anchor foundations., then care stays as follows: Re-bonding a lifted edge or replacing a broken tile of the same type, not moving a swing.. The page refuses the play-area layout, equipment positions, anchor foundations, the fitness room, and the ball court.
Common mistakes in rubber flooring
Pouring in the rain
In Rubber flooring, “Pouring in the rain” means The binder whitens and peels after a few days. It applies to A dry, solid concrete or asphalt base under the rubber, not loose soil and not an indoor hall floor., and it is not accepted if A tile that separates at the interlock, a pour that peels because rain mixed with the binder, or a thickness below the agreed fall height. appears.
The check uses A thickness straightedge, a short spirit level, a tile knife, and a mixer for granules and binder in a wet-pour., and work stops when Wet-pour stops in the rain and on a hot base that dries the binder before levelling. Heat expands tiles if the edge is locked.. The measure is By the rubber area and the agreed thickness, not by the number of play items and not by the metre of anchor foundations., then care stays as follows: Re-bonding a lifted edge or replacing a broken tile of the same type, not moving a swing.. The page refuses the play-area layout, equipment positions, anchor foundations, the fitness room, and the ball court.
A wearing colour without a base layer
In Rubber flooring, “A wearing colour without a base layer” means Colour does not replace fall height. It applies to A dry, solid concrete or asphalt base under the rubber, not loose soil and not an indoor hall floor., and it is not accepted if A tile that separates at the interlock, a pour that peels because rain mixed with the binder, or a thickness below the agreed fall height. appears.
The check uses A thickness straightedge, a short spirit level, a tile knife, and a mixer for granules and binder in a wet-pour., and work stops when Wet-pour stops in the rain and on a hot base that dries the binder before levelling. Heat expands tiles if the edge is locked.. The measure is By the rubber area and the agreed thickness, not by the number of play items and not by the metre of anchor foundations., then care stays as follows: Re-bonding a lifted edge or replacing a broken tile of the same type, not moving a swing.. The page refuses the play-area layout, equipment positions, anchor foundations, the fitness room, and the ball court.
Locking tiles with no room for heat
In Rubber flooring, “Locking tiles with no room for heat” means Edges crown in the summer afternoon. It applies to A dry, solid concrete or asphalt base under the rubber, not loose soil and not an indoor hall floor., and it is not accepted if A tile that separates at the interlock, a pour that peels because rain mixed with the binder, or a thickness below the agreed fall height. appears.
The check uses A thickness straightedge, a short spirit level, a tile knife, and a mixer for granules and binder in a wet-pour., and work stops when Wet-pour stops in the rain and on a hot base that dries the binder before levelling. Heat expands tiles if the edge is locked.. The measure is By the rubber area and the agreed thickness, not by the number of play items and not by the metre of anchor foundations., then care stays as follows: Re-bonding a lifted edge or replacing a broken tile of the same type, not moving a swing.. The page refuses the play-area layout, equipment positions, anchor foundations, the fitness room, and the ball court.
Drawing equipment inside the rubber item
In Rubber flooring, “Drawing equipment inside the rubber item” means It mixes this page with the playground page. It applies to A dry, solid concrete or asphalt base under the rubber, not loose soil and not an indoor hall floor., and it is not accepted if A tile that separates at the interlock, a pour that peels because rain mixed with the binder, or a thickness below the agreed fall height. appears.
The check uses A thickness straightedge, a short spirit level, a tile knife, and a mixer for granules and binder in a wet-pour., and work stops when Wet-pour stops in the rain and on a hot base that dries the binder before levelling. Heat expands tiles if the edge is locked.. The measure is By the rubber area and the agreed thickness, not by the number of play items and not by the metre of anchor foundations., then care stays as follows: Re-bonding a lifted edge or replacing a broken tile of the same type, not moving a swing.. The page refuses the play-area layout, equipment positions, anchor foundations, the fitness room, and the ball court.
Laying rubber on soil
In Rubber flooring, “Laying rubber on soil” means The tile sinks with the first rain. It applies to A dry, solid concrete or asphalt base under the rubber, not loose soil and not an indoor hall floor., and it is not accepted if A tile that separates at the interlock, a pour that peels because rain mixed with the binder, or a thickness below the agreed fall height. appears.
The check uses A thickness straightedge, a short spirit level, a tile knife, and a mixer for granules and binder in a wet-pour., and work stops when Wet-pour stops in the rain and on a hot base that dries the binder before levelling. Heat expands tiles if the edge is locked.. The measure is By the rubber area and the agreed thickness, not by the number of play items and not by the metre of anchor foundations., then care stays as follows: Re-bonding a lifted edge or replacing a broken tile of the same type, not moving a swing.. The page refuses the play-area layout, equipment positions, anchor foundations, the fitness room, and the ball court.
Using an indoor roll in the yard
In Rubber flooring, “Using an indoor roll in the yard” means A room product is not an outdoor safety tile, and its page is gym floors. It applies to A dry, solid concrete or asphalt base under the rubber, not loose soil and not an indoor hall floor., and it is not accepted if A tile that separates at the interlock, a pour that peels because rain mixed with the binder, or a thickness below the agreed fall height. appears.
The check uses A thickness straightedge, a short spirit level, a tile knife, and a mixer for granules and binder in a wet-pour., and work stops when Wet-pour stops in the rain and on a hot base that dries the binder before levelling. Heat expands tiles if the edge is locked.. The measure is By the rubber area and the agreed thickness, not by the number of play items and not by the metre of anchor foundations., then care stays as follows: Re-bonding a lifted edge or replacing a broken tile of the same type, not moving a swing.. The page refuses the play-area layout, equipment positions, anchor foundations, the fitness room, and the ball court.
What affects the price of rubber flooring
The price of Rubber flooring is set after the survey, because it changes with the city, access, the surface and the season. The factors below show what raises or lowers the cost.
Area and thickness
In Rubber flooring, “Area and thickness” means Greater thickness increases granules, not the number of play items. It applies to A dry, solid concrete or asphalt base under the rubber, not loose soil and not an indoor hall floor., and it is not accepted if A tile that separates at the interlock, a pour that peels because rain mixed with the binder, or a thickness below the agreed fall height. appears.
The check uses A thickness straightedge, a short spirit level, a tile knife, and a mixer for granules and binder in a wet-pour., and work stops when Wet-pour stops in the rain and on a hot base that dries the binder before levelling. Heat expands tiles if the edge is locked.. The measure is By the rubber area and the agreed thickness, not by the number of play items and not by the metre of anchor foundations., then care stays as follows: Re-bonding a lifted edge or replacing a broken tile of the same type, not moving a swing.. The page refuses the play-area layout, equipment positions, anchor foundations, the fitness room, and the ball court.
Tile or wet-pour
In Rubber flooring, “Tile or wet-pour” means Wet-pour needs site mixing and weather protection. Tile needs cutting at the edges. It applies to A dry, solid concrete or asphalt base under the rubber, not loose soil and not an indoor hall floor., and it is not accepted if A tile that separates at the interlock, a pour that peels because rain mixed with the binder, or a thickness below the agreed fall height. appears.
The check uses A thickness straightedge, a short spirit level, a tile knife, and a mixer for granules and binder in a wet-pour., and work stops when Wet-pour stops in the rain and on a hot base that dries the binder before levelling. Heat expands tiles if the edge is locked.. The measure is By the rubber area and the agreed thickness, not by the number of play items and not by the metre of anchor foundations., then care stays as follows: Re-bonding a lifted edge or replacing a broken tile of the same type, not moving a swing.. The page refuses the play-area layout, equipment positions, anchor foundations, the fitness room, and the ball court.
Many existing posts
In Rubber flooring, “Many existing posts” means Each cut around a post increases waste and time. It applies to A dry, solid concrete or asphalt base under the rubber, not loose soil and not an indoor hall floor., and it is not accepted if A tile that separates at the interlock, a pour that peels because rain mixed with the binder, or a thickness below the agreed fall height. appears.
The check uses A thickness straightedge, a short spirit level, a tile knife, and a mixer for granules and binder in a wet-pour., and work stops when Wet-pour stops in the rain and on a hot base that dries the binder before levelling. Heat expands tiles if the edge is locked.. The measure is By the rubber area and the agreed thickness, not by the number of play items and not by the metre of anchor foundations., then care stays as follows: Re-bonding a lifted edge or replacing a broken tile of the same type, not moving a swing.. The page refuses the play-area layout, equipment positions, anchor foundations, the fitness room, and the ball court.
Base temperature at the pour hour
In Rubber flooring, “Base temperature at the pour hour” means It forces an earlier start in summer. It applies to A dry, solid concrete or asphalt base under the rubber, not loose soil and not an indoor hall floor., and it is not accepted if A tile that separates at the interlock, a pour that peels because rain mixed with the binder, or a thickness below the agreed fall height. appears.
The check uses A thickness straightedge, a short spirit level, a tile knife, and a mixer for granules and binder in a wet-pour., and work stops when Wet-pour stops in the rain and on a hot base that dries the binder before levelling. Heat expands tiles if the edge is locked.. The measure is By the rubber area and the agreed thickness, not by the number of play items and not by the metre of anchor foundations., then care stays as follows: Re-bonding a lifted edge or replacing a broken tile of the same type, not moving a swing.. The page refuses the play-area layout, equipment positions, anchor foundations, the fitness room, and the ball court.
Distance of the site from Jeddah
In Rubber flooring, “Distance of the site from Jeddah” means Moving the mixer or the tiles is scheduled from the Al Hamdaniyah office. It applies to A dry, solid concrete or asphalt base under the rubber, not loose soil and not an indoor hall floor., and it is not accepted if A tile that separates at the interlock, a pour that peels because rain mixed with the binder, or a thickness below the agreed fall height. appears.
The check uses A thickness straightedge, a short spirit level, a tile knife, and a mixer for granules and binder in a wet-pour., and work stops when Wet-pour stops in the rain and on a hot base that dries the binder before levelling. Heat expands tiles if the edge is locked.. The measure is By the rubber area and the agreed thickness, not by the number of play items and not by the metre of anchor foundations., then care stays as follows: Re-bonding a lifted edge or replacing a broken tile of the same type, not moving a swing.. The page refuses the play-area layout, equipment positions, anchor foundations, the fitness room, and the ball court.
Repairing the base before rubber
In Rubber flooring, “Repairing the base before rubber” means Levelling broken concrete comes first and is not hidden inside an unstated rubber price. It applies to A dry, solid concrete or asphalt base under the rubber, not loose soil and not an indoor hall floor., and it is not accepted if A tile that separates at the interlock, a pour that peels because rain mixed with the binder, or a thickness below the agreed fall height. appears.
The check uses A thickness straightedge, a short spirit level, a tile knife, and a mixer for granules and binder in a wet-pour., and work stops when Wet-pour stops in the rain and on a hot base that dries the binder before levelling. Heat expands tiles if the edge is locked.. The measure is By the rubber area and the agreed thickness, not by the number of play items and not by the metre of anchor foundations., then care stays as follows: Re-bonding a lifted edge or replacing a broken tile of the same type, not moving a swing.. The page refuses the play-area layout, equipment positions, anchor foundations, the fitness room, and the ball court.
Handover of rubber flooring
Thickness at more than one point
In Rubber flooring, “Thickness at more than one point” means A single easy edge is not enough. It applies to A dry, solid concrete or asphalt base under the rubber, not loose soil and not an indoor hall floor., and it is not accepted if A tile that separates at the interlock, a pour that peels because rain mixed with the binder, or a thickness below the agreed fall height. appears.
The check uses A thickness straightedge, a short spirit level, a tile knife, and a mixer for granules and binder in a wet-pour., and work stops when Wet-pour stops in the rain and on a hot base that dries the binder before levelling. Heat expands tiles if the edge is locked.. The measure is By the rubber area and the agreed thickness, not by the number of play items and not by the metre of anchor foundations., then care stays as follows: Re-bonding a lifted edge or replacing a broken tile of the same type, not moving a swing.. The page refuses the play-area layout, equipment positions, anchor foundations, the fitness room, and the ball court.
Interlock or bond
In Rubber flooring, “Interlock or bond” means The next tile does not separate by hand, and the pour does not leave loose granules. It applies to A dry, solid concrete or asphalt base under the rubber, not loose soil and not an indoor hall floor., and it is not accepted if A tile that separates at the interlock, a pour that peels because rain mixed with the binder, or a thickness below the agreed fall height. appears.
The check uses A thickness straightedge, a short spirit level, a tile knife, and a mixer for granules and binder in a wet-pour., and work stops when Wet-pour stops in the rain and on a hot base that dries the binder before levelling. Heat expands tiles if the edge is locked.. The measure is By the rubber area and the agreed thickness, not by the number of play items and not by the metre of anchor foundations., then care stays as follows: Re-bonding a lifted edge or replacing a broken tile of the same type, not moving a swing.. The page refuses the play-area layout, equipment positions, anchor foundations, the fitness room, and the ball court.
Rubber surface drainage
In Rubber flooring, “Rubber surface drainage” means Test water does not make a pool in the middle of the area. It applies to A dry, solid concrete or asphalt base under the rubber, not loose soil and not an indoor hall floor., and it is not accepted if A tile that separates at the interlock, a pour that peels because rain mixed with the binder, or a thickness below the agreed fall height. appears.
The check uses A thickness straightedge, a short spirit level, a tile knife, and a mixer for granules and binder in a wet-pour., and work stops when Wet-pour stops in the rain and on a hot base that dries the binder before levelling. Heat expands tiles if the edge is locked.. The measure is By the rubber area and the agreed thickness, not by the number of play items and not by the metre of anchor foundations., then care stays as follows: Re-bonding a lifted edge or replacing a broken tile of the same type, not moving a swing.. The page refuses the play-area layout, equipment positions, anchor foundations, the fitness room, and the ball court.
Edges held
In Rubber flooring, “Edges held” means No lip rises at the exit. It applies to A dry, solid concrete or asphalt base under the rubber, not loose soil and not an indoor hall floor., and it is not accepted if A tile that separates at the interlock, a pour that peels because rain mixed with the binder, or a thickness below the agreed fall height. appears.
The check uses A thickness straightedge, a short spirit level, a tile knife, and a mixer for granules and binder in a wet-pour., and work stops when Wet-pour stops in the rain and on a hot base that dries the binder before levelling. Heat expands tiles if the edge is locked.. The measure is By the rubber area and the agreed thickness, not by the number of play items and not by the metre of anchor foundations., then care stays as follows: Re-bonding a lifted edge or replacing a broken tile of the same type, not moving a swing.. The page refuses the play-area layout, equipment positions, anchor foundations, the fitness room, and the ball court.
Colour even within the batch
In Rubber flooring, “Colour even within the batch” means No patch of excess binder on the face. It applies to A dry, solid concrete or asphalt base under the rubber, not loose soil and not an indoor hall floor., and it is not accepted if A tile that separates at the interlock, a pour that peels because rain mixed with the binder, or a thickness below the agreed fall height. appears.
The check uses A thickness straightedge, a short spirit level, a tile knife, and a mixer for granules and binder in a wet-pour., and work stops when Wet-pour stops in the rain and on a hot base that dries the binder before levelling. Heat expands tiles if the edge is locked.. The measure is By the rubber area and the agreed thickness, not by the number of play items and not by the metre of anchor foundations., then care stays as follows: Re-bonding a lifted edge or replacing a broken tile of the same type, not moving a swing.. The page refuses the play-area layout, equipment positions, anchor foundations, the fitness room, and the ball court.
Equipment drawing outside the bill
In Rubber flooring, “Equipment drawing outside the bill” means This page does not count swings or excavations. It applies to A dry, solid concrete or asphalt base under the rubber, not loose soil and not an indoor hall floor., and it is not accepted if A tile that separates at the interlock, a pour that peels because rain mixed with the binder, or a thickness below the agreed fall height. appears.
The check uses A thickness straightedge, a short spirit level, a tile knife, and a mixer for granules and binder in a wet-pour., and work stops when Wet-pour stops in the rain and on a hot base that dries the binder before levelling. Heat expands tiles if the edge is locked.. The measure is By the rubber area and the agreed thickness, not by the number of play items and not by the metre of anchor foundations., then care stays as follows: Re-bonding a lifted edge or replacing a broken tile of the same type, not moving a swing.. The page refuses the play-area layout, equipment positions, anchor foundations, the fitness room, and the ball court.
Our work
Photos of the kind of work. The details of this service are above and below.
After rubber flooring is handed over
Re-bonding a lifted edge or replacing a broken tile of the same type, not moving a swing. This detail belongs only to Rubber flooring and is not pasted onto another trade. The surface in question is A dry, solid concrete or asphalt base under the rubber, not loose soil and not an indoor hall floor., and the exclusion is explicit: The page refuses the play-area layout, equipment positions, anchor foundations, the fitness room, and the ball court..
Care is cleaning the surface and repairing a lifted edge. Moving a piece of equipment means the playground page, then a thickness review here. This detail belongs only to Rubber flooring and is not pasted onto another trade. The surface in question is A dry, solid concrete or asphalt base under the rubber, not loose soil and not an indoor hall floor., and the exclusion is explicit: The page refuses the play-area layout, equipment positions, anchor foundations, the fitness room, and the ball court..
Summer on the coast and inland narrows the pour hour because the base burns the binder, and a sudden rain spoils an open batch. This detail belongs only to Rubber flooring and is not pasted onto another trade. The surface in question is A dry, solid concrete or asphalt base under the rubber, not loose soil and not an indoor hall floor., and the exclusion is explicit: The page refuses the play-area layout, equipment positions, anchor foundations, the fitness room, and the ball court..
If A tile that separates at the interlock, a pour that peels because rain mixed with the binder, or a thickness below the agreed fall height. appears, this trade is reopened on the same surface. Work stops when Wet-pour stops in the rain and on a hot base that dries the binder before levelling. Heat expands tiles if the edge is locked.. Inspection uses A thickness straightedge, a short spirit level, a tile knife, and a mixer for granules and binder in a wet-pour., and the agreed measure is By the rubber area and the agreed thickness, not by the number of play items and not by the metre of anchor foundations.. After handover, care stays within Re-bonding a lifted edge or replacing a broken tile of the same type, not moving a swing..
Rubber flooring across Saudi regions
How Rubber flooring is carried out changes from one region to another with the climate and the access. Districts and the road from Jeddah are on the city page. The link in each region opens it.
Rubber flooring in the Riyadh Region
The effect of the Riyadh Region on Rubber flooring comes from this constraint: high daytime heat, dust, and a wide gap between afternoon and night temperatures. On A dry, solid concrete or asphalt base under the rubber, not loose soil and not an indoor hall floor. that means delaying work if the constraint meets this limit: Wet-pour stops in the rain and on a hot base that dries the binder before levelling. Heat expands tiles if the edge is locked.. The defect looked for here is A tile that separates at the interlock, a pour that peels because rain mixed with the binder, or a thickness below the agreed fall height., and the measure is By the rubber area and the agreed thickness, not by the number of play items and not by the metre of anchor foundations.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Riyadh Region page and on its capital page.
Rubber flooring in the Makkah Region
The effect of the Makkah Region on Rubber flooring comes from this constraint: a hot humid coast in Jeddah and Rabigh, and rock and slopes in Makkah and Taif. On A dry, solid concrete or asphalt base under the rubber, not loose soil and not an indoor hall floor. that means delaying work if the constraint meets this limit: Wet-pour stops in the rain and on a hot base that dries the binder before levelling. Heat expands tiles if the edge is locked.. The defect looked for here is A tile that separates at the interlock, a pour that peels because rain mixed with the binder, or a thickness below the agreed fall height., and the measure is By the rubber area and the agreed thickness, not by the number of play items and not by the metre of anchor foundations.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Makkah Region page and on its capital page.
Rubber flooring in the Madinah Region
The effect of the Madinah Region on Rubber flooring comes from this constraint: dry heat, volcanic harra around places such as Khaybar, and an industrial coast at Yanbu. On A dry, solid concrete or asphalt base under the rubber, not loose soil and not an indoor hall floor. that means delaying work if the constraint meets this limit: Wet-pour stops in the rain and on a hot base that dries the binder before levelling. Heat expands tiles if the edge is locked.. The defect looked for here is A tile that separates at the interlock, a pour that peels because rain mixed with the binder, or a thickness below the agreed fall height., and the measure is By the rubber area and the agreed thickness, not by the number of play items and not by the metre of anchor foundations.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Madinah Region page and on its capital page.
Rubber flooring in the Qassim Region
The effect of the Qassim Region on Rubber flooring comes from this constraint: a dry Najd climate, dust, and agricultural and trading activity around Buraidah and Unaizah. On A dry, solid concrete or asphalt base under the rubber, not loose soil and not an indoor hall floor. that means delaying work if the constraint meets this limit: Wet-pour stops in the rain and on a hot base that dries the binder before levelling. Heat expands tiles if the edge is locked.. The defect looked for here is A tile that separates at the interlock, a pour that peels because rain mixed with the binder, or a thickness below the agreed fall height., and the measure is By the rubber area and the agreed thickness, not by the number of play items and not by the metre of anchor foundations.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Qassim Region page and on its capital page.
Rubber flooring in the Eastern Province
The effect of the Eastern Province on Rubber flooring comes from this constraint: Gulf humidity, sabkha and groundwater on the coast, and high heat inland at Hafar Al Batin. On A dry, solid concrete or asphalt base under the rubber, not loose soil and not an indoor hall floor. that means delaying work if the constraint meets this limit: Wet-pour stops in the rain and on a hot base that dries the binder before levelling. Heat expands tiles if the edge is locked.. The defect looked for here is A tile that separates at the interlock, a pour that peels because rain mixed with the binder, or a thickness below the agreed fall height., and the measure is By the rubber area and the agreed thickness, not by the number of play items and not by the metre of anchor foundations.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Eastern Province page and on its capital page.
Rubber flooring in the Asir Region
The effect of the Asir Region on Rubber flooring comes from this constraint: rainy foggy highlands around Abha, and stronger heat in Bisha and Tathlith. On A dry, solid concrete or asphalt base under the rubber, not loose soil and not an indoor hall floor. that means delaying work if the constraint meets this limit: Wet-pour stops in the rain and on a hot base that dries the binder before levelling. Heat expands tiles if the edge is locked.. The defect looked for here is A tile that separates at the interlock, a pour that peels because rain mixed with the binder, or a thickness below the agreed fall height., and the measure is By the rubber area and the agreed thickness, not by the number of play items and not by the metre of anchor foundations.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Asir Region page and on its capital page.
Rubber flooring in the Tabuk Region
The effect of the Tabuk Region on Rubber flooring comes from this constraint: hot summers, cold nights in winter, wind, and a Red Sea coast at Al Wajh, Duba and Umluj. On A dry, solid concrete or asphalt base under the rubber, not loose soil and not an indoor hall floor. that means delaying work if the constraint meets this limit: Wet-pour stops in the rain and on a hot base that dries the binder before levelling. Heat expands tiles if the edge is locked.. The defect looked for here is A tile that separates at the interlock, a pour that peels because rain mixed with the binder, or a thickness below the agreed fall height., and the measure is By the rubber area and the agreed thickness, not by the number of play items and not by the metre of anchor foundations.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Tabuk Region page and on its capital page.
Rubber flooring in the Hail Region
The effect of the Hail Region on Rubber flooring comes from this constraint: a dry northern climate, cold nights, and dust on open roads. On A dry, solid concrete or asphalt base under the rubber, not loose soil and not an indoor hall floor. that means delaying work if the constraint meets this limit: Wet-pour stops in the rain and on a hot base that dries the binder before levelling. Heat expands tiles if the edge is locked.. The defect looked for here is A tile that separates at the interlock, a pour that peels because rain mixed with the binder, or a thickness below the agreed fall height., and the measure is By the rubber area and the agreed thickness, not by the number of play items and not by the metre of anchor foundations.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Hail Region page and on its capital page.
Rubber flooring in the Northern Borders Region
The effect of the Northern Borders Region on Rubber flooring comes from this constraint: geographic distance, a cold winter, and wind in small border cities. On A dry, solid concrete or asphalt base under the rubber, not loose soil and not an indoor hall floor. that means delaying work if the constraint meets this limit: Wet-pour stops in the rain and on a hot base that dries the binder before levelling. Heat expands tiles if the edge is locked.. The defect looked for here is A tile that separates at the interlock, a pour that peels because rain mixed with the binder, or a thickness below the agreed fall height., and the measure is By the rubber area and the agreed thickness, not by the number of play items and not by the metre of anchor foundations.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Northern Borders Region page and on its capital page.
Rubber flooring in the Jazan Region
The effect of the Jazan Region on Rubber flooring comes from this constraint: humid Tihama heat, seasonal rain and wadis, and the island constraint of Farasan. On A dry, solid concrete or asphalt base under the rubber, not loose soil and not an indoor hall floor. that means delaying work if the constraint meets this limit: Wet-pour stops in the rain and on a hot base that dries the binder before levelling. Heat expands tiles if the edge is locked.. The defect looked for here is A tile that separates at the interlock, a pour that peels because rain mixed with the binder, or a thickness below the agreed fall height., and the measure is By the rubber area and the agreed thickness, not by the number of play items and not by the metre of anchor foundations.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Jazan Region page and on its capital page.
Rubber flooring in the Najran Region
The effect of the Najran Region on Rubber flooring comes from this constraint: a valley between highlands, heat, and a distance from Jeddah that shows up in supply. On A dry, solid concrete or asphalt base under the rubber, not loose soil and not an indoor hall floor. that means delaying work if the constraint meets this limit: Wet-pour stops in the rain and on a hot base that dries the binder before levelling. Heat expands tiles if the edge is locked.. The defect looked for here is A tile that separates at the interlock, a pour that peels because rain mixed with the binder, or a thickness below the agreed fall height., and the measure is By the rubber area and the agreed thickness, not by the number of play items and not by the metre of anchor foundations.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Najran Region page and on its capital page.
Rubber flooring in the Al Bahah Region
The effect of the Al Bahah Region on Rubber flooring comes from this constraint: highlands, fog, rain, and short mountain roads between towns. On A dry, solid concrete or asphalt base under the rubber, not loose soil and not an indoor hall floor. that means delaying work if the constraint meets this limit: Wet-pour stops in the rain and on a hot base that dries the binder before levelling. Heat expands tiles if the edge is locked.. The defect looked for here is A tile that separates at the interlock, a pour that peels because rain mixed with the binder, or a thickness below the agreed fall height., and the measure is By the rubber area and the agreed thickness, not by the number of play items and not by the metre of anchor foundations.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Al Bahah Region page and on its capital page.
Rubber flooring in the Al Jawf Region
The effect of the Al Jawf Region on Rubber flooring comes from this constraint: an agricultural north, cold winters, and a long distance from Jeddah. On A dry, solid concrete or asphalt base under the rubber, not loose soil and not an indoor hall floor. that means delaying work if the constraint meets this limit: Wet-pour stops in the rain and on a hot base that dries the binder before levelling. Heat expands tiles if the edge is locked.. The defect looked for here is A tile that separates at the interlock, a pour that peels because rain mixed with the binder, or a thickness below the agreed fall height., and the measure is By the rubber area and the agreed thickness, not by the number of play items and not by the metre of anchor foundations.. Districts and the road from Jeddah are not repeated in this paragraph. They are on the Al Jawf Region page and on its capital page.
A site example of rubber flooring
A fall area under a swing with wet-pour at a thickness taken from the play drawing: the rubber is measured here. The swing position and its foundation are on the playground page. This detail belongs only to Rubber flooring and is not pasted onto another trade. The surface in question is A dry, solid concrete or asphalt base under the rubber, not loose soil and not an indoor hall floor., and the exclusion is explicit: The page refuses the play-area layout, equipment positions, anchor foundations, the fitness room, and the ball court..
The example is not priced in riyals and does not count the equipment. This detail belongs only to Rubber flooring and is not pasted onto another trade. The surface in question is A dry, solid concrete or asphalt base under the rubber, not loose soil and not an indoor hall floor., and the exclusion is explicit: The page refuses the play-area layout, equipment positions, anchor foundations, the fitness room, and the ball court..
If A tile that separates at the interlock, a pour that peels because rain mixed with the binder, or a thickness below the agreed fall height. appears, this trade is reopened on the same surface. Work stops when Wet-pour stops in the rain and on a hot base that dries the binder before levelling. Heat expands tiles if the edge is locked.. Inspection uses A thickness straightedge, a short spirit level, a tile knife, and a mixer for granules and binder in a wet-pour., and the agreed measure is By the rubber area and the agreed thickness, not by the number of play items and not by the metre of anchor foundations.. After handover, care stays within Re-bonding a lifted edge or replacing a broken tile of the same type, not moving a swing..
The example shows how to think before a survey. It is not a contract and not an approved quantity. Any area the client states is checked on site because By the rubber area and the agreed thickness, not by the number of play items and not by the metre of anchor foundations. may change after openings, slopes, or zones this trade does not cover are deducted.
What rubber flooring does not include
The work closest to Rubber flooring is Playgrounds. Children’s play areas lay out the play zone, the fall zones, and the equipment fixing, while this page is only the rubber surface, whether tile or wet-pour. This page explains Rubber flooring only.
If the project needs both, each one is listed in the quotation with its own quantity. Start at Playgrounds if that is the request, or continue here if the request is Rubber flooring.
The rubber is handed over with thickness at several points, edges bonded, and a surface that sheds water without a pool on the granules. This detail belongs only to Rubber flooring and is not pasted onto another trade. The surface in question is A dry, solid concrete or asphalt base under the rubber, not loose soil and not an indoor hall floor., and the exclusion is explicit: The page refuses the play-area layout, equipment positions, anchor foundations, the fitness room, and the ball court..
If A tile that separates at the interlock, a pour that peels because rain mixed with the binder, or a thickness below the agreed fall height. appears, this trade is reopened on the same surface. Work stops when Wet-pour stops in the rain and on a hot base that dries the binder before levelling. Heat expands tiles if the edge is locked.. Inspection uses A thickness straightedge, a short spirit level, a tile knife, and a mixer for granules and binder in a wet-pour., and the agreed measure is By the rubber area and the agreed thickness, not by the number of play items and not by the metre of anchor foundations.. After handover, care stays within Re-bonding a lifted edge or replacing a broken tile of the same type, not moving a swing..









